Planning Permission in Bexley
Fixed-fee, MCIAT-chartered planning permission for Bexley homeowners — London Borough of Bexley validation and local constraints handled from the start.
Bexley is predominantly interwar suburban London: semi-detached houses dominant across Bexleyheath, Sidcup and Welling, the historic core of Old Bexley Village with its Victorian and older housing, and riverside and post-war housing running toward Erith, Belvedere and the Thames. The generous suburban plots make rear and double-storey extensions and loft conversions the borough's most requested projects, and they frequently allow larger schemes than the tight terraces of inner London could ever accommodate.
Bexley has no borough-wide Article 4 direction affecting typical householder permitted development, so its semi-detached and detached homes often keep fuller rights than inner-London terraces — larger rear and single-storey extensions can qualify without a full application. The binding constraints instead are conservation-area control in Old Bexley Village, Danson Park and the Upton area of Bexleyheath — home to William Morris's Red House — as well as Blendon, Lamorbey and Crayford Town, and the council's expectation that extensions respect the consistent interwar building line. Thames-side and flood-zone considerations apply toward Erith and the riverside. The practical limit on a Bexleyheath or Sidcup plot is usually design and amenity policy rather than available space.
We prepare Bexley planning drawings that use the available plot fully while respecting conservation and the established suburban building line, checking permitted development limits for semi-detached and detached homes first and confirming eligibility with a Lawful Development Certificate where a project qualifies. Because the borough determines most householder applications within the statutory eight-week period once validated, we prepare submissions validation-first to keep them moving. The fee is fixed and agreed up front, drawings typically follow within about seven days, and we offer free redraws until Bexley approves — the same council-accepted drawings an architect would produce, usually at around 30% less.


Planning in Bexley: what to know before you apply
Bexley has no borough-wide Article 4 direction affecting typical householder permitted development; the binding constraints are conservation-area control in Old Bexley Village, Danson Park and the Upton area of Bexleyheath, and the council's expectation that extensions respect the suburban building line. Thames flood-zone considerations apply toward Erith. The borough's semis often retain fuller permitted development rights than inner-London terraces.
Typical Bexley housing stock
Interwar semi-detached suburbia dominant across Bexleyheath, Sidcup and Welling, Victorian and older housing around the historic Old Bexley Village, and riverside and post-war housing toward Erith and Thamesmead.
Areas we regularly draw for in Bexley
Bexleyheath · Sidcup · Welling · Erith · Crayford · Old Bexley · Belvedere · Blackfen
What the numbers say about Bexley planning decisions
These are London Borough of Bexley’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.
Householder decisions in Bexley
Every householder application London Borough of Bexley decided over the four quarters to 2026 Q1.
| Householder applications decided | 939 |
|---|---|
| Granted | 895 |
| Refused | 44 |
| GrantedEngland average 90% | 95% |
| Of which prior approvalsPrior approvals are granted far more often than full applications, so this share moves the rate above | 10% |
| Decided within 8 weeksExcludes prior approvals. England average 93% | 99% |
Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.
Permitted development in Bexley
Larger householder extensions put to London Borough of Bexley under the prior-approval route, and lawful-development certificates decided, over eight quarters.
| Prior approval not requiredWent ahead without a full application | 152 |
|---|---|
| Prior approval granted | 18 |
| Prior approval refused | 30 |
| Granted where a decision was neededFrom 48 determinations | 38% |
| Building upwards, prior approval refused | 1 |
| Certificates of lawful development decided | 574 |
Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.
Designated areas in Bexley
Conservation areas London Borough of Bexley has published to the national register, and when it designated them. Where a borough has supplied no Article 4 data the row is omitted rather than shown as zero.
| Conservation areas on the register | 31 |
|---|---|
| First designatedOf the 22 whose designation date the register records | 1,973 |
| Most recent designation | 2,005 |
Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.
If London Borough of Bexley refuses: appeal outcomes
Planning appeals against London Borough of Bexley determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.
| Appeals determined | 371 |
|---|---|
| Allowed | 113 |
| Dismissed | 258 |
| Householder appeals allowedFrom 169 householder appeals. England average 36% | 35% |
Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.
Planning Permission for Bexley homes: the package and the process
A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.
Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.
Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
How long does planning permission take, and what does it cost?
Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |

Planning Permission across Bexley
Planning Permission in Bexley — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for an extension in Bexley?+
Can I build a bigger extension because Bexley plots are larger?+
What extra control applies in Old Bexley Village or around Danson Park?+
How long does Bexley Council take to decide?+