Party Wall Notices & Drawings

Party Wall Notices & Drawings in London | Fixed Fee

Party wall notices served, party wall drawings prepared and a schedule of condition recorded, for a fixed fee.

Get your fixed-fee quote

60 seconds now. A no-obligation fixed quote back within one working day — with a free planning appraisal.

No obligation · No spam · Reply within 1 working day
Open-plan London interior created by an approved party wall notices & drawings project
Isometric illustration of a London home extension design
Proposed floor plan
MCIAT chartered

Most London terraces and semis share at least one wall with a neighbour, so a loft steel, a side return or a basement dig very often falls under the Party Wall etc. Act 1996. The Act is a civil process between you and your neighbour. Planning permission does not replace it, and a neighbour who never commented on your planning application can still be entitled to notice.

DrawingsDirect is a chartered architectural technologist practice (MCIAT), not an architect. We work out from your drawings which notices your project needs, prepare and serve them, produce the sections and details that the notice and any surveyors need, and record the condition of the neighbouring property before work starts. Our fee for each part is fixed and agreed before we start.

Fixed fees from £45 (see all prices) · Drawings in ~7 days · Free redraws to approval.

Do I need a party wall notice for my London project?

You need one if the work cuts into or alters a shared wall, builds a new wall on or astride the boundary, or excavates close to and below a neighbour's foundations. The Act is separate from planning and building regulations, so having both does not remove the duty. We check the drawings against the Act before you commission anything.

  • Cutting into a party wall, for example to bear a steel beam (section 2)
  • Raising, thickening, underpinning or rebuilding a party wall (section 2)
  • Building a new wall at or astride the line of junction (section 1)
  • Excavating within 3 metres of a neighbouring structure and deeper than its foundations (section 6)
  • Excavating within 6 metres where the work meets a 45-degree line drawn down from the neighbour's foundations (section 6)

Which party wall notice is it, and how much notice is required?

The notice type follows the work. A line of junction notice (section 1) and an adjacent excavation notice (section 6) must be served at least one month before work starts. A party structure notice (section 3, for section 2 works) must be served at least two months before. Content matters, because each section sets out what the notice must contain.

Line of junction notice (section 1)

Used where you want to build a new wall on the boundary. If the neighbour consents by notice within 14 days, the wall is built half on each owner's land. If they do not, you may only build wholly on your own land and at your own expense. Section 1 also deals with footings that project below the neighbour's land.

Party structure notice (sections 2 and 3)

Used for work to an existing party wall, such as cutting in for a beam or raising it for a loft. The notice must give your name and address, the nature and particulars of the work and the start date. It ceases to have effect if the work has not begun within twelve months. The neighbour has one month to serve a counter notice asking for reasonable additional works (section 4).

Adjacent excavation notice (section 6)

Used for the 3 metre and 6 metre cases. It must say whether you propose to underpin or otherwise strengthen the neighbour's foundations, and it must come with plans and sections showing the site and depth of the excavation.

What happens if my neighbour does not agree?

If the neighbour does not consent in writing within 14 days of a party structure notice or an excavation notice, the Act treats them as having dissented and a dispute is deemed to have arisen (sections 5 and 6(7)). Section 10 then resolves it through surveyors and a written award. A dispute is routine and decides how the work is done.

Agreed surveyor or two surveyors

Both owners can concur in appointing one surveyor, or each can appoint their own and the two select a third (section 10). If a party refuses or neglects to appoint within ten days of a request, the other may appoint on their behalf. Only the appointed surveyors make the award. We supply the drawings and information they need to do so.

What the award can contain

The award can set the right to carry out the work, when and how it is done, and who pays the costs of the award. It is conclusive unless appealed to the county court within 14 days of service. Clear drawings and a schedule of condition give the surveyors less to query, which tends to keep the process short.

Who pays the neighbour's surveyor?

In practice the building owner usually pays the reasonable fees of the neighbour's surveyor as well as their own, because the work is for the building owner's benefit. The Act itself leaves this to the award: section 10(13) says reasonable costs are paid by whichever parties the surveyors making the award determine. Budget for it, and expect the award to say who bears what. Those fees are separate from ours.

What do party wall drawings and a schedule of condition include?

Party wall drawings are the plans and sections that go with a notice so the neighbour and any surveyor can see what you propose without guessing. Section 6 notices must be accompanied by plans and sections showing the site and depth of excavation. A schedule of condition records the state of the neighbour's property before work, so later damage can be compared. We produce both for most London homes.

  • Site plan showing the boundary, the neighbour's building and the 3 metre and 6 metre distances
  • Section through the party wall showing steel bearings, padstones and any raised wall
  • Foundation section showing depth against the neighbour's foundation level
  • Underpinning or retaining wall details where a basement or deep footing is proposed
  • Schedule of condition of the adjoining property, with dated photographs, before work starts

How does this work on a London terrace, side return or basement?

The three common London cases each trigger a different notice, and several projects need more than one. We map them from the drawings at the start so the notices go out in time to avoid a delayed start on site.

Terraced loft with steels

Steel beams bearing into the party wall need a party structure notice with two months' lead time. The section drawing is the key document, because it shows the bearing, the padstone and the load.

Side return on the boundary

A new flank wall on the boundary can need a line of junction notice. Foundations that go below the neighbour's footings can add an adjacent excavation notice, so one extension can need two.

Basement within 3 metres or 6 metres

Digging below the neighbour's foundation level within 3 metres, or across the 45-degree line within 6 metres, needs an excavation notice with plans and sections. Our basement conversion drawings and structural drawings are prepared with this in mind.

Party wall notice types for London home projects
NoticeWhen neededMinimum noticeOur fee
Line of junction (section 1)New wall on or astride the boundary1 monthFrom £45 per neighbour
Party structure (sections 2 and 3)Cutting into, raising, thickening or underpinning a shared wall2 monthsFrom £45 per neighbour
Adjacent excavation (section 6)Digging within 3m below, or within 6m across a 45-degree line from, a neighbour's foundations1 monthFrom £45 per neighbour
Party wall drawingsSections and plans served with the noticeNot applicableFrom £195
Schedule of conditionRecord of the neighbour's property before workBefore work startsFrom £245 per adjoining property
FAQ

Party Wall Notices & Drawings — frequently asked questions

How much does a party wall notice cost?+
We prepare and serve party wall notices from £45 per adjoining owner, draw the party wall sections from £195, and record a schedule of condition from £245 per adjoining property. Where a neighbour appoints their own surveyor, the building owner normally pays that surveyor's reasonable fees too, though the award decides.
Can I start work if my neighbour does not reply?+
Not safely. Silence for 14 days is treated by the Act as dissent and a dispute arises, so the section 10 process needs to run and an award be made before the work it covers begins.
Is a party wall notice the same as planning permission?+
No. Planning permission and building regulations are separate approvals. A party wall notice deals with your legal duties to your neighbour, and you may need all three.
Can a neighbour stop my extension through the Act?+
Not by dissenting alone. A dissent starts the surveyor process, which sets conditions on how the work is done. Building astride the boundary under section 1 does depend on the neighbour's consent, so ask us before relying on this.
Do I serve notice on every neighbour?+
Only on adjoining owners affected by the work. A terrace loft may involve one or two, and a basement may involve several. Freeholders and leaseholders can both count, so we confirm who the owners are before serving.
Do you appoint surveyors or make the award?+
No. Under section 10 only the appointed surveyors make the award. We prepare the notices, drawings and schedule of condition, and supply the information those surveyors ask for.