
New Build Drawings in Rush Green RM7
Fixed-fee, MCIAT-chartered new build drawings for Rush Green (RM7) homeowners — London Borough of Havering validation and local constraints handled from the start.
Rush Green (RM7) is an interwar residential suburb straddling the boundary between the London Boroughs of Havering and Barking & Dagenham along Rush Green Road, built up largely in the 1920s and 1930s with semi-detached housing and now anchored by Queen's Hospital nearby. Most householder projects here are extensions or lofts on those cohesive interwar semis, so the drawings have to sit comfortably within a consistent, planned streetscape.
There is no conservation area covering the Rush Green part of RM7 — that is a genuine, verified fact, not an omission. Its planning character is instead shaped by the uniformity of the interwar semi-detached layout and by the London Borough of Havering's householder design expectations, which lean on keeping the paired-house symmetry, original materials and roof forms intact. We treat that suburban cohesion, rather than a conservation designation, as the reference point when we design an extension.
Demand for rear extensions, side extensions and loft conversions runs steadily across roads like Sylvan Avenue, Kings Avenue and Whalebone Grove, where interwar semis sit on regular plots. Because the borough boundary runs through the suburb, we confirm which authority your property falls in and check its permitted-development position against Havering's borough-wide controls first, then prepare drawings that either stay within permitted development or are ready to validate as a full householder application.


Planning in Rush Green (RM7): what to know before you apply
Because Rush Green is a consistent interwar suburb of semi-detached houses, Havering assess extensions against the steady street rhythm and paired-house symmetry, so matching original brick, render and roof form and respecting the shared building line matters alongside the numbers. There is no conservation area and no local Article 4 direction in the Rush Green part of RM7, so many houses retain permitted development rights for rear and loft work — but modest plots, shared party walls and the Havering–Barking & Dagenham boundary running through the suburb mean depth, height, neighbour impact and confirming the correct authority are the points a householder application is judged on.
Typical Rush Green housing stock
Predominantly interwar semi-detached houses on planned suburban roads, with postwar and modern infill on regular plots. Those consistent interwar semis, on regular plots with front and rear gardens, are what drive most of the rear-extension, side-extension and loft-conversion work across the area.
Streets we regularly draw for in Rush Green
Mill Lane · East Road · Crow Lane · Whalebone Grove · Hainault Road · Kings Avenue · Sylvan Avenue · Albany Road · Gordon Road · Millbrook Gardens · Whalebone Avenue · Burchett Way
What RM7 is actually built of
Measured from 270 classified residential buildings in RM7, not from a description of the area.
Rush Green RM7 housing mix
Residential building form across the RM7 postcode district, from 270 classified buildings.
| Attached on more than one side | 41% |
|---|---|
| Attached on one side | 54% |
| Detached | 4% |
| Median building footprint | 59 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.26 |
| Buildings classified | 270 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
New Build Drawings for Rush Green (RM7) homes: the package and the process
A new dwelling is a full application rather than a householder one, and the drawing set reflects that: site layout with levels and boundaries, floor plans and elevations for the new building, sections showing how it sits in the ground, and street-scene elevations placing it against what is already there.
Two packages follow the approval — the planning set and the construction set — and they have to stay in step. Foundation design, drainage strategy, thermal performance and fire strategy are drawn for Building Control against the same geometry that was granted permission, so the built house matches the approved one.
An infill plot is designed against its neighbours. Plot width, the building line either side, and the ridge heights next door set what the new house can be — and on a tight urban site those constraints usually shape the design more than the brief does.
Is my plot suitable for a new build in London?
A feasibility assessment looks at plot size and shape, access, existing boundary conditions, relevant planning policy for the borough, and the likely impact of a new dwelling on neighbouring properties before any design work begins. Infill plots — a gap between existing buildings on a street — and backland plots — a garden or yard site behind existing houses, reached by a shared access — each raise different issues: infill schemes are usually judged on how well they match the scale, spacing and character of the street, while backland schemes are judged heavily on overlooking, garden loss for neighbours, and whether the access arrangement is acceptable. A feasibility study gives an honest view of whether a scheme is likely to succeed before you commit to full drawings.
What does pre-application advice add to a new build project?
Pre-application advice is a formal, paid process most London boroughs offer, where planning officers give written feedback on a proposed scheme before a full application is submitted. For a new build — where the principle of development itself is often the main issue, not just the design details — this feedback can be invaluable: it surfaces concerns around density, massing, daylight and sunlight or heritage context early enough to be addressed in the drawings, rather than discovered for the first time as a refusal reason months into a full application. We prepare and submit pre-application enquiries as part of the new build service where it is likely to strengthen the eventual planning application.
How do daylight, sunlight and overlooking affect a new build design?
London boroughs assess new dwellings against their effect on the daylight and sunlight reaching neighbouring homes and gardens, commonly using the 45-degree rule as an initial check on a proposal's massing and position relative to neighbouring windows, alongside more detailed daylight and sunlight assessment on sensitive sites. Overlooking and loss of privacy from new windows, upper floors or roof terraces are assessed similarly, and often shape decisions on window placement, floor-to-floor heights and the overall footprint and massing of the new building. Designing with these constraints from the earliest sketch stage, rather than adjusting for them after a refusal, is one of the main advantages of instructing feasibility and pre-application work before a full planning set.
| Stage | What it establishes | Typical fee guide |
|---|---|---|
| Feasibility | Whether the plot can support a new dwelling and the likely constraints | Quoted individually, from within the £2,500 new build fee |
| Pre-application advice | Written borough feedback on the scheme before a full application | Quoted individually alongside the planning fee |
| Full planning drawings | The complete drawing set submitted for planning permission | From £2,500 |
| Building regs and structural | Construction-ready drawings and calculations for building | From £2,200–£3,850, quoted once planning is settled |

New Build Drawings in Rush Green RM7 — FAQs
How much do new build drawings cost in London?+
Can any garden or backland plot be built on in London?+
Do I need pre-application advice before a full new build application?+
Do you handle building regulations and structural drawings for a new build, or only planning?+
How long does a new build project take from feasibility to planning permission?+
Do I need planning permission to extend a house in Rush Green?+
Is Rush Green in a conservation area?+
How much do planning and building-regulation drawings cost for a Rush Green extension?+
How long does Havering Council take to decide?+
Get your free Rush Green planning assessment
Tell us your Rush Green (RM7) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.