MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex
25 Eccleston Place, Victoria, London SW1W 9NFhello@drawingsdirect.co.uk020 7864 7245WhatsApp

Free 2026 London Planning Report — Every report and survey DrawingsDirect sells

Old blue-print cross-sections through four villas, with stairs, floors and roofs drawn in white line, the kind of drawing a report is checked against
Reports and Surveys

Every report and survey DrawingsDirect sells

A London project can need a report from five families: planning, building regulations, surveys, party wall and specialist reports such as flood, ecology or daylight. This page lists all of them in that order, with the fixed fee beside each, from £19 for a one-page constraints check. It also shows how to tell which ones your council wants, and which pairs are easy to confuse. No VAT is charged on any fee.

Fixed fee from £19 · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

How to tell which report your council wants

A valid planning application needs a completed form, the correct fee, compliance with national information requirements and provision of local information requirements. Reports sit in the last two. The national requirements are the same in every English council: plans and drawings, an ownership certificate and agricultural land declaration, and for some applications a Design and Access Statement or a fire statement.

Everything else is local. Each council may add to the national list through a local list of information requirements. The planning practice guidance says those requirements must be specified on a formally adopted local list published on the council's website less than 2 years before the application is submitted, and that local requirements have no bearing on whether a planning application is valid unless they are set out on such a list. So a report that is not on your council's current list cannot be a reason to refuse to register your application, however useful it would be.

The practical step is short. Search your council's website for its 'validation requirements' or 'local list', check the publication date, and look for your type of project. If the page is old, or the list is vague, a planning constraints report is a quick first step, and a pre-application request gets the planning officer to say in writing what they expect. You can also send us the list: we will tell you which of the reports on this page it is asking for.

Reports and Surveys

from £19

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • Every report we sell on one page, grouped by what it is for
  • The fixed fee beside each report, with no form in front of it
  • A way to find out which reports your own council wants
  • Plain pairs for the reports people mix up
  • Honest notes where a cheaper route or no report at all will do
  • A link to the page that explains each report in full
Finding the report you need
  1. Read your council's list

    Every council publishes the extra documents it expects with an application. Find yours before you order anything.

  2. Match the problem

    Planning, building regulations, survey, party wall or specialist: pick the family that fits your stage.

  3. Check the look-alikes

    Fire statement or fire strategy, regularisation or retrospective planning, FRA or SuDS, PEA or BNG.

  4. Order with the fee shown

    Each report has its own page and fixed fee, so you know what you pay before you ask.

Planning reports: when each one earns its fee

Start with the question you are trying to answer. Wondering whether a house can be extended at all? The feasibility study or, before a purchase, the pre-purchase planning report. Ready to apply and your council has asked for a document? The statements (planning, design and access, heritage) are written for exactly that.

After the application, the same family covers what comes next: discharging planning conditions, amending an approved scheme, a householder appeal if the council refused, and a retrospective application or certificate of lawful existing use for work already in place.

London high street lined with Victorian shopfront parades and flats above
Box dormer loft conversion on the back of a London terrace, seen from the next street

A valid planning application needs a completed form, the correct fee, compliance with national information requirements and provision of local information requirements.

Planning Practice Guidance, Making an application, paragraph 015: a valid application needs (source wording: "compliance with national information requirements" and "provision of local information requirements"). www.gov.uk

Which is which: four pairs people mix up

Fire statement or fire strategy? The Development Management Procedure Order 2015 requires a fire statement with a planning application only where the building contains two or more dwellings (or educational accommodation) and is 18 metres or 7 storeys, as article 9A sets out. Most London homes are far below that. For them the planning question is London Plan policy D12, which our fire safety statement answers. A fire strategy plan is a different document altogether: building regulations drawings showing escape, warning and compartmentation in a loft, conversion or flat.

Regularisation or retrospective planning? They answer different questions, and work done without either approval may need both. Regularisation is the building regulations remedy: it applies to unauthorised work carried out on or after 11th November 1985, and the additional work is measured against the requirements applicable to that work when it was carried out. A retrospective planning application asks the council to grant permission for what is already built. If the work is old enough, a certificate of lawful existing use may settle the planning side instead, because operations in England are now immune from enforcement after ten years from substantial completion for work finished since 25 April 2024.

