
New Build Drawings in Havering
Fixed-fee, MCIAT-chartered new build drawings for Havering homeowners — London Borough of Havering validation and local constraints handled from the start.
Havering is outer-London suburbia on the edge of Essex. Interwar and post-war semi-detached houses spread across Romford, Hornchurch and Elm Park, larger detached homes define Emerson Park, and Rainham, Harold Wood and Collier Row add to the borough's suburban grain. Toward Upminster and Havering-atte-Bower the character turns green-belt and edge-of-London, with more rural and historic settings around Corbets Tey. The generous plots across most of the borough make substantial rear and double-storey extensions viable in a way a tight inner-London terrace never allows.
Two constraints shape the scale of what can be built. Green-belt policy across the borough's eastern and northern edges assesses extensions against strict limits on disproportionate additions to the original dwelling, so on those properties siting and scale must be evidenced carefully. Conservation control in the Romford Conservation Area, Upminster's Tithe Barn, Hornchurch, Emerson Park, Havering-atte-Bower and Corbets Tey governs materials and design in the historic cores. Havering has no borough-wide Article 4 direction affecting typical householder permitted development, so detached and semi-detached homes often retain fuller rights than inner-London terraces.
We prepare Havering planning drawings that use the available plot fully while respecting green-belt and conservation constraints, checking permitted development limits for semi-detached and detached homes first and confirming them with a Lawful Development Certificate where a scheme qualifies. On green-belt properties we design and evidence to policy; in the conservation cores we design to the area's character rather than a name-swap template. The fee is agreed up front as a fixed figure, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Havering approves. The council decides most householder applications within the statutory eight-week period once validated, so we submit validation-first to hold that timescale.


Planning in Havering: what to know before you apply
Havering has no borough-wide Article 4 direction affecting typical householder permitted development; the binding constraints are green-belt policy across the eastern and northern edges and conservation-area control in Upminster, Hornchurch and Emerson Park. The borough's detached and semi-detached homes often retain fuller permitted development rights than inner-London terraces.
Typical Havering housing stock
Interwar and post-war semi-detached suburbia across Romford, Hornchurch and Elm Park, larger detached houses in Emerson Park, and green-belt and edge-of-London properties toward Upminster and Havering-atte-Bower.
Areas we regularly draw for in Havering
Romford · Hornchurch · Upminster · Rainham · Elm Park · Harold Wood · Emerson Park · Collier Row
What the numbers say about Havering planning decisions
These are London Borough of Havering’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.
All development decided in Havering
Every planning application London Borough of Havering decided over the four quarters to 2026 Q1, not only householder work — a new dwelling is decided in this wider pool.
| Applications decided | 1,501 |
|---|---|
| Granted | 1,116 |
| Refused | 385 |
| GrantedAcross all development types, so it is not comparable with the householder rate | 74% |
| Householder applications within itThe rest is the pool a new dwelling is decided in | 1,019 |
Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.
If London Borough of Havering refuses: appeal outcomes
Planning appeals against London Borough of Havering determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.
| Appeals determined | 770 |
|---|---|
| Allowed | 246 |
| Dismissed | 524 |
| Householder appeals allowedFrom 317 householder appeals. England average 36% | 44% |
Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.
New Build Drawings for Havering homes: the package and the process
A new dwelling is a full application rather than a householder one, and the drawing set reflects that: site layout with levels and boundaries, floor plans and elevations for the new building, sections showing how it sits in the ground, and street-scene elevations placing it against what is already there.
Two packages follow the approval — the planning set and the construction set — and they have to stay in step. Foundation design, drainage strategy, thermal performance and fire strategy are drawn for Building Control against the same geometry that was granted permission, so the built house matches the approved one.
An infill plot is designed against its neighbours. Plot width, the building line either side, and the ridge heights next door set what the new house can be — and on a tight urban site those constraints usually shape the design more than the brief does.
Is my plot suitable for a new build in London?
A feasibility assessment looks at plot size and shape, access, existing boundary conditions, relevant planning policy for the borough, and the likely impact of a new dwelling on neighbouring properties before any design work begins. Infill plots — a gap between existing buildings on a street — and backland plots — a garden or yard site behind existing houses, reached by a shared access — each raise different issues: infill schemes are usually judged on how well they match the scale, spacing and character of the street, while backland schemes are judged heavily on overlooking, garden loss for neighbours, and whether the access arrangement is acceptable. A feasibility study gives an honest view of whether a scheme is likely to succeed before you commit to full drawings.
What does pre-application advice add to a new build project?
Pre-application advice is a formal, paid process most London boroughs offer, where planning officers give written feedback on a proposed scheme before a full application is submitted. For a new build — where the principle of development itself is often the main issue, not just the design details — this feedback can be invaluable: it surfaces concerns around density, massing, daylight and sunlight or heritage context early enough to be addressed in the drawings, rather than discovered for the first time as a refusal reason months into a full application. We prepare and submit pre-application enquiries as part of the new build service where it is likely to strengthen the eventual planning application.
How do daylight, sunlight and overlooking affect a new build design?
London boroughs assess new dwellings against their effect on the daylight and sunlight reaching neighbouring homes and gardens, commonly using the 45-degree rule as an initial check on a proposal's massing and position relative to neighbouring windows, alongside more detailed daylight and sunlight assessment on sensitive sites. Overlooking and loss of privacy from new windows, upper floors or roof terraces are assessed similarly, and often shape decisions on window placement, floor-to-floor heights and the overall footprint and massing of the new building. Designing with these constraints from the earliest sketch stage, rather than adjusting for them after a refusal, is one of the main advantages of instructing feasibility and pre-application work before a full planning set.
| Stage | What it establishes | Typical fee guide |
|---|---|---|
| Feasibility | Whether the plot can support a new dwelling and the likely constraints | Quoted individually, from within the £2,500 new build fee |
| Pre-application advice | Written borough feedback on the scheme before a full application | Quoted individually alongside the planning fee |
| Full planning drawings | The complete drawing set submitted for planning permission | From £2,500 |
| Building regs and structural | Construction-ready drawings and calculations for building | From £2,200–£3,850, quoted once planning is settled |

New Build Drawings across Havering
New Build Drawings in Havering — FAQs
How much do new build drawings cost in London?+
Can any garden or backland plot be built on in London?+
Do I need pre-application advice before a full new build application?+
Do you handle building regulations and structural drawings for a new build, or only planning?+
How long does a new build project take from feasibility to planning permission?+
Do I need planning permission for an extension in Havering?+
How does green-belt land affect my Havering project?+
Can I build a bigger extension because Havering plots are larger?+
How long does Havering Council take to decide?+
How much do planning drawings cost in Havering?+
Get your free Havering planning assessment
Tell us your Havering address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.