How much does a building regulations drawings review cost in London?

A building regulations drawings review costs our fixed £300 in London, with no VAT charged. We check a set that someone else drew against the Approved Documents, tell you in plain English what is wrong or missing, mark it on your own drawings and give your builder a short list of actions, in 3 to 5 working days, before the set goes to building control or to site.

Get a fixed quote from £300

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

The short answer: one fixed fee for three documents

Our building regulations drawings review costs £300. The report lists every issue with what to do about it and the Part it relates to, your own drawings come back with each issue clouded and numbered, and a short builder action schedule turns the report into a table with a space to sign off each item as it is dealt with.

Each issue is ranked Critical, Recommended or Minor so you know what to deal with first. Critical means fix it before submission or before work starts, Recommended means resolve it before the building regulations submission, and Minor covers tidy-ups that will not hold anything up.

What a review gives you
  1. Read the sheets

    We read the building regulations set against the Parts of the Approved Documents that apply.

  2. Rank the issues

    Each issue is ranked Critical, Recommended or Minor, in plain English.

  3. Mark your drawings

    Your own sheets come back with each issue clouded and numbered.

  4. Hand over the list

    A builder action schedule lets each item be signed off as it is closed.

What a reviewer actually finds

Take stairs, the commonest loft problem. Approved Document K says the maximum pitch for a private stair is 42°, with a rise of between 150 and 220 mm and a going of between 220 and 300 mm (Approved Document K, Table 1.1). A stair squeezed onto a small landing can pass on a sketch and fail when drawn to scale.

Escape is the other. Schedule 1 of the Building Regulations requires that there are appropriate provisions for the early warning of fire, and appropriate means of escape in case of fire, and a loft priced without anyone asking how people get out is a Critical item. Structure is the third: a new opening needs the loads carried to the ground, which means calculations somebody has done.

Rear extension under construction with blockwork walls and a steel beam opening up the back of a house
A steel beam like this is only as safe as the calculation behind it, and a review checks that one exists.

Do the sheets agree with each other?

A building regulations set is usually drawn from the same base as the planning set, and planning drawings need an identified scale with the direction of north shown (Planning Practice Guidance). Building control reads the same sheets, so we check that plans, sections and elevations agree: the same dimensions on every sheet, a sensible scale and the extent of the work shown properly.

The review covers the Parts that apply, such as A structure, B fire, C moisture, F ventilation, K stairs, L energy and M access, and, for new homes, O overheating. Questions that are only about planning permission are a separate check and are not part of it.

When to get a building regulations review

The earlier the better, because a line on a drawing is cheaper to change than a built wall. Two moments suit: before the Full Plans application goes to building control, and before work starts on site, when a builder is about to price or order steel from the drawings.

A review is not a redraw. If the sheets are poor, we say so and quote a redraw separately, for example building regulations drawings or structural calculations. The service is on the building regulations drawings review page.

Sources

Every figure in this article, where it comes from and a link to the original.

  1. 42°: Approved Document K (2013 edition), Table 1.1 note 1: (source wording: "The maximum pitch for a private stair is 42°"). assets.publishing.service.gov.uk
  2. between 150 and 220 mm: Approved Document K, Table 1.1: private stair rise (source wording: minimum 150 mm, maximum 220 mm). assets.publishing.service.gov.uk
  3. between 220 and 300 mm: Approved Document K, Table 1.1: private stair going (source wording: minimum 220 mm, maximum 300 mm). assets.publishing.service.gov.uk
  4. appropriate provisions for the early warning of fire, and appropriate means of escape in case of fire: Building Regulations 2010 Sch 1 Part B1: (source wording: "appropriate provisions for the early warning of fire, and appropriate means of escape in case of fire"). www.legislation.gov.uk
  5. identified scale: PPG Making an application, para 023: (source wording: "Any plans or drawings must be drawn to an identified scale"). www.gov.uk
  6. direction of north: PPG Making an application, para 023: (source wording: "in the case of plans, must show the direction of north"). www.gov.uk

Questions people ask

Do you redraw anything?
Not unless you ask. A review reads your sheets and reports. A redraw is a separate quote.
Do I pay VAT on your fee?
No. The fee shown is the total you pay; no VAT is charged.
Do you certify the structure?
No. We flag where calculations are missing. We do not design or certify structure in a review.
Can I use it before applying?
Yes. Before the Full Plans application, or before work starts, is when errors cost least to fix.
Is it a guarantee building control will pass it?
No. It removes avoidable errors. Building control decides.

Photographs: Michael Dibb (CC BY-SA 2.0); Brett Jordan (Pexels License).

Building Regulations Drawings Review: a fixed fee from £300

Read more on the building regulations drawings review service page, or send your address below and we reply within one working day.

Building Regulations Drawings Review

from £300

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • A written report in plain English, with every issue ranked and a recommended fix
  • Your own drawings marked up, with each issue clouded and numbered
  • A builder action schedule with a sign-off box against each item
  • A Part-by-Part check of the Approved Documents that apply to your project
  • A report in 3 to 5 working days