Flood risk assessment or SuDS statement? A flood risk assessment is about the risk to your site, from rivers, the sea, surface water and groundwater, and what the design does about it. A SuDS drainage statement is about what your development does to rainwater: where it goes now, where it will go, and how the drainage is looked after. A site in a flood zone often needs the first; most new buildings and larger extensions need the second.

Preliminary ecological appraisal or biodiversity net gain? The appraisal is an ecologist's records check and walkover that says which habitats and species your site holds and whether a protected-species survey comes next, such as a bat survey. Biodiversity net gain is the habitat-unit calculation and gain plan. They can draw on the same site visit, and we check first whether your site is exempt from net gain.

Building regulations reports

Building regulations are a separate approval from planning. The eight reports in that family, and the rule for picking between Full Plans and Building Notice, are on the building regulations reports page. In short: drawings for a new job, comments answered once building control has replied, a building regulations drawings review before you submit a set made elsewhere, and regularisation for work already built.

DrawingsDirect sample planning sheet with proposed plans and elevations at 1:100 and a site plan at 1:500
Sample drawing

Surveys, party wall and specialist reports

Almost every drawing we make starts from a measured building survey. If the job is only a set of plans for a sale or a letting, floor plans are the shorter route. Where the work touches a shared wall, the boundary or a neighbour's foundations, party wall notices come before the builder starts; the party wall services page explains the Act and the rest of that family.

Our own team prepares the specialist reports alongside your drawings: daylight and sunlight, trees, bats, energy and transport. Where the law needs a licensed person, for example a bat survey licence, the page says so and we arrange that person inside the fixed fee. A construction management plan is written up on our sister site, Drawings4Planning.

Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
national information requirementsPlanning Practice Guidance, Making an application, paragraph 015: a valid application needs (source wording: "compliance with national information requirements" and "provision of local information requirements")www.gov.uk
ownership certificate and agricultural land declarationPlanning Practice Guidance, Making an application, paragraph 021: the national requirements include (source wording: "Ownership Certificate and Agricultural Land Declaration"), plans and drawings, and for some applications a Design and Access Statement or a fire statementwww.gov.uk
less than 2 yearsPlanning Practice Guidance, Making an application, paragraph 038: local requirements are specified on (source wording: "a formally adopted 'local list' which has been published on its website less than 2 years before an application is submitted")www.gov.uk
no bearing on whether a planning application is validPlanning Practice Guidance, Making an application, paragraph 038: (source wording: "Local information requirements have no bearing on whether a planning application is valid unless they are set out on such a list")www.gov.uk
18 metres or 7 storeysDMPO 2015 art 9A(2)-(4): a fire statement is required for a building with two or more dwellings (or educational accommodation) and (source wording: "the building is 18 metres or more in height; or the building contains 7 or more storeys")www.legislation.gov.uk
11th November 1985Building Regulations 2010 reg 18(1): regularisation applies where unauthorised building work has been carried out (source wording: "on or after 11th November 1985")www.legislation.gov.uk
applicable to that work when it was carried outBuilding Regulations 2010 reg 18(2)(d): the plan shows additional work to meet the requirements (source wording: "which were applicable to that work when it was carried out")www.legislation.gov.uk
ten yearsTown and Country Planning Act 1990 s171B(1)(a), as amended for England from 25 April 2024 (Levelling-up and Regeneration Act 2023 s115; S.I. 2024/452): operations (source wording: "ten years beginning with the date on which the operations were substantially completed")www.legislation.gov.uk
Reports

