MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex

Free 2026 London Planning Report — HMO licence plans for Newham landlords, ready before you pay the council

A flat-fronted stock brick terrace with brightly coloured front doors, typical of the rented family houses found across East London
HMO Licence Plans in Newham

HMO licence plans for Newham landlords, ready before you pay the council

In Newham the question is rarely whether a rented house needs a licence. It is which of three. Selective licensing covers rented homes across almost the whole borough, an additional licence picks up smaller shared houses, and a mandatory licence applies from five people. We draw the scaled plans and room schedule for the HMO ones, for a fixed £495.

Fixed fee from £495 · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

Three licences, one borough

Newham's selective licensing scheme was launched on 1 June 2023 and covers every ward except Royal Victoria and Stratford Olympic Park. That is why a Newham landlord with a two-person flat in Plaistow or a family house in Manor Park still needs a licence.

Where the property is an HMO, a different licence applies instead. Shared houses of three or four people fall under the additional licence, and five or more people under the national mandatory one. The plans we draw are for those HMO cases, because a licence for a house let to several households is judged on its layout, and the council wants to see that layout drawn accurately.

HMO Licence Plans in Newham

from £495

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • Scaled plans of every floor with each room labelled by use
  • A schedule of bedroom areas against the national minimum room sizes
  • Kitchens, bathrooms and WCs counted against the number of tenants
  • A check of the house against the licence type it will need
  • A PDF pack for the document upload step of the online application
  • A short note of anything the council may query
Plans first, council fee second
  1. Work out which licence

    Selective, additional or mandatory depends on how many people and households live there.

  2. Measure the house

    A measured survey gives room areas you can stand behind.

  3. Draw and schedule

    Scaled floors plus a table of every bedroom area.

  4. Fix any shortfall

    A room under its minimum is raised before any council fee is paid.

  5. Apply online

    Upload the pack with your Part A payment on the council's form.

What the council charges, and why plans come first

Newham's fees page lists a selective licence at £750, an additional licence at £1,250 and a mandatory licence from £1,400 for up to five lettings. Each is paid in two parts. Part A is paid when you apply and covers processing.

The detail that matters for planning your work is on the same page: the application fee is non-refundable regardless of whether the application is successful. An application with a bedroom under its minimum is an application that may fail, so it is cheaper to find out on paper first. The council's fees are separate and are paid to the council.

Terraced houses on Boxley Street in Silvertown, brick and painted white, with tiled roofs and a tall tower block beyond
Long terrace of dark red brick houses with flat-roofed bay windows and roof dormers, climbing a hill, with a white van parked in front

The council lists a £100 administration cost on top of the licence fee for a paper application.

Newham Council, Licence fees and charges: paper application administration cost (application fee also required). www.newham.gov.uk

The discount that depends on a certificate

The fees page says an accredited landlord whose property has an EPC rating of A+, A, B or C can bring a selective licence down to £650, and the certificate has to be uploaded when the application is submitted. Discounts cannot be considered once the application is submitted and paid.

That rule is a good reason to gather everything in one sitting: the EPC, proof of accreditation and the plans. Our pack is designed to sit in that same upload step so nothing is added late.

Room sizes still decide HMO cases

For the HMO licences, the plan has to answer a simple question: is every bedroom big enough? The national conditions say a room for one person over 10 must be at least 6.51 square metres and for two people over 10 at least 10.22 square metres. A room below 4.64 square metres cannot be used for sleeping.

Our schedule lists every bedroom with its measured area and the people it is intended for. A box room over a stair can look like a bedroom and measure like a store, and it is better to learn that before you apply.

DrawingsDirect sample planning sheet with existing and proposed plans and elevations at 1:100
Sample drawing

A paper application costs extra

The council lists a £100 administration cost on top of the licence fee for a paper application. For most landlords the online route is the sensible one, and the PDF pack we issue is built to be uploaded rather than posted.

If you hold several houses, the page also lists a multi-dwelling selective arrangement for several dwellings in one building. Tell us how many properties you have and we will quote the plans together.

Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
launched 1 June 2023; all wards except Royal Victoria and Stratford Olympic ParkNewham Council, Selective licensing: launched on 1 June 2023 and covers all wards except Royal Victoria and Stratford Olympic Parkwww.newham.gov.uk
£750Newham Council, Licence fees and charges: selective licence Part A £400 + Part B £350 for up to five yearswww.newham.gov.uk
£1250Newham Council, Licence fees and charges: additional (HMO) licence Part A £400 + Part B £850 for up to five yearswww.newham.gov.uk
from £1400Newham Council, Licence fees and charges: mandatory HMO licence totals start at £1,400 for up to 5 lettings (Part A £450)www.newham.gov.uk
non-refundableNewham Council, Licence fees and charges: (source wording: "The application fee is non-refundable, regardless of whether the application is successful.")www.newham.gov.uk
£650Newham Council, Licence fees and charges: accredited landlord with an EPC of A+, A, B or C can reduce a selective licence to £650; the EPC must be uploaded with the applicationwww.newham.gov.uk
£100Newham Council, Licence fees and charges: paper application administration cost (application fee also required)www.newham.gov.uk
6.51 square metresLicensing and Management of HMOs (Mandatory Conditions of Licences) (England) Regulations 2018, new Sch 4 para 1A(2)(a): one person aged over 10 years (source wording: "not less than 6.51 square metres")www.legislation.gov.uk
10.22 square metresSame regulations, para 1A(2)(b): two persons aged over 10 years (source wording: "not less than 10.22 square metres")www.legislation.gov.uk
4.64 square metresSame regulations, para 1A(2)(d): a room under this size may not be used for sleeping (source wording: "less than 4.64 square metres")www.legislation.gov.uk
FAQ

Questions people ask

Does my rented house in Newham need a licence even if it is not an HMO?
Probably. The council's selective licensing scheme covers all wards except Royal Victoria and Stratford Olympic Park. Check your ward on the council's page.
Can I get my Part A fee back if the application fails?
No. The council states the application fee is non-refundable regardless of whether the application is successful.
Do you submit the application for me?
No. We supply the plans and schedule, and you or your agent make the application on the council's form.
Are the council's fees in your price?
No. Our fixed fee is for the plans and schedule. The council's licence fee is paid to the council.

Photographs: Chris Whippet (CC BY-SA 2.0); Tim Green from Bradford (CC BY 2.0).