Listed Building Consent Drawings

Listed building consent drawings for a London house

If your London house is listed, almost any change that touches its character needs consent before the work starts, inside as well as out. We measure the building, record what is original, draw what you want to change and why it does no harm, and send the application to your council, for a fixed £1,895 with the survey visit included.

Fixed fee from £1,695 drawings + £200 survey (£1,895 total) · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

Why a listed house asks more of you than a normal one

Under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, nobody may demolish a listed building, or alter or extend it in a way that would affect its character as a building of special architectural or historic interest, unless the works are authorised. The test is character, not size. Taking out a chimney breast, moving a staircase, swapping timber sash windows for double glazed units or stripping lath-and-plaster ceilings can all qualify.

The listing also reaches further than most owners expect. Government guidance says that for every grade, unless the list entry says otherwise, the listing covers the entire building, internal and external, and can include objects fixed to it and buildings in its curtilage. A garden wall or outbuilding that has stood since before 1 July 1948 may be caught as well. The first job on any listed house is therefore to read the list entry and find out what it actually protects.

Listed Building Consent Drawings

from £1,895

£1,695 drawings + £200 survey (£1,895 total)

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • A measured survey of the whole listed building, internal and external
  • Existing plans, sections and elevations with historic fabric marked
  • Proposed drawings that show what is kept, altered and removed
  • A written schedule of works, one line per change
  • Application form, ownership certificate and the submission to your council as your agent
  • Replies to the conservation officer's questions on the drawings
How a listed building consent application runs
  1. Survey the fabric

    We measure every floor and record cornices, joinery, floors, staircases and structure that the officer will want to see kept.

  2. Agree the changes

    We tell you which of your ideas look easy, which look hard and which are unlikely to be accepted, before anything is drawn.

  3. Draw existing and proposed

    Plans, sections and elevations with a schedule of every alteration, written for a conservation officer to read.

  4. Submit to the council

    We apply as your agent. There is no fee to the council for the consent itself.

  5. Answer the officer

    Questions about materials, details or a gentler scheme come to us, and we revise the drawings.

Owners often ask which of the two they need. Often it is both. Internal works are not 'development', so a new bathroom layout or an opened-up kitchen wall needs no planning permission, but it still needs listed building consent. A rear extension needs both: planning permission, with the householder fee of £548 from 1 April 2026, and consent for the way it joins the historic wall.

The consent application itself is free. The same guidance states there is no fee for submitting an application for listed building consent. What you pay us for is the surveying and drawing, which is where applications for listed houses are won or lost. If your scheme also needs planning permission, we prepare both from the one survey and send them together.

Long terrace of brick cottages leading to a church tower
Edwardian gabled houses on a residential street with spring blossom

Listed building consent is normally granted on condition that the works begin within three years of the date of the grant, unless the council directs a different period.

Planning (Listed Buildings and Conservation Areas) Act 1990 s.18(1): listed building consent is subject to the condition that works begin not later than the expiration of (source wording: "three years"). www.legislation.gov.uk

What the conservation officer actually wants to see

A conservation officer is reading your drawings to answer one question: what happens to the old parts of this building? Plans that show only new walls and new openings cannot answer it. Ours show the existing building first, with original fabric, later alterations and modern additions told apart, and then the proposal drawn over it, so the officer can see each cut, each new opening and each thing kept.

The national policy test asks for an assessment of the significance of the asset affected, proportionate to the asset's importance and no more than is needed to understand the effect. For a small scheme in a modest Grade II house, the drawings and schedule often carry that load. For a larger change, the council will ask for a written heritage statement, which we can prepare from the same survey as a separate fixed-fee service.

The tests your application will be judged on

Councils decide these applications with the protection of the building at the front of their minds. The planning policy framework published in August 2026 tells decision-makers to give substantial weight to the conservation of a designated heritage asset, and more weight the more important the asset is. Any harm to the significance of a listed building is, in its words, a matter of considerable importance and weight.

It also sets out where the line sits. Substantial harm to a Grade II listed building should be exceptional; for Grade I and II* buildings it should be wholly exceptional. Less than substantial harm can still be weighed against public benefits, and the policy names securing the long-term reuse of a vacant listed building and fitting energy efficiency measures as examples. We tell you honestly where your idea sits on that scale, and where a gentler version of it would be approved with less argument.

