MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex

Free 2026 London Planning Report — What does a prior approval extension cost in London?

Single-storey rear extension under construction behind a London semi, with blockwork walls and a steel beam across the opening

Prior Approval Extension DrawingsFrom £595

What does a prior approval extension cost in London?

Getting a larger rear extension through prior approval in London costs two fixed amounts: the council's £249 fee and our £595 for the measured survey, the notification drawings and the submission. Nothing else is needed for the planning side, and both figures are known before you start.

Get a fixed quote from £595

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

The short answer: two fees, both fixed

The first fee goes to your council. Since 1 April 2026 a prior approval notification for a larger home extension costs £249, set nationally in the planning fee schedule, so it is the same in Hackney as in Hillingdon. You pay it with the submission.

The second fee is ours: £595 for the whole notification. That buys a measured survey visit, the site plan, the existing and proposed ground floor plan and rear elevation, the written description of depth and heights, the list of adjoining addresses and the submission itself, with our replies to any council question during the 42 days.

What the planning side of a prior approval extension costs
Our notification drawings
£395
Our measured survey visit
£200
Council fee (paid to the council)
£249
Total
£844

What our fee covers, and what it does not

The survey comes first because the whole notification rests on two measurements: how far the extension runs past the original back wall, and how high it is at the eaves and at its highest point. We measure the house, the garden and the neighbouring walls, and confirm on the day whether the depth you want fits under the 6 metre limit for a terrace or semi, or 8 metres for a detached house.

The fee does not cover anything after the planning decision. It does not include building regulations drawings, a structural engineer's calculations for the beam over the opening, party wall notices or the build. Those are priced separately below, because a buyer comparing quotes should see each line, not one round number that hides them.

Open-plan kitchen extension part way through fit-out, plastered walls and a bare screed floor, the stage after prior approval
The planning fee is a small part of an extension budget; the build and building regulations come after it.

How it compares with a householder planning application

The same extension through a householder planning application carries a £548 council fee instead of £249, and the council judges the design, scale and materials against its local plan rather than only the effect on the neighbours. For a straightforward single-storey extension that fits the limits, prior approval is the cheaper and narrower test.

Time is the other difference. A prior approval notification has a fixed 42-day clock in the order itself, and if the council has not written to you by day 42 the work may begin. Our fee for the notification is also lower than our fee for rear extension planning drawings, which start at £695, because there is no design statement to write.

When the cheaper route is closed

The larger depths do not apply on article 2(3) land, which includes every conservation area, so a large number of Victorian and Edwardian streets in inner London cannot use them. An Article 4 direction, or a planning condition from an earlier consent, can also take away the house's permitted development rights. Flats and maisonettes are outside the scheme entirely. Our guide to the larger home extension scheme sets out every limit.

In those cases a deeper extension needs a householder planning application, with its £548 fee. We check the constraints for your address on the survey day, so you are not paying for a notification the council would have to turn away. Where the house is not sure to qualify, a Lawful Development Certificate for a standard 3 metre extension can be the alternative.

The costs that come after prior approval

Every extension needs building regulations approval, whichever planning route it took. Our building regulations drawings start at £745, and structural calculations for the new beam start at £395. Building control charges its own fee on top, and that varies by council or approved inspector.

If the extension is built on the line of the boundary or digs near a neighbour's foundations, the Party Wall etc. Act 1996 applies. A party wall notice from us starts at £45 per adjoining owner; a surveyor's award, if a neighbour dissents, is a separate cost again.

What London councils decided over two years

MHCLG's quarterly planning statistics show how the 33 London boroughs dealt with these notifications in the two years to June 2026. In 6,128 cases the council wrote back that prior approval was not required, which means no neighbour raised anything that needed a decision. Where a decision was needed, councils granted 1,176 and refused 2,276.

A refusal under this route is about one neighbour's light or outlook, so the fix is usually a shallower depth or a lower wall on one side, and a fresh notification costs the same £249 again. That is the case for clear drawings: a council can only weigh what it can read, and a set that shows the boundary heights plainly gives it the least to worry about.

Aerial view over a row of London terraces and their long back gardens, where rear extensions meet the neighbours' boundaries
Prior approval turns on the boundaries: the council weighs the effect on each adjoining home.

Sources

Every figure in this article, where it comes from and a link to the original.

  1. £249: Statutory fee from 1 April 2026: prior approval for a householder larger rear extension (GPDO Part 1 Class A). assets.publishing.service.gov.uk
  2. £548: Statutory householder planning application fee, single dwellinghouse, from 1 April 2026. assets.publishing.service.gov.uk
  3. 6 metres: GPDO 2015 Sch 2 Pt 1 Class A.1(g): larger single-storey rear extension, maximum depth beyond the rear wall for a house other than detached, subject to prior approval under A.4 (source wording: "6 metres"). www.legislation.gov.uk
  4. 8 metres: GPDO 2015 Sch 2 Pt 1 Class A.1(g): larger single-storey rear extension, maximum depth beyond the rear wall for a detached house (source wording: "8 metres"). www.legislation.gov.uk
  5. 4 metres: GPDO 2015 Sch 2 Pt 1 Class A.1(f)-(g): a single-storey rear extension may not exceed 4 metres in height (source wording: "exceed 4 metres in height"). www.legislation.gov.uk
  6. 42 days: GPDO 2015 Sch 2 Pt 1 Class A.4(10)(c): work may start if the council has not notified a decision within 42 days of receiving the information (source wording: "the expiry of 42 days"). www.legislation.gov.uk
  7. 6,128: Our analysis of MHCLG planning application statistics, table PS1 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2). www.gov.uk
  8. 2,276: Our analysis of MHCLG planning application statistics, table PS1 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2). www.gov.uk
  9. 21 days: GPDO 2015 Sch 2 Pt 1 Class A.4(5): the council notifies adjoining owners or occupiers, who get a period of not less than 21 days to make representations (source wording: "not less than 21 days"). www.legislation.gov.uk
  10. 1,176: Our analysis of MHCLG planning application statistics, table PS1 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2). www.gov.uk

Questions people ask

Do my neighbours get a say?
Yes. The council writes to the adjoining owners and occupiers and gives them at least 21 days to comment. It must then consider the effect on every adjoining home, not only the ones that wrote in.
Do I pay VAT on your fee?
No. Our fee is the full fixed amount you pay; no VAT is charged. The council fee is paid to the council separately.
What happens if the council refuses?
We look at what the refusal says about the neighbour's home, usually depth or height on one side, and redraw. A new notification needs a new council fee.
Can I build while the council is deciding?
No. Work must not start until the council has written to you, or until 42 days have passed from it receiving the complete notification with no decision.

Photographs: Brett Jordan (Pexels License); Brett Jordan (Pexels License); Altaf Shah (Pexels License).

Prior Approval Extension Drawings: a fixed fee from £595

Read more on the prior approval extension drawings service page, or send your address below and we reply within one working day.

Prior Approval Extension Drawings

from £595

£395 drawings + £200 survey (£595 total)

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • Measured survey visit and an on-the-day check that the house qualifies
  • Site plan, existing and proposed ground floor plan and rear elevation
  • Written description of depth, maximum height and eaves height
  • List of adjoining addresses for the council's neighbour notice
  • Submission as your agent and replies to council questions

Get your fixed-fee quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day