MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex

Free 2026 London Planning Report — Independent Drawings & Specification Review in London

Proposed floor plan and section drawings with review notes marked up before a London building regulations submission
Independent Drawings & Specification Review

Independent Drawing Review in London | Fixed Fee

A chartered second pair of eyes on drawings someone else produced, before changes get expensive.

Get your fixed-fee quote

60 seconds now. A no-obligation fixed quote back within one working day — with a free planning appraisal.

No obligation · No spam · Reply within 1 working day
Open-plan London interior created by an approved independent drawings & specification review project
Isometric illustration of a London home extension design
Proposed floor plan
MCIAT chartered

Plenty of London projects start with drawings from a builder or a designer who is not a chartered professional. They are often fine for a quote and not much more. A planning application may go in with dimensions that do not agree, or a loft may be priced without anyone asking how people get out of it in a fire. By the time an officer or a building control surveyor raises the problem, the fix costs time and money.

DrawingsDirect is an MCIAT-chartered architectural technologist practice. Our independent drawing review reads the sheets you already have, tells you in plain English what is wrong or missing, shows you where on your own drawings, and gives your builder a short list of actions to close out. The fee is fixed at £300. We do not redraw anything unless you ask us to.

Fixed fees from £300 (see all prices) · Drawings in ~7 days · Free redraws to approval.

What do I get from an independent drawing review?

You get three documents. A written report in plain English lists every issue with what to do about it. Your own drawings come back marked up, with each issue clouded and numbered. A short builder action schedule turns the report into a table with a space to sign off every item as it is dealt with.

  • The report: each issue ranked by seriousness, explained without jargon, with a recommended fix.
  • The marked-up drawings: your actual sheets, clouded and numbered, so you can see where each issue sits.
  • The builder action schedule: a short table to hand to your builder, with a sign-off box against each item.

Each issue gets one of three ratings so you know what to deal with first. Critical means fix it before submission or before work starts, because it risks refusal, a safety problem or an expensive correction later. Recommended means resolve it before the building regulations submission. Minor covers tidy-ups and good practice that will not hold anything up.

These are the items that can stop a project. The kind of thing that sits here is a new top floor with no workable escape route, or structure that is needed but has not been designed. A Critical item should be closed before anything is submitted or ordered.

These need an answer before the building regulations submission but do not stop a planning application. A typical example is a roof build-up drawn without enough information to check the insulation or the ventilation.

These are small inconsistencies, missing labels and good-practice points. They are worth fixing because a tidy set of drawings draws fewer queries from the council and from contractors, but none of them should delay the job.

When is the right time to get drawings reviewed?

The earlier the better, because changing a line on a drawing is far cheaper than changing a built wall. There are three useful moments: before a planning submission, before the building regulations submission, and before work starts on site. The review fits any of them, and the report states which stage your sheets are at.

  • Before a planning submission, so that avoidable errors do not cost you a validation delay or a refusal.
  • Before the building regulations submission, so the technical gaps are closed while changes are still changes to a drawing.
  • Before work starts, when a builder is about to price, order steel or book trades from the drawings.

What we check: planning, building regulations, structure and fire

We read the drawings against four areas, each judged against the guidance that applies to your project. Where something turns on facts we cannot see from the sheets, such as ground conditions or the true height of an existing floor, the report says so rather than guessing.

Planning

Whether the drawings agree with each other and are clear enough for a council officer to assess: matching dimensions between plans, elevations and sections, a sensible scale, the extent of the proposal shown properly, and whether the scheme looks likely to fall within permitted development or needs a full application. Where a wall is shared with a neighbour, we also check that party wall drawings exist, and our party wall service can take it from there.

Building regulations

Stairs are a good example. Approved Document K sets limits on rise and going and a maximum pitch of 42 degrees for a private stair, which is often where a loft stair squeezed into a small landing starts to fail. Insulation is another. Approved Document L Volume 1 sets maximum U-values for new walls, roofs and floors in an existing dwelling, so the drawings should state the build-up and not leave it to site. We check against the edition that applies to your project. A revised Approved Document L is due to take effect in 2027, so the timing of your application matters.

Structure

Whether the structure the drawings rely on has been designed. A new opening in a loadbearing wall, a new loft floor or an altered roof should come with calculations and details from a structural engineer, and we flag where none exist. We do not design or certify structure in a review. If it is missing, our structural drawings service can pick it up.

Fire

A loft conversion is the classic case. Under Approved Document B Volume 1, where a conversion creates a storey more than 4.5 m above ground level, the escape route has to be addressed. That usually means fire-resisting doors and partitions along it, or an alternative based on sprinklers. Whether it applies to your house depends on its height and layout, so we check the sections for the actual floor level before saying either way.

Is a review the same as redrawing my plans?

No. A review leaves your drawings as they are and reports on them. A redraw produces a new set, which costs more and takes longer. Many clients only need the review, then pass the action schedule to whoever drew the plans. If a lot is wrong, you can ask us to quote for a redraw afterwards.

An example of what a review picks up

A flat roof is a common one. A cold deck and a warm deck deal with moisture in different ways, so the drawn build-up needs ventilation or insulation details that match whichever one is chosen. A section that shows only a line and a label leaves that decision to site, and we would flag it.

How long does a review take?

Allow 3 to 5 working days from the day we have your drawings and any specification you hold. A 48-hour express option is available if the clock is already running, for example before a builder starts. Ask for the express option when you request the review. Large or incomplete sets can take a little longer, and we tell you at the start.

Independent review, a full redraw and going ahead unchecked
Independent reviewRedraw the whole setGo ahead unchecked
Cost£300 fixed, including VATSee /pricingNothing up front, but any errors are paid for later
Time3 to 5 working days, express available on requestSee /pricingNone to start, though corrections can delay the job
What you getRanked report, marked-up sheets and a builder action scheduleA new set of drawingsThe drawings as they are, with unknown gaps
Best whenDrawings exist and you want them checked before you commitThe existing set is not worth keepingNot advisable before a submission or before work starts
FAQ

Independent Drawings & Specification Review — frequently asked questions

How much does an independent drawing review cost?+
The review is a fixed fee of £300, including VAT, agreed before we start. That covers the written report, the marked-up drawings and the builder action schedule. A 48-hour express option is available, so ask for the express option when you enquire.
Can you review drawings that a builder produced?+
Yes, and it is a common request. We review planning or building regulations drawings from builders, designers and other drafters, and our report is about the drawings, not the person who drew them.
Do you check structural calculations?+
We check whether structural design exists where the drawings need it, for example for a new roof or new openings, and flag where it is missing. We do not check an engineer's calculations in this service.
What if the review finds a Critical issue?+
The report says what to do, and the action schedule gives your builder the item to close out. If the fix means changing the drawings, we can quote for that separately, or the original drafter can amend them.
Does the review replace building control approval?+
No. It is an independent check, not an approval. Building control still decides whether a scheme complies with the building regulations, and the council still decides a planning application.
What do you need from me to start?+
Send the drawings you have, as PDFs if possible, with any specification, structural details or notices already issued. Tell us which stage you are at, planning, building regulations or pre-start, and who your builder is.
Free Fixed Quote

Ready for independent drawings & specification review that get approved?

Tell us your London address and project. We'll confirm feasibility and a fixed fee within one working day — with a free planning appraisal of your property's potential.