DrawingsDirect sample planning sheet with existing and proposed plans and elevations at 1:100
Sample drawing

Listed building consent is normally granted on condition that the works begin within three years of the date of the grant, unless the council directs a different period. After that, the consent lapses and the application starts again, so line up your builder before you apply, not after.

Doing works without consent is a criminal offence under section 9 of the same Act. On conviction on indictment the maximum is two years in prison or a fine, or both. Expect a buyer's solicitor to ask for the consents on any listed house you sell. Our guide to listed building consent in London explains the process in more depth.

What we do, and what the fixed fee covers

We visit, measure the whole building and check the list entry and the constraint maps for your address. We then draw the application, apply as your agent and deal with the officer's questions on the drawings. A fixed £1,895 is the total you pay, with the measured survey included and no VAT charged. The council charges nothing for the consent.

Building regulations are separate. If the work involves new structure, insulation or a new bathroom, the same survey carries into our building regulations drawings. Send us the address and a line about the work, and we will reply with whether it needs consent, planning permission or both.

London high street lined with Victorian shopfront parades and flats above
Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
special architectural or historic interestPlanning (Listed Buildings and Conservation Areas) Act 1990 s.7: no person may execute works for the demolition of a listed building or for its alteration or extension in any manner which would affect its character, unless authorised (source wording: "special architectural or historic interest")www.legislation.gov.uk
internal and externalPlanning Practice Guidance, Historic environment, para 043: for all grades of listed building, unless the list entry indicates otherwise, the listing covers the entire building (source wording: "internal and external")www.gov.uk
1 July 1948Planning Practice Guidance, Historic environment, glossary: a listed building includes objects or structures within its curtilage that form part of the land and have done so since before 1 July 1948 (source wording: "since before 1 July 1948")www.gov.uk
£548Statutory fee from 1 April 2026: planning application for the enlargement, improvement or alteration of a single dwellinghouse (householder), Sch 1 Pt 2 category 6(1)assets.publishing.service.gov.uk
no feePlanning Practice Guidance, Historic environment, para 044: (source wording: "There is no fee for submitting an application for listed building consent")www.gov.uk
proportionateNPPF (August 2026) policy HE5(1): the level of detail of the assessment of significance should be proportionate (source wording: "proportionate to the assets’ importance")www.gov.uk
substantial weightNPPF (August 2026) policy HE6(1): (source wording: "substantial weight should be given to the asset’s conservation")www.gov.uk
wholly exceptionalNPPF (August 2026) policy HE6(6): substantial harm to or total loss of grade I and II* listed buildings should be (source wording: "wholly exceptional")www.gov.uk
three yearsPlanning (Listed Buildings and Conservation Areas) Act 1990 s.18(1): listed building consent is subject to the condition that works begin not later than the expiration of (source wording: "three years")www.legislation.gov.uk
two yearsPlanning (Listed Buildings and Conservation Areas) Act 1990 s.9(4)(b): on conviction on indictment, imprisonment for a term not exceeding (source wording: "two years")www.legislation.gov.uk
FAQ

Questions people ask

Do I need listed building consent to replace my windows?
If the new windows would affect the character of the building, yes. Like-for-like repair usually does not need consent, but replacing timber sashes with different materials or glazing bars usually does. Ask us before you order anything.
Is the inside of my house covered too?
Yes. Unless the list entry says otherwise, the listing covers the whole building, internal and external. Moving or removing internal walls, stairs, fireplaces and plasterwork can all need consent.
Does the council charge a fee for listed building consent?
No. Government guidance states there is no fee for an application for listed building consent. If the work also needs planning permission, that application carries the normal planning fee.
Is my house listed? How do I check?
Search the National Heritage List for England with your postcode, or ask your council. Being in a conservation area is a different protection and does not mean the building is listed.
How long does the consent last once granted?
Normally three years from the date of the grant, unless the council directs another period. The work must begin within that time.
Can you also write the heritage statement?
Yes. It is a separate service with its own fixed fee, prepared from the same survey, so you are not paying for the measuring twice.