MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in Havering

Suburban detached and semi-detached houses of the kind found across Havering's Hornchurch and Emerson Park
Havering · London

Planning Permission in Havering

Fixed-fee, MCIAT-chartered planning permission for Havering homeowners — London Borough of Havering validation and local constraints handled from the start.

Free Havering planning assessment

Tell us your Havering address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Havering is outer-London suburbia on the edge of Essex. Interwar and post-war semi-detached houses spread across Romford, Hornchurch and Elm Park, larger detached homes define Emerson Park, and Rainham, Harold Wood and Collier Row add to the borough's suburban grain. Toward Upminster and Havering-atte-Bower the character turns green-belt and edge-of-London, with more rural and historic settings around Corbets Tey. The generous plots across most of the borough make substantial rear and double-storey extensions viable in a way a tight inner-London terrace never allows.

Two constraints shape the scale of what can be built. Green-belt policy across the borough's eastern and northern edges assesses extensions against strict limits on disproportionate additions to the original dwelling, so on those properties siting and scale must be evidenced carefully. Conservation control in the Romford Conservation Area, Upminster's Tithe Barn, Hornchurch, Emerson Park, Havering-atte-Bower and Corbets Tey governs materials and design in the historic cores. Havering has no borough-wide Article 4 direction affecting typical householder permitted development, so detached and semi-detached homes often retain fuller rights than inner-London terraces.

We prepare Havering planning drawings that use the available plot fully while respecting green-belt and conservation constraints, checking permitted development limits for semi-detached and detached homes first and confirming them with a Lawful Development Certificate where a scheme qualifies. On green-belt properties we design and evidence to policy; in the conservation cores we design to the area's character rather than a name-swap template. The fee is agreed up front as a fixed figure, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Havering approves. The council decides most householder applications within the statutory eight-week period once validated, so we submit validation-first to hold that timescale.

Suburban detached and semi-detached houses of the kind found across Havering's Hornchurch and Emerson Park
Isometric illustration of a Havering home extension design
Proposed floor plan
Havering

Planning in Havering: what to know before you apply

Havering has no borough-wide Article 4 direction affecting typical householder permitted development; the binding constraints are green-belt policy across the eastern and northern edges and conservation-area control in Upminster, Hornchurch and Emerson Park. The borough's detached and semi-detached homes often retain fuller permitted development rights than inner-London terraces.

Typical Havering housing stock

Interwar and post-war semi-detached suburbia across Romford, Hornchurch and Elm Park, larger detached houses in Emerson Park, and green-belt and edge-of-London properties toward Upminster and Havering-atte-Bower.

Areas we regularly draw for in Havering

Romford · Hornchurch · Upminster · Rainham · Elm Park · Harold Wood · Emerson Park · Collier Row

What the numbers say about Havering planning decisions

These are London Borough of Havering’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

Householder decisions in Havering

Every householder application London Borough of Havering decided over the four quarters to 2026 Q1.

Householder applications decided1,019
Granted844
Refused175
GrantedEngland average 90%83%
Of which prior approvalsPrior approvals are granted far more often than full applications, so this share moves the rate above42%
Decided within 8 weeksExcludes prior approvals. England average 93%97%

Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

Permitted development in Havering

Larger householder extensions put to London Borough of Havering under the prior-approval route, and lawful-development certificates decided, over eight quarters.

Prior approval not requiredWent ahead without a full application340
Prior approval granted42
Prior approval refused65
Granted where a decision was neededFrom 107 determinations39%
Building upwards, prior approval refused0
Certificates of lawful development decided1,097

Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

Designated areas in Havering

Conservation areas London Borough of Havering has published to the national register, and when it designated them. Where a borough has supplied no Article 4 data the row is omitted rather than shown as zero.

Conservation areas on the register11
First designatedOf the 6 whose designation date the register records1,968
Most recent designation2,010

Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.

If London Borough of Havering refuses: appeal outcomes

Planning appeals against London Borough of Havering determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.

Appeals determined770
Allowed246
Dismissed524
Householder appeals allowedFrom 317 householder appeals. England average 36%44%

Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.

Planning Permission for Havering homes: the package and the process

A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.

Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.

Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

How long does planning permission take, and what does it cost?

Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
Sheet from a planning permission package prepared for a Havering property, drawn to London Borough of Havering validation standards
A sheet from the planning permission package we submit to London Borough of Havering.
FAQ

Planning Permission in Havering — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for an extension in Havering?+
Havering has no borough-wide Article 4 direction affecting typical householder permitted development, so its detached and semi-detached homes often keep fuller rights than inner-London terraces — larger rear and single-storey extensions can qualify. Green-belt land toward the east and conservation areas such as Upminster and Emerson Park restrict this. We check your address first and can confirm permitted development with a Lawful Development Certificate.
How does green-belt land affect my Havering project?+
On green-belt properties toward the borough's eastern and northern edges, extensions are assessed against strict limits on disproportionate additions to the original dwelling. It does not rule out an extension, but scale and siting matter and the case must be evidenced carefully. We confirm whether your property is green belt and design a scheme that stays within policy.
Can I build a bigger extension because Havering plots are larger?+
Often, yes. The generous interwar and detached plots across Hornchurch, Emerson Park and Upminster make substantial rear and double-storey extensions viable where a tight terrace could not. The limit is usually policy rather than space. We design to use the plot fully within permitted-development allowances or a well-evidenced full application.
How long does Havering Council take to decide?+
Havering determines most householder applications within the statutory eight-week period once validated; green-belt and conservation cases can involve additional consultation. A complete, correctly scaled submission is the best way to avoid a validation query — we prepare Havering drawings to the council's checklist to keep the application on track.
How much do planning drawings cost in Havering?+
We quote a fixed fee upfront, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Havering approves. Because plots here allow larger schemes, the fee tracks complexity — a single-storey rear differs from a double-storey or a green-belt case — and we confirm it once we understand your plans.
Free Fixed Quote

Get your free Havering planning assessment

Tell us your Havering address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.