
Planning DrawingsFrom £745
How long do planning drawings take to prepare in London?
For a typical London extension or loft, we aim to send the first full set of planning drawings about 7 days after the measured survey, and the fixed fee starts at £745 including that survey. How soon the application goes in also depends on when the survey can be booked, how quickly you send back comments, and whether the council needs a specialist report with the drawings. After submission the council's own clock starts: it validates the application, then has 8 weeks to decide a householder scheme.
The short answer: three clocks, not one
When people ask how quickly they can get planning permission drawings completed, they are usually picturing one wait. In practice there are three. First comes the drawing stage: survey, drafting and your changes. Then the council checks the application is valid. Only then does the decision period run, which for most home extensions is 8 weeks.
Only the first of those is ours to speed up. This post covers the drawing stage in detail. For what happens once the council has the application, our guide on how long planning permission takes in London walks through the council side, including consultation and committee.
For what the council does with the drawings once they are in, see what happens after your planning drawings are finished.
- Quote, then survey
Fixed fee in writing, then one visit to laser-measure the house. Booking often takes a few days, longer if access is tricky.
- First full set
Existing and proposed plans and elevations, aimed for about 7 days after the survey.
- Your changes
You mark up the drafts; we revise. This step takes as long as the decisions take.
- Submission and validation
We submit; the council checks the form, fee and plans before it registers the application.
- Decision period
8 weeks for a householder scheme, counted from validation, unless you agree more time in writing.
How long does it take to prepare the drawings themselves?
Once the house has been measured, the drafting work is the most predictable part. We draw the existing floor plans and elevations from the survey, then the proposed scheme on top of them, and send the set to you as PDFs. Our working target is a first full set about 7 days after the survey for a typical rear, side return or loft scheme.
Larger or less usual jobs take longer, and we say so when we quote rather than after. A wraparound extension with a new roof form, a basement, or a scheme on a corner plot with two street elevations has more to draw and more to check. So does a house where the survey turns up something unexpected, such as an earlier extension that was never on any plan.
Planning drawings must be drawn to an identified scale and show the direction of north, and the location plan should typically be at 1:1250 or 1:2500. Getting those basics right first time costs a little drafting time and saves a validation query later.

What slows planning drawings down
Booking the survey. The visit needs someone at home and access to every floor and the garden. In a tenanted house, a flat with a shared entrance or a home with building work already under way, finding a date can take longer than the drafting.
Your feedback. Most delay in practice sits between the first draft and the final set. Deciding between a full-width or part-width extension, or where the kitchen goes, is a real decision and worth time. Sending all your comments in one marked-up reply, rather than a few at a time, is the single easiest way to keep the job moving. Our post on how many revisions are included in drawing fees explains how rounds of changes work.
Other consultants. Some sites need more than drawings before the council will accept the application: a tree report where trees are close to the work, a heritage statement in a conservation area, a flood risk assessment in a flood zone, or a daylight study where neighbours' windows are close. Each has its own booking and report time, and the drawings often need a small change once the report is back.
Then the council checks the application is valid
Submitting the drawings is not the moment the council's clock starts. Government guidance says a valid application needs a completed form, the national information requirements, the correct application fee and any local information the council asks for. Applications should be validated as soon as practicable, and where something is missing the council should say what needs fixing.
A validation query is where a well-prepared drawing set earns its keep. A missing north point, a red line that does not reach the road, or an ownership certificate left blank can mean the application sits unregistered while the gap is fixed. Without a completed ownership certificate, the guidance says, an application is not valid and cannot be decided. Our post on what drawings a householder planning application needs lists the full set.

The 8-week decision period, and when it can run longer
Once an application is validated, government guidance sets the time limits for a decision: 8 weeks for most applications, including householder extensions, and 13 weeks for major development. A longer period can apply only if it is agreed in writing with the applicant.
Councils do sometimes ask for an extension of time, often to allow amended drawings rather than refuse. Whether to agree is your choice. Amendments asked for during this stage are part of what our fee covers. The detail of consultation, delegated decisions and committees is in our planning permission timescale guide.
How to get your drawings done sooner
Send photographs of the rear of the house, the loft and any past extensions with your quote request, plus any old plans you have, even estate agent ones. They help us plan the visit and spot problems early. Have a clear idea of what you want to build, and if you are weighing two options, tell us both at the start so the first draft can show them side by side.
Check early whether you need planning permission at all. Some extensions fall within permitted development and need a lawful development certificate or prior approval instead, which changes the drawing set and the council timescale. If you are unsure whether drawings can be prepared without anyone visiting, our post on getting planning drawings online explains what is done remotely.

What you pay while you wait
Planning drawings start at £745 in total, and that includes the measured survey visit. The fee is fixed: a slower job because of booking or feedback does not cost you more, and redraws until the council decides are included. No VAT is charged on our fees. The council application fee is paid to the council separately.
To get a date for your survey and a written fixed fee, use the form on the planning drawings page. Every fee we charge is listed on our pricing page.
Sources
Every figure in this article, where it comes from and a link to the original.
- identified scale: PPG Making an application, para 023 (source wording: "Any plans or drawings must be drawn to an identified scale"). www.gov.uk
- 1:1250 or 1:2500: PPG Making an application, para 024: location plan scale (source wording: "The scale should typically be 1:1250 or 1:2500"). www.gov.uk
- four requirements: PPG Making an application, para 016: valid application needs completed form, national information requirements, correct fee, local information requirements (source wording: "The submission of a valid application for planning permission requires:"). www.gov.uk
- as soon as practicable: PPG Making an application, para 047 (source wording: "Applications should be validated as soon as practicable"). www.gov.uk
- not valid: PPG Making an application, para 025: without a completed ownership certificate the application is not valid (source wording: "is not valid, and therefore cannot be determined by the local planning authority"). www.gov.uk
- 8: PPG Determining a planning application, para 001 (source wording: "8 weeks for all other types of development"). www.gov.uk
- 13: PPG Determining a planning application, para 001 (source wording: "13 weeks for applications for major development"). www.gov.uk
- in writing: PPG Determining a planning application, para 001: longer period only if agreed (source wording: "agreed in writing with the applicant"). www.gov.uk
Questions people ask
How quickly can I get planning permission drawings completed?
Does the 8-week council period include the time to draw the plans?
What is the quickest way to get my drawings finished?
What happens if the council says my application is invalid?
Do I need a tree or heritage report before the drawings can be submitted?
Photographs: T (Unsplash License); Martin Sepion (Unsplash License); Derek Harper (CC BY-SA 2.0); David Hawgood (CC BY-SA 2.0).
Planning Drawings: a fixed fee from £745
Read more on the planning drawings service page, or send your address below and we reply within one working day.
Planning Drawings
from £745
£545 drawings + £200 survey (£745 total)
Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.
What you get
- A fixed fee in writing before the survey is booked
- One measured survey visit, included in the price
- A first full set aimed for about 7 days after the survey
- Existing and proposed plans and elevations drawn to scale
- Location and block plans on licensed mapping
- Submission to the council and replies to validation queries