Free 2026 London Planning Report — What drawings do I need to regularise building work in London?

Box dormer loft conversion on the back of a London terrace, the kind of work often found with no building control sign-off

Building Regulations RegularisationFrom £845

What drawings do I need to regularise building work in London?

To regularise building work done without building control approval in London, you need a plan of the work as it stands, a plan of the layout before it was done, and a plan of any extra work needed to bring it up to standard. We survey, draw that set and make the regularisation application for a fixed £845, with the measured survey visit included. Where the work touched the structure or the drains, structural calculations or a drainage layout are added to the pack.

Get a fixed quote from £845

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

The short answer: three plans and a statement

Regularisation is how an owner puts unapproved building work on the record. Regulation 18 of the Building Regulations 2010 lets the owner apply in writing for a regularisation certificate where unauthorised work was carried out on or after 11 November 1985. The regulation lists what goes in: a statement that the application is made under it, a description of the work, a plan of the unauthorised work and a plan of any additional work needed for it to comply. The two plans are required so far as is reasonably practicable.

For most London houses that plan is a small set of drawings rather than one sheet. The order below is the order we produce them in, because each drawing depends on the one before.

The drawings in a regularisation pack
  1. Date and describe the work

    When it was done sets which rules apply, so we collect invoices, photos and listings first and write the description from them.

  2. Before plan

    The layout as it was before the works, rebuilt from old listings, planning records or a matching house in the same terrace.

  3. As-built plans and section

    A measured drawing of the work as it stands: walls, beams, stairs, escape route, ventilation and what is still unknown.

  4. Plan of additional work

    What we expect building control to ask for, drawn in advance, with the places to open up marked on the plan.

  5. Calculations and drains

    Structural calculations where a wall or roof was altered, and a drainage layout where pipes were moved or added.

The plan nobody thinks of: how the house was before

The as-built drawing shows what is there now. Building control also needs to understand what changed, and some London councils say so outright. Richmond's guide to making a regularisation application asks for a plan of the works that have been done and how the layout was before the works.

That is the drawing owners most often cannot supply, because the wall it shows has gone. We rebuild it from what survives: floor plans in an old sales listing, an earlier application on the council's planning register, a mortgage valuation sketch, or the neighbouring house in the same terrace that still has its original layout. Where none of those exist, we mark the plan as reconstructed and say what it is based on, rather than drawing a guess as fact.

If you already have drawings of the house, check them against what was built before relying on them. Our post on what to do when drawings do not match your house covers how far out older plans usually are.

As-built drawings of the work itself

The core of the pack is a measured drawing of the unauthorised work as it stands. For a loft that means floor plans of every storey the new stair passes through and a section through the roof. For a knock-through it means the opening, the beam that is visible and the walls it bears on. For a rear extension it means the plan, the elevations and a section through the floor, wall and roof.

These are as-built drawings in the ordinary sense, with one difference: they record what we could not see. A regularisation drawing that shows a beam size nobody has checked, or an insulation thickness taken from the builder's invoice, is a drawing building control cannot rely on. We note each hidden element as unconfirmed until it has been opened up, which is also how the officer will read it.

If all you need is a record of the house for a sale or a future project, without an application, our post on getting as-built drawings of your house explains that simpler service.

Survey tripods carrying a total station and prism, the measuring kit used for an as-built survey before a regularisation
The as-built plans start with a measured survey; we only draw what was measured or seen.

Opening up: what the drawings cannot show

Building control does not take the drawings on trust. Under regulation 18 the council may require the applicant to take reasonable steps, including laying open the unauthorised work for inspection, making tests and taking samples. Richmond's guide says the same in plainer words: it may mean opening up the works, carrying out tests or sampling materials.

This is where the drawings save money. A beam hidden in a ceiling, a cavity wall of unknown build-up or a floor of unknown joist size can each be checked through a small, well-placed opening instead of a ceiling stripped end to end. We mark those places on the plan before the officer visits, so your builder opens only what is needed and makes good only what was opened.

Removed walls are the commonest reason for opening up. What drawings a load-bearing wall removal needs explains what building control would have wanted to see had the work been approved first, which is the same evidence it will look for now.

Rear extension under construction with blockwork walls and a steel beam, the structure an inspector may ask to see opened up
Steels and bearings are hidden once plastered, which is why opening up is planned on the drawings.

The plan of additional work, judged by the rules of the time

The last plan shows what must be added for the work to comply. Regulation 18 measures that against the requirements in the building regulations that were applicable to that work when it was carried out. A loft built in 2012 is judged against the regulations in force in 2012, not against the latest edition of the Approved Documents. Dating the work properly is therefore part of the drawing, not paperwork around it.

After the officer's inspection the council tells the applicant one of three things: the work it considers is required, that it cannot determine what is required, or that no work is required. We draw the likely additions before that letter arrives, typically fire doors and a protected stair for a loft, smoke alarms, extract ventilation for a bathroom, or a fire-protected beam. You then see the probable scope while you are still choosing a builder.

Lofts carry the longest list. Our post on what drawings a loft conversion needs sets out the escape and structural drawings an approved loft would have had, which is the gap a regularisation plan has to close.

Staircase with a white balustrade in a remodelled house, the escape route building control checks on a loft conversion
On a converted loft the stair and its fire protection are usually the first thing the plan of additional work addresses.

