MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Drawings in Kensington & Chelsea

Stucco-fronted townhouses in Notting Hill, characteristic of the Royal Borough of Kensington and Chelsea
Kensington & Chelsea · London

Planning Drawings in Kensington & Chelsea

Fixed-fee, MCIAT-chartered planning drawings for Kensington & Chelsea homeowners — Royal Borough of Kensington and Chelsea validation and local constraints handled from the start.

Free Kensington & Chelsea planning assessment

Tell us your Kensington & Chelsea address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

The Royal Borough of Kensington and Chelsea is one of the most design-controlled authorities in the country: a very high proportion of its grand stucco-fronted townhouses, garden-square terraces, red-brick mansion blocks and cobbled mews houses are listed or sit within conservation areas. Designations such as Kensington, Chelsea, Ladbroke (Notting Hill), Holland Park, Brompton and Earl's Court Square carry detailed material and elevation control, so applications succeed on the strength of precise, heritage-led drawings rather than standard templates.

Permitted development can rarely be assumed here. Near-comprehensive conservation-area coverage across Kensington, Chelsea, Notting Hill and South Kensington and a high density of listed buildings mean a full planning application, and often listed-building consent for internal as well as external changes, is usually required even for modest works. The borough's basements policy is nationally known for restricting new basements, generally to a single storey, and controlling excavation extent alongside a basement impact assessment. A basement or extension can still be viable, but every scheme in Holland Park, Earl's Court or World's End must be designed to policy from the outset.

We prepare Kensington & Chelsea planning and listed-building submissions that respond to the borough's townscape and its restrictive basement and conservation policies, confirming the exact designations and listing status for your address before any design begins. You get a fixed fee agreed up front, the same council-accepted drawings an architect would produce for usually around 30% less, a roughly seven-day drawing turnaround and free redraws until the council approves. Most householder applications are determined within the statutory eight weeks once validated, though listed-building and basement cases attract more consultation, so a validation-first approach matters.

Stucco-fronted townhouses in Notting Hill, characteristic of the Royal Borough of Kensington and Chelsea
Isometric illustration of a Kensington & Chelsea home extension design
Proposed floor plan
Kensington & Chelsea

Planning in Kensington & Chelsea: what to know before you apply

In Kensington & Chelsea, permitted development can rarely be assumed: near-comprehensive conservation-area coverage and a high density of listed buildings mean a full planning application — and often listed-building consent — is usually required even for modest works. The borough's basements policy generally limits new basements to a single storey and controls their extent. We confirm every constraint up front.

Typical Kensington & Chelsea housing stock

Grand stucco-fronted Victorian townhouses, garden-square terraces, red-brick mansion blocks and cobbled mews houses — a very high proportion of which are listed or sit within conservation areas.

Areas we regularly draw for in Kensington & Chelsea

Kensington · Chelsea · Notting Hill · Holland Park · Earl's Court · South Kensington · World's End

What the numbers say about Kensington & Chelsea planning decisions

These are Royal Borough of Kensington and Chelsea’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

Householder decisions in Kensington & Chelsea

Every householder application Royal Borough of Kensington and Chelsea decided over the four quarters to 2026 Q1.

Householder applications decided574
Granted541
Refused33
GrantedEngland average 90%94%
Of which prior approvalsPrior approvals are granted far more often than full applications, so this share moves the rate above41%
Decided within 8 weeksExcludes prior approvals. England average 93%97%

Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

Permitted development in Kensington & Chelsea

Larger householder extensions put to Royal Borough of Kensington and Chelsea under the prior-approval route, and lawful-development certificates decided, over eight quarters.

Prior approval not requiredWent ahead without a full application0
Prior approval granted0
Prior approval refused0
Building upwards, prior approval refused0
Certificates of lawful development decided80

Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

Designated areas in Kensington & Chelsea

Conservation areas Royal Borough of Kensington and Chelsea has published to the national register, and when it designated them. Where a borough has supplied no Article 4 data the row is omitted rather than shown as zero.

Conservation areas on the register41
First designatedOf the 41 whose designation date the register records1,968
Most recent designation2,019
Article 4 directions in force84

Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.

If Royal Borough of Kensington and Chelsea refuses: appeal outcomes

Planning appeals against Royal Borough of Kensington and Chelsea determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.

Appeals determined407
Allowed178
Dismissed229
Householder appeals allowedFrom 188 householder appeals. England average 36%43%

Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.

