MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex
25 Eccleston Place, Victoria, London SW1W 9NFhello@drawingsdirect.co.uk020 7864 7245WhatsApp

Free 2026 London Planning Report — Structural drawings in Bexley

Suburban high street around a war memorial and a mature tree
Bexley · London

Structural drawings in Bexley

In Bexley, structural drawings normally follow the planning decision: once the layout is approved, they size the beams and openings for a loft, rear extension or removed wall, and Building Control checks the calculations. DrawingsDirect's structural calculations for a single beam or opening start from £745.

Fixed fee from £745 · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

Bexley householder decisions in the latest figures

Bexley made 877 householder decisions in the four quarters 2025 Q3 to 2026 Q2, counting prior approvals, and 95% were granted. Excluding prior approvals, the share decided within 8 weeks rounds to 100% (our analysis of MHCLG planning application statistics, table PS2).

For a structural job, speed on the planning side matters because the beam design should follow the approved layout, not guess at it. If your project is still at the layout stage, our floor plans in Bexley page is the place to start, and planning permission in Bexley covers the application.

The appeals record

Of 157 householder appeals decided between 2021 and 2026, 34% were allowed (our analysis of the Planning Inspectorate Casework Database, release 2609). That is a history of the borough, not a forecast for any one application.

The national register holds 31 conservation-area entries for Bexley (our analysis of the MHCLG Planning Data Platform conservation-area dataset, snapshot retrieved 14 Aug 2026). Check the council's own conservation area map before you plan any change to the outside of the house.

Metal stud partitions and plasterboard sheets during a conversion
New timber roof frame on a house extension behind a hedge and brick wall on All Hallows Road, scaffolding around the new structure

Of 157 householder appeals decided between 2021 and 2026, 34% were allowed (our analysis of the Planning Inspectorate Casework Database, release 2609).

Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609)). www.gov.uk

What the structural set covers

Expect a calculation for each new beam, lintel or padstone, a plan marking where each sits, and details of the bearings. Builders order from it and Building Control checks it against the Building Regulations package, which our Building Regulations drawings service prepares.

For the stages in order, read structural calculations explained.

Timing, notices and fee

On a full plans application the authority must notify its outcome within five weeks of receipt, or a longer period agreed in writing (Building Regulations 2010, regulation 14A(6)). Where a beam bears on a shared wall, a party structure notice is served at least two months before the proposed work begins (Party Wall etc. Act 1996, section 3(2)(a); legislation.gov.uk).

Structural calculations start from £745, for a single beam or opening. Building Control charges separately.

DrawingsDirect sample structural sheet showing a steel beam and its bearings
Sample drawing
Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
£745DrawingsDirect starting fixed fee for structural calculations for a single beam or opening, from the published price listdrawingsdirect.co.uk
five weeksBuilding Regulations 2010 reg 14A(6): the authority must notify the outcome of a full plans application within five weeks of receipt, or a longer agreed period (source wording: "within five weeks beginning with the date the application is received")www.legislation.gov.uk
two monthsParty Wall etc. Act 1996 s3(2)(a): a party structure notice is served at least two months before the proposed work begins (source wording: "at least two months before the date on which the proposed work will begin")www.legislation.gov.uk
877Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
95%Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
100%Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
157Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
34%Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
31Our analysis of MHCLG Planning Data Platform conservation-area and article-4-direction datasets (bulk snapshot retrieved 14 Aug 2026)www.planning.data.gov.uk
FAQ

Questions people ask

Do I need calculations if my builder specifies the steel?
Building Control will still want the calculation on file. A builder's rule of thumb is not a substitute for a checked design.
Can I send photos instead of drawings?
Photos help, but sizing a beam needs dimensions. If you have no drawings, a measured survey gives us a reliable base.

Photographs: Derek Harper (CC BY-SA 2.0); Peikko (Public Domain).