Every report on this page, with its fixed fee

ReportFixed feeWhat it is
London council guidesFreeWhat each council asks for, and which reports its lists trigger
Planning constraints report£19One-page check of conservation area, Article 4, listing and flood zone for an address Written up on fixedfeeplans.co.uk.
Pre-purchase planning report£195Before you buy: planning history, constraints and what you could build Written up on fixedfeeplans.co.uk.
Feasibility study£495What you can build, which planning route fits and what to expect, before full drawings Written up on www.propertyarchitecture.com.
Planning statement£315How your scheme meets the local plan and national policy, for applications that need one Written up on fixedfeeplans.co.uk.
Design and Access Statement£245Written for the planning applications that legally need one Written up on fixedfeeplans.co.uk.
Heritage statement£595Significance and impact for listed buildings and conservation areas Written up on fixedfeeplans.co.uk.
Pre-application advice request£265We prepare and send your request to the council, with plans and your questions Written up on fixedfeeplans.co.uk.
Householder planning appeal£449Review of a refusal, grounds of appeal and the appeal submitted for you
Retrospective planning application£495 drawings + £200 survey (£695 total)As-built survey and drawings for work already done without permission Written up on fixedfeeplans.co.uk.
Discharge of planning conditions£345The details each condition on your decision notice asks for, submitted to the council Written up on fixedfeeplans.co.uk.
Planning amendments£295Change an approved scheme: non-material amendment, section 73 variation or new application Written up on fixedfeeplans.co.uk.
Certificate of lawful existing use£750 drawings + £200 survey (£950 total)Proof that an old extension, conversion or use can no longer be enforced against
Building regulations reports: which one fitsFreeFree guide to choosing between the building regulations reports below
Building control comments answered£245Plans rejected or approved with conditions: each comment answered, drawings amended
Building regulations drawings review£300A Part-by-Part check of a building regulations set made elsewhere, before you submit
Building regulations regularisation£645 drawings + £200 survey (£845 total)Building work done without sign-off, put on the record with building control
Part O overheating check£175The simplified-method overheating check for a new home, with the drawing changes it asks for
SAP calculations£225The energy calculation for a new home or conversion, run by an assessor we coordinate
Fire safety statement£135A short statement for a planning application, answering London Plan policy D12 Written up on fixedfeeplans.co.uk.
Fire strategy plans£445Escape, warning and compartmentation drawn on plans for lofts, conversions and flats Written up on fixedfeeplans.co.uk.
Measured building survey£200The millimetre-accurate survey your extension or loft is designed and built from
Topographical survey£200Levels, boundaries and features on Ordnance Survey grid and datum
Floor plans£275Laser-measured floor plans drawn to scale, for sale, letting or lease
Party wall notices and drawings£45Notices served, drawings prepared and a schedule of condition recorded
Flood risk assessment£395Site-specific assessment for planning, with a drainage note, for homes in flood zones Written up on fixedfeeplans.co.uk.
SuDS drainage statement£315Where the rain goes now, where it will go after the work, and how it is looked after Written up on fixedfeeplans.co.uk.
Daylight and sunlight report£895Assessment to the BRE guide, prepared by a specialist we coordinate Written up on www.propertyarchitecture.co.uk.
Tree survey for planning£445Tree survey and protection plan by an arboriculturist we coordinate Written up on www.propertyarchitecture.co.uk.
Bat survey for planning£495Bat roost assessment for lofts, extensions and demolitions by a licensed ecologist Written up on www.propertyarchitecture.co.uk.
Preliminary ecological appraisal£625Records check and site walkover saying what your site holds and which surveys come next Written up on www.propertyarchitecture.co.uk.
Biodiversity net gain report£725We check first whether your site is exempt, then prepare the metric and gain plan if not Written up on www.propertyarchitecture.co.uk.
Energy statement£445London Plan energy statement prepared by an accredited assessor we coordinate Written up on www.propertyarchitecture.co.uk.
Transport statement£425Access, parking and trip impact for a small scheme of 1 to 4 homes Written up on www.propertyarchitecture.co.uk.
Construction management plan£575For a basement, new build or tight site, written to discharge the condition Written up on www.drawings4planning.co.uk.
FAQ

Questions people ask

How do I find out which reports my council needs?
Search the council's website for its validation requirements or local list and check the publication date. Under the planning practice guidance, local requirements only affect validity if they are set out on a formally adopted list less than 2 years old.
Is a fire statement the same as a fire strategy?
No. A fire statement is a planning document, required by article 9A only for certain tall buildings with two or more dwellings. A fire strategy is a building regulations drawing of escape, warning and compartmentation.
Do I need regularisation or retrospective planning permission?
They are separate approvals. Regularisation is for building work done without building regulations sign-off; retrospective planning is for work done without planning permission. Work done without either may need both.
Are the fees shown final?
Each fee is the total you pay to us for that report, with no VAT charged. Council fees, building control charges and a solicitor's fee for sworn statements are separate and paid to the council or the solicitor.
Which report should I buy first?
If you are unsure what a site allows, the planning constraints report is a one-page check and the smallest fee on this page. Send us your address and your council's list and we will say which others you need.

Photographs: Jules Bilmeyer Joseph Van Riel (CC0).