MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex

Free 2026 London Planning Report — HMO licence plans for Redbridge landlords, with fire exits and alarms marked

A street of Edwardian gabled houses with blossom in front, the kind of family home in Ilford and Wanstead let to groups of tenants
HMO Licence Plans in Redbridge

HMO licence plans for Redbridge landlords, with fire exits and alarms marked

Redbridge licenses every HMO of three or more people, not only the five-person houses, and its application asks for floor plans showing fire exits, hard-wired smoke alarms and heat detectors. We draw those plans and a room schedule for a fixed £495, so the pack matches what the council lists.

Fixed fee from £495 · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

Two licences, one borough

The council's HMO licensing page describes two licences. A mandatory licence applies to privately rented properties occupied by five or more people making up two or more households. An additional licence applies to those occupied by three or four people in two or more households.

The additional scheme was approved on 30 May 2023, came into force on Monday 18 September 2023 and ceases to have effect on 17 September 2028 unless the council revokes it earlier. So a four-person shared house in Ilford or Barkingside is inside the scheme, and the clock on its renewal is already running.

HMO Licence Plans in Redbridge

from £495

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • Scaled plans of every floor with rooms labelled by use
  • Fire exits and escape routes marked on each plan
  • Positions for smoke alarms and heat detectors, drawn from your fire risk assessment
  • A schedule of bedroom areas against the national minimum sizes
  • A PDF pack for the council's online application
  • A short note of rooms close to a minimum
From your address to the council's list
  1. Count households

    The Redbridge fee depends on how many households live in the property.

  2. Measure the house

    A measured survey gives room areas and escape distances.

  3. Draw the fire layout

    Fire exits, alarms and detectors shown on every floor.

  4. Schedule the rooms

    Each bedroom area set against its minimum.

  5. Apply with the other documents

    Plans go in with the gas, electrical and fire certificates.

What the council wants on the plan

Among the documents the page lists is floor plans showing fire exits, hard-wired smoke alarms and heat detectors, and it says the plan does not need to be professionally drawn. That is honest advice and we will not pretend otherwise: a landlord can mark up a plan.

Where a drawn plan earns its fee is accuracy. A plan with the exits and detectors in the wrong places, or room sizes taken from a brochure, sits badly next to a fire risk assessment and an inspector's measurements. Ours is drawn from a measured survey and marked from your assessment.

Suburban high street around a war memorial and a mature tree
Long terrace of dark red brick houses with flat-roofed bay windows and roof dormers, climbing a hill, with a white van parked in front

The national conditions say a bedroom for one person over 10 must be at least 6.51 square metres, and a room below 4.64 square metres cannot be used for sleeping.

Licensing and Management of HMOs (Mandatory Conditions of Licences) (England) Regulations 2018, new Sch 4 para 1A(2)(a): one person aged over 10 years (source wording: "not less than 6.51 square metres"). www.legislation.gov.uk

The fee goes up with households

For applications submitted from 1 April 2026 to 31 March 2027, the council's fee is a first-stage payment of £696.14 plus a second stage that rises with the number of households. The totals run from £1,865.34 for two households to £2,728.51 for ten or more. A £35 discount applies to the second part if you show proof of accreditation, and a paper application costs an extra £139.23.

Because the first stage is paid when you submit, it is worth having the plans and certificates complete before you press the button. The council's fee is separate and is paid to the council.

Room sizes behind the schedule

The national conditions say a bedroom for one person over 10 must be at least 6.51 square metres, and a room below 4.64 square metres cannot be used for sleeping. Our schedule lists the measured area of every bedroom next to the number of people it is intended for.

The council's page also warns that you cannot evict anyone without a licence and tenants can reclaim up to 12 months' rent. That is a reason to treat the paperwork as part of the tenancy, not an afterthought.

DrawingsDirect sample planning sheet with existing and proposed plans and elevations at 1:100
Sample drawing
Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
additional licence for 3 or 4 peopleRedbridge Council, HMO licensing: mandatory licence for 5 or more people in 2 or more households; additional licence for 3 or 4 people in 2 or more householdswww.redbridge.gov.uk
18 September 2023 to 17 September 2028Redbridge Council news, 18 Sept 2023: additional scheme approved 30 May 2023, in force Monday 18 September 2023 and ceases to have effect on 17 September 2028 unless revokedwww.redbridge.gov.uk
floor plans showing fire exits and alarmsRedbridge Council, HMO licensing, what you need: floor plans showing fire exits, hard-wired smoke alarms and heat detectors; it does not need to be done by an architect or surveyorwww.redbridge.gov.uk
£1865.34Redbridge Council, HMO licensing fees for applications 1 April 2026 to 31 March 2027: 2 households total £1,865.34 (first stage £696.14)www.redbridge.gov.uk
£2728.51Redbridge Council, HMO licensing fees 2026/27: 10 or more households total £2,728.51www.redbridge.gov.uk
£35 discount; £139.23 paperRedbridge Council, HMO licensing: £35 discount on the second part with proof of accreditation; extra £139.23 for a paper applicationwww.redbridge.gov.uk
up to 12 months rentRedbridge Council, HMO licensing: you will not be able to evict anyone without a licence; tenants can reclaim from you up to 12 months' rentwww.redbridge.gov.uk
6.51 square metresLicensing and Management of HMOs (Mandatory Conditions of Licences) (England) Regulations 2018, new Sch 4 para 1A(2)(a): one person aged over 10 years (source wording: "not less than 6.51 square metres")www.legislation.gov.uk
4.64 square metresSame regulations, para 1A(2)(d): a room under this size may not be used for sleeping (source wording: "less than 4.64 square metres")www.legislation.gov.uk
FAQ

Questions people ask

Does a shared house of three people in Redbridge need a licence?
The council says an additional licence applies to privately rented properties occupied by 3 or 4 people forming two or more households.
Do I need a professional to draw the floor plan?
The council says it does not need to be professionally drawn. A measured plan with the exits and alarms marked correctly is what matters, and that is what we supply.
What does the council charge?
For 2026/27 applications it lists £1,865.34 to £2,728.51 depending on households, in two parts. Check its page for current figures.
Is the council's fee in your price?
No. Our fixed fee covers the plans and schedule only.