MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in Rainham RM13

Rear extension drawings for a Rainham RM13 semi-detached house, London Borough of Havering
Rainham · RM13 · Havering

Planning Permission in Rainham RM13

Fixed-fee, MCIAT-chartered planning permission for Rainham (RM13) homeowners — London Borough of Havering validation and local constraints handled from the start.

Free Rainham planning assessment

Tell us your Rainham (RM13) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Rainham is an outer-east Havering neighbourhood in RM13 where a small historic village core sits within broad interwar and post-war housing estates stretching toward the marshes. The bulk of our work here is rear and side-return extensions, loft conversions and garden-facing kitchen extensions on family semis and terraces that generally fall within permitted development.

Around the Rainham Village conservation area near Rainham Hall and the church, permitted development rights are trimmed and materials matter, so we detail those schemes to the standard London Borough of Havering expects while keeping the everyday suburban streets efficient and fully compliant.

Rear extension drawings for a Rainham RM13 semi-detached house, London Borough of Havering
Isometric illustration of a Rainham RM13 home planning permission design
Proposed floor plan
Rainham RM13

Planning in Rainham (RM13): what to know before you apply

No published householder Article 4 direction applies in Rainham; the principal constraint is the Rainham Village conservation area, and lower-lying plots near the marshes can attract flood-risk scrutiny. Most surrounding interwar and post-war houses retain normal permitted development rights.

Typical Rainham housing stock

Rainham pairs a tight historic core near Rainham Hall and the medieval church with wide belts of 1930s and post-war semi-detached and terraced housing running out toward the marshes. Most homes are unlisted family houses with generous rear gardens, well suited to rear extensions, side infills and loft conversions.

Streets we regularly draw for in Rainham

Upminster Road North · Lambs Lane South · Brookway · Elizabeth Road

What RM13 is actually built of

Measured from 361 classified residential buildings in RM13, not from a description of the area.

Rainham RM13 housing mix

Residential building form across the RM13 postcode district, from 361 classified buildings.

Attached on more than one side36%
Attached on one side49%
Detached15%
Median building footprint61 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate1.46
Buildings classified361

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.

Planning Permission for Rainham (RM13) homes: the package and the process

A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.

Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.

Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

How long does planning permission take, and what does it cost?

Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
Sheet from a planning permission package drawn for a Rainham property in RM13, showing the existing and proposed arrangement at scale
A sheet from the planning permission package we submit to London Borough of Havering for Rainham (RM13) properties.
FAQ

Planning Permission in Rainham RM13 — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for an extension in Havering?+
Havering has no borough-wide Article 4 direction affecting typical householder permitted development, so its detached and semi-detached homes often keep fuller rights than inner-London terraces — larger rear and single-storey extensions can qualify. Green-belt land toward the east and conservation areas such as Upminster and Emerson Park restrict this. We check your address first and can confirm permitted development with a Lawful Development Certificate.
How does green-belt land affect my Havering project?+
On green-belt properties toward the borough's eastern and northern edges, extensions are assessed against strict limits on disproportionate additions to the original dwelling. It does not rule out an extension, but scale and siting matter and the case must be evidenced carefully. We confirm whether your property is green belt and design a scheme that stays within policy.
Can I build a bigger extension because Havering plots are larger?+
Often, yes. The generous interwar and detached plots across Hornchurch, Emerson Park and Upminster make substantial rear and double-storey extensions viable where a tight terrace could not. The limit is usually policy rather than space. We design to use the plot fully within permitted-development allowances or a well-evidenced full application.
How long does Havering Council take to decide?+
Havering determines most householder applications within the statutory eight-week period once validated; green-belt and conservation cases can involve additional consultation. A complete, correctly scaled submission is the best way to avoid a validation query — we prepare Havering drawings to the council's checklist to keep the application on track.
How much do planning drawings cost in Havering?+
We quote a fixed fee upfront, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Havering approves. Because plots here allow larger schemes, the fee tracks complexity — a single-storey rear differs from a double-storey or a green-belt case — and we confirm it once we understand your plans.
Free Fixed Quote

Get your free Rainham planning assessment

Tell us your Rainham (RM13) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.