Structural calculations and drainage layouts

Where the unauthorised work changed the structure, a plan alone rarely satisfies building control. A removed wall, a new opening in a rear wall or a dormer cut into the roof needs calculations showing the beam or rafters are adequate. Our structural calculations and drawings start at £745, prepared by a structural engineer and drawn into the same set, so the beam on the plan is the one in the calculation.

Drains are the other common gap. A bathroom added in a loft or a kitchen moved into an extension usually means new pipework, and the officer will want to see where it runs and where it joins the existing drains. We show it on a drainage layout from what can be traced on site.

Selling a house with unapproved work

Many owners first hear the word regularisation during a sale. GOV.UK warns that without approval you will not have the certificates of compliance you may need when you want to sell your home. A buyer's solicitor who finds a loft or an extension with no sign-off will ask for a certificate or for another way to deal with the risk.

A regularisation certificate is evidence, but not conclusive evidence, that the requirements it lists have been met. It is not a warranty on the work. Leaving the work alone carries its own risk: under section 36 of the Building Act 1984 a notice to remove or alter contravening work cannot be given more than 10 years after the work was completed, and until then the council can still act against whoever owns the house.

Talk to your conveyancer before you apply, because the choice between a certificate and another remedy is theirs to advise on. If the work also went up without planning permission, that is a separate application to a separate team; regularisation answers the building regulations question only. Our post on what regularisation costs sets out our fee, the council's charge and the builder's costs side by side.

Which building control, and what it charges

Only the council can regularise. GOV.UK's guide on how to apply for building regulations approval says regularisation can be applied for from a local authority building control body only, so a private inspector is not an option for work already done. The application goes to the London borough the house is in.

Each council sets its own regularisation charge. Richmond, for example, asks for 120% of its current plan charge, so there the council's fee is higher than an ordinary application for the same work would have been. We tell you the figure for your borough before we apply.

If you are planning new work rather than regularising old, the cheaper route is to apply first. Our post on what building control needs for an extension lists the drawings for the ordinary route, and our building regulations regularisation service has the details of the regularisation route.

Sources

Every figure in this article, where it comes from and a link to the original.

  1. 11 November 1985: Building Regulations 2010 reg 18(1) (England): applies where unauthorised building work has been carried out (source wording: "on or after 11th November 1985"). www.legislation.gov.uk
  2. a plan of the unauthorised work and a plan of additional work: Building Regulations 2010 reg 18(2)(c)-(d): the application includes (source wording: "so far as is reasonably practicable, a plan of the unauthorised work") and a plan showing any additional work required. www.legislation.gov.uk
  3. rules applicable when the work was carried out: Building Regulations 2010 reg 18(2)(d): the relevant requirements are those (source wording: "in the building regulations which were applicable to that work when it was carried out"). www.legislation.gov.uk
  4. laying open the unauthorised work for inspection: Building Regulations 2010 reg 18(3): the authority may require reasonable steps (source wording: "including laying open the unauthorised work for inspection by the authority, making tests and taking samples"). www.legislation.gov.uk
  5. evidence, but not conclusive evidence: Building Regulations 2010 reg 18(6): (source wording: "A regularisation certificate shall be evidence (but not conclusive evidence)"). www.legislation.gov.uk
  6. local authority building control only: GOV.UK Building regulations approval, How to apply: regularisation is available (source wording: "from a local authority BCB only"). www.gov.uk
  7. certificates of compliance you may need when you sell: GOV.UK Building regulations approval: (source wording: "Without approval you will not have the certificates of compliance you may need when you want to sell your home"). www.gov.uk
  8. 10 years from completion: Building Act 1984 s36(4): a section 36 notice shall not be given (source wording: "after the expiration of 10 years from the date of the completion of the work in question"). www.legislation.gov.uk
  9. plan of the layout before the works: London Borough of Richmond upon Thames, How to make a Regularisation application: submit (source wording: "A plan of the works that have been done and how the layout was before the works"). www.richmond.gov.uk
  10. 120% of the current plan charge: London Borough of Richmond upon Thames, How to make a Regularisation application: (source wording: "Provide the correct charge (120% of the current plan charge)"). www.richmond.gov.uk

Questions people ask

Who makes the regularisation application, me or the builder?
Regulation 18 gives the right to apply to the owner. We prepare the drawings and the application and send it on your behalf, but it is made in your name as owner.
Can a private building inspector regularise the work?
No. GOV.UK says regularisation is only available from a local authority building control body, so the application goes to your London borough.
What if the work was done before November 1985?
Regulation 18 covers unauthorised work carried out on or after 11 November 1985. Older work falls outside it, and the right answer depends on what was done and when; we can advise.
Do I need drawings if the work is small, like a new bathroom?
Usually yes, but fewer. A bathroom needs a plan showing the room, its ventilation and the new drainage rather than a full set of sections.
Does a regularisation certificate cover planning permission?
No. It deals only with the building regulations. Planning permission is a separate decision by a separate team at the council.

Photographs: Matt Seymour (Unsplash License); Syced (CC0); Brett Jordan (Pexels License); Brett Jordan (Pexels License).

Building Regulations Regularisation: a fixed fee from £845

Read more on the building regulations regularisation service page, or send your address below and we reply within one working day.

Building Regulations Regularisation

from £845

£645 drawings + £200 survey (£845 total)

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • A measured survey visit of the work and the parts of the house it touches
  • A before plan of the original layout, with its sources noted
  • As-built plans and a section, with every unconfirmed element marked
  • A plan of the additional work building control is likely to require
  • Opening-up locations marked on the drawings for your builder
  • The description of the work and the regulation 18 application, sent to your council