MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex

Free 2026 London Planning Report — HMO licence plans for Hackney landlords, ready for the new schemes

A London roofscape of dormers and chimney stacks over converted Victorian houses, the type of building let to several tenants in Hackney
HMO Licence Plans in Hackney

HMO licence plans for Hackney landlords, ready for the new schemes

Hackney's new licensing schemes came into force on 1 May 2026, and the council's application page tells landlords to send floor plans of the entire property if they want to avoid processing delays. We draw scaled plans and a room-by-room schedule for the HMO licences, for a fixed £495.

Fixed fee from £495 · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

What Hackney now licenses

The council's announcement of 26 November 2025 says every HMO in Hackney made up of three or more people from two or more households needs a licence. That goes beyond the national rule, which starts at five people. It also says a selective licensing scheme covers almost all private rented homes in 17 of the 21 wards, about 76% of the borough's privately rented homes, and that the remaining four wards are covered by additional licensing.

For a landlord letting a three-bed house in Hackney room by room, the practical result is a licence whichever ward it sits in. What changes is the fee and the checks, and for an HMO those checks start with the layout.

HMO Licence Plans in Hackney

from £495

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • Scaled plans of the entire property, every floor
  • A schedule of every bedroom's area against the national minimum sizes
  • Shared kitchens, bathrooms and WCs counted against tenant numbers
  • Escape routes, stairs and doors drawn clearly
  • A PDF pack to upload with the online application
  • A short note of rooms close to a minimum
From the council's checklist to a complete application
  1. Find your licence type

    Three or more sharers in two or more households needs an HMO licence.

  2. Measure the property

    A measured survey gives room areas you can defend.

  3. Draw the entire property

    Every floor, as the council's application page asks.

  4. Schedule the rooms

    Each bedroom area set against its minimum.

  5. Apply online

    Upload the plans with Part A and the safety certificates.

Floor plans are on the council's list

The council's apply for a property licence page splits what you need into what it must have and what helps. Under the helpful list it names floor plans of the entire property, electrical and fire safety reports, the tenancy agreement and your accreditation certificate, and it says these help avoid delays.

That wording is worth reading closely. The page lists plans as help, not as a required document, but a licence application with a layout the officer can check is one that does not stall while they ask for it. A drawn plan with a room schedule answers the first questions before they are asked.

Victorian terrace on Southborough Road in Hackney with white window surrounds and tall chimney stacks, bare street trees and a white van
Long terrace of dark red brick houses with flat-roofed bay windows and roof dormers, climbing a hill, with a white van parked in front

Whatever the local scheme, the national conditions say a bedroom for one person over 10 must be at least 6.51 square metres and a room below 4.64 square metres cannot be used for sleeping.

Licensing and Management of HMOs (Mandatory Conditions of Licences) (England) Regulations 2018, new Sch 4 para 1A(2)(a): one person aged over 10 years (source wording: "not less than 6.51 square metres"). www.legislation.gov.uk

The fees, and the discounts that depend on certificates

Hackney lists a selective licence at £925 in total and an additional or mandatory HMO licence at £1,400, paid in two parts: Part A of £840 when you apply and Part B of £560 once the application is assessed and approved. If the application is rejected or withdrawn, Part A is not refunded.

The page lists £100 off Part B for an energy performance certificate of B or above, £50 off for a C, £100 off Part B for an accredited landlord, and £100 off Part A for multi-dwelling properties. These discounts depend on documents, so gather the EPC and accreditation certificate at the same time as the plans. The council's fees are paid to the council and are separate from ours.

Room sizes still decide the layout

Whatever the local scheme, the national conditions say a bedroom for one person over 10 must be at least 6.51 square metres and a room below 4.64 square metres cannot be used for sleeping.

Our schedule gives the measured area of each bedroom and what it is intended for, so a shortfall is found before the licence application, not at the inspection.

DrawingsDirect sample planning sheet with existing and proposed plans and elevations at 1:100
Sample drawing
Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
three or more people from two or more householdsHackney Council news, 26 Nov 2025: all HMOs of three or more people from two or more households will need a licencenews.hackney.gov.uk
17 of 21 wards, 76% of private rented homesHackney Council news, 26 Nov 2025: selective licensing covers almost all private rented homes in 17 of the 21 wards (76% of privately rented homes); the remaining four wards are covered by additional licensingnews.hackney.gov.uk
floor plans of the entire propertyHackney Council, Apply for a property licence: documents that help avoid delays include floor plans of the entire propertywww.hackney.gov.uk
£925 and £1400Hackney Council, Apply for a property licence: selective £925 (Part A £555, Part B £370); additional HMO and mandatory HMO £1,400 (Part A £840, Part B £560)www.hackney.gov.uk
Part A not refundedHackney Council, Apply for a property licence: if we reject your application or you withdraw it, we will not refund this first payment (Part A)www.hackney.gov.uk
£100 off Part B for EPC B or aboveHackney Council, Apply for a property licence: EPC B or above £100 off Part B; EPC C £50 off Part B; accredited landlord £100 off Part B; multi-dwelling £100 off Part Awww.hackney.gov.uk
from 1 May 2026Hackney Council, Apply for a property licence: we will start processing selective and additional HMO applications from 1 May 2026www.hackney.gov.uk
6.51 square metresLicensing and Management of HMOs (Mandatory Conditions of Licences) (England) Regulations 2018, new Sch 4 para 1A(2)(a): one person aged over 10 years (source wording: "not less than 6.51 square metres")www.legislation.gov.uk
4.64 square metresSame regulations, para 1A(2)(d): a room under this size may not be used for sleeping (source wording: "less than 4.64 square metres")www.legislation.gov.uk
FAQ

Questions people ask

Does a three-person house share in Hackney need a licence?
The council says all HMOs of three or more people from two or more households need a licence under the new scheme. Check its page for your circumstances.
What does an HMO licence cost in Hackney?
The council lists £1,400 for an additional or mandatory HMO licence, split £840 and £560, with discounts for EPC, accreditation and multi-dwelling properties. Check its page for current figures.
Does the council require floor plans?
Its application page lists floor plans of the entire property among the documents that help avoid delays.
Is the council fee included in your price?
No. Our fixed fee covers the plans and schedule only.

Photographs: Chris Whippet (CC BY-SA 2.0); Tim Green from Bradford (CC BY 2.0).