MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex

Free 2026 London Planning Report — How much does retrospective planning permission cost in London?

Finished render-clad rear extension with French doors and a small first-floor addition on the back of a London semi

Retrospective Planning ApplicationsFrom £695

How much does retrospective planning permission cost in London?

A retrospective planning application for work already built in London costs our fixed £695, with the measured survey visit included, and the council's fee on top, which is £548 for a householder application. What the fee does not buy is certainty: the guidance says it cannot be assumed that permission will be granted, so we look at the work before you pay anything to the council.

Get a fixed quote from £695

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

The short answer: two costs, and a risk the fee does not remove

Our fee for a retrospective application is £695. For that we measure what has been built, draw it as it stands, draw any changes the council may need to see, write up why the work is acceptable and submit the application. The survey comes first because a retrospective drawing has to show the building as it is, not as it was meant to be.

The council's fee for a householder application is £548. It is paid to the council when we submit, and we pass the receipt to you without adding to it.

What a retrospective householder application costs
Our application drawings
£495
Our measured survey visit
£200
Council householder fee
£548
Total
£1,243

What the law lets the council do

Section 73A of the Town and Country Planning Act 1990 says that on an application the permission which may be granted includes planning permission for development carried out before the date of the application. That covers work done without permission, work done in breach of a time-limited permission, and work that ignored a condition.

The council decides it on the same planning merits as if the work were still on paper. Government guidance adds a warning to anyone tempted to treat a retrospective application as a formality: it cannot be assumed that permission will be granted, even where the council has invited the application.

Red-brick terrace with white-painted gables and finials, where a rear addition is judged for its effect on the neighbouring houses
The council judges built work the same way as proposed work: by its effect on the neighbours and the street.

The point people miss: you get one go

The guidance says a person who has carried out unauthorised work has only one opportunity to obtain planning permission after the event. If the council refuses, you cannot simply try again until it agrees.

That is the reason we look at the work before you apply. If the extension is too deep, too tall or too close to a boundary, we say so, and explain whether a revised version could be built or an appeal is worth considering. A weak application sent in a hurry spends your one go.

How long the council has to act

A council cannot enforce against old work for ever. For operational development, such as an extension, substantially completed on or after 25 April 2024 the council can act within 10 years of substantial completion; before that date the period is 4 years. A change of use falls under a separate 10-year period.

If the work is already old enough to be immune, a Lawful Development Certificate is the better route, because it records that no enforcement can be taken. Our post on what a certificate costs sets out the evidence it needs. We check the dates first, so you do not pay for the wrong application.

If the council refuses

A refused householder application can be appealed within 12 weeks of the date on the decision letter. Appeals are a separate fixed fee from us, and the post on what a householder appeal costs explains the process.

Some work also needs building regulations to catch up. If the build was never inspected, a regularisation application to building control is the route, and it is often needed alongside planning. See our retrospective planning application page for how the two fit together.

Sources

Every figure in this article, where it comes from and a link to the original.

  1. includes planning permission for development carried out before the date of the application: TCPA 1990 s73A(1): (source wording: "the planning permission which may be granted includes planning permission for development carried out before the date of the application"). www.legislation.gov.uk
  2. it cannot be assumed that permission will be granted: PPG Enforcement and post-permission matters, para 012: (source wording: "it cannot be assumed that permission will be granted"). www.gov.uk
  3. has only one opportunity to obtain planning permission after the event: PPG Enforcement and post-permission matters, para 013: (source wording: "has only one opportunity to obtain planning permission after the event"). www.gov.uk
  4. within 10 years of substantial completion: PPG Enforcement and post-permission matters, para 004: operational development substantially completed on or after 25 April 2024 (source wording: "within 10 years of substantial completion"). www.gov.uk
  5. 4 years: PPG Enforcement and post-permission matters, para 004: operational development substantially completed before 25 April 2024 (source wording: "within 4 years of substantial completion"). www.gov.uk
  6. 12 weeks of the date on the decision letter: GOV.UK Appeal a householder planning decision (source wording: "you can appeal for up to 12 weeks from the date on the decision letter"). www.gov.uk
  7. £548: Statutory householder planning application fee, single dwellinghouse, from 1 April 2026. assets.publishing.service.gov.uk

Questions people ask

Is the council fee included in your price?
No. The £548 householder fee is paid to the council when we submit.
Do I pay VAT on your fee?
No. The fee shown is the total you pay; no VAT is charged.
Will you tell me if I should not apply?
Yes. If the work is unlikely to be acceptable, or a different route fits better, we say so before you pay the council.
Can I be fined for building without permission?
The council can take enforcement action while the time limits below are still running. We explain which limit applies to your work before you apply.
Does it affect selling my house?
A buyer's solicitor will ask for evidence the work was lawful. Permission, or a certificate if the work is old enough, gives them that.

Photographs: Brett Jordan (Unsplash License); T (Unsplash License).

Retrospective Planning Applications: a fixed fee from £695

Read more on the retrospective planning applications service page, or send your address below and we reply within one working day.

Retrospective Planning Applications

from £695

£495 drawings + £200 survey (£695 total)

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • Measured survey of what has been built, included
  • Drawings of the work as it stands, and any changes needed
  • A written case for why the work is acceptable
  • An honest view of the risk before you pay the council
  • Submission to the council as your agent

Get your fixed-fee quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day