Planning Drawings for Kensington & Chelsea homes: the package and the process

A planning set is judged as a set, not as individual sheets. Every existing drawing needs its proposed counterpart at the same scale and orientation so the officer can read the change at a glance, each sheet needs its own number, title, scale bar and north point, and the whole package needs to survive being printed at A3 without a dimension becoming illegible.

We draw to the conventions validation teams expect: plans and elevations at 1:100 or 1:50, a location plan at 1:1250 with the site edged red, a block plan at 1:500, and sections cut where the change in level or roof form actually happens rather than where they are easiest to draw.

The drawing list itself changes with the building. A detached house needs four elevations; a mid-terrace needs two plus a section through the party walls to show what is not visible from outside. Getting that list right at the start is what stops a validation officer asking for a sheet three weeks in.

What is included in a planning drawing set?

A council will only validate an application that contains the right drawings at the right scale. Our standard planning set covers everything a London validation team expects.

  • Site location plan (1:1250) and block plan (1:500)
  • Existing floor plans, elevations and sections
  • Proposed floor plans, elevations and sections
  • Roof plans where relevant, with heights and materials annotated
  • A design and access or heritage statement where the borough requires one

How are planning drawings different from building regulations drawings?

Planning drawings show what the building will look like and how it sits in its context. Building regulations drawings show how it will be built safely — structure, insulation, fire escape and drainage. Most projects need both; our Complete package covers the two together with structural calculations coordinated in-house.

How quickly can you produce planning drawings in London?

After a laser survey, a standard householder set is typically ready within 7 days. We review every drawing against your borough's validation checklist before it reaches a planner's desk, which is why our first-time approval rate sits around 96%.

What a London planning drawing set contains
DrawingTypical scaleWhat it shows
Site location plan1:1250The property in its street context, site edged red
Block plan1:500The building's footprint and position in the plot
Floor plans (existing & proposed)1:100 / 1:50Room layout, walls, openings and the proposed changes
Elevations (existing & proposed)1:100 / 1:50Each face of the building and how it changes
Sections1:100 / 1:50A cut through showing heights, levels and roof form
Sheet from a planning drawings package prepared for a Kensington & Chelsea property, drawn to Royal Borough of Kensington and Chelsea validation standards
A sheet from the planning drawings package we submit to Royal Borough of Kensington and Chelsea.
FAQ

Planning Drawings in Kensington & Chelsea — FAQs

What scale should London planning drawings be?+
Site location plans are 1:1250, block plans 1:500, and floor plans, elevations and sections are typically 1:100 or 1:50. We format every drawing to your specific borough's requirements.
Do I need an architect to produce planning drawings?+
No. MCIAT-chartered architectural technologists produce the same council-accepted planning drawings with the same professional accountability, and councils assess the drawings, not the author's job title.
How many revisions are included in the fee?+
All of them. The fee is fixed and we redraw free until your council approves — revisions requested by a planning officer never cost you extra.
Can you draw from my existing plans?+
We can work from existing measured drawings, but for accuracy we usually carry out a laser survey so the proposed set matches your property exactly.
Do planning drawings guarantee approval?+
No drawing can guarantee a decision, but drawing to the local plan and validation checklist maximises your odds — and we redraw free until approval.
Do I need planning permission for works in Kensington & Chelsea?+
Almost always. Near-comprehensive conservation-area coverage and a high density of listed buildings mean a full planning application — and often listed-building consent — is usually required even for modest works. Permitted development can rarely be assumed here. We confirm the exact designations and listing status for your address before any design begins.
Can I build a basement in Kensington & Chelsea?+
Within limits. The borough's basements policy is nationally known for restricting new basements — generally to a single storey — and controlling excavation extent, alongside a basement impact assessment. A basement can still be viable, but it must be designed to the policy from the outset. We confirm what your site allows and evidence the scheme accordingly.
My home is listed — what consent do I need?+
Listed-building consent is usually required alongside or instead of planning permission, and internal as well as external changes can be controlled. Given the borough's extensive listed-building coverage across Kensington, Chelsea and the mews, we screen listing status first and prepare the heritage-led drawings and justification the council expects.
How long does the Royal Borough take to decide?+
The council determines most householder applications within the statutory eight-week period once validated, though listed-building, basement and conservation cases frequently attract additional consultation. We prepare submissions to the borough's exacting validation and design standards to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Kensington & Chelsea?+
We agree a fixed fee before starting, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until the council approves. Heritage-led and listed-building schemes require more evidence than a standard extension, so we quote once we understand your address and scheme rather than by the hour.
Free Fixed Quote

Get your free Kensington & Chelsea planning assessment

Tell us your Kensington & Chelsea address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.