MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in Kensington & Chelsea

Stucco-fronted townhouses in Notting Hill, characteristic of the Royal Borough of Kensington and Chelsea
Kensington & Chelsea · London

Planning Permission in Kensington & Chelsea

Fixed-fee, MCIAT-chartered planning permission for Kensington & Chelsea homeowners — Royal Borough of Kensington and Chelsea validation and local constraints handled from the start.

Free Kensington & Chelsea planning assessment

Tell us your Kensington & Chelsea address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

The Royal Borough of Kensington and Chelsea is one of the most design-controlled authorities in the country: a very high proportion of its grand stucco-fronted townhouses, garden-square terraces, red-brick mansion blocks and cobbled mews houses are listed or sit within conservation areas. Designations such as Kensington, Chelsea, Ladbroke (Notting Hill), Holland Park, Brompton and Earl's Court Square carry detailed material and elevation control, so applications succeed on the strength of precise, heritage-led drawings rather than standard templates.

Permitted development can rarely be assumed here. Near-comprehensive conservation-area coverage across Kensington, Chelsea, Notting Hill and South Kensington and a high density of listed buildings mean a full planning application, and often listed-building consent for internal as well as external changes, is usually required even for modest works. The borough's basements policy is nationally known for restricting new basements, generally to a single storey, and controlling excavation extent alongside a basement impact assessment. A basement or extension can still be viable, but every scheme in Holland Park, Earl's Court or World's End must be designed to policy from the outset.

We prepare Kensington & Chelsea planning and listed-building submissions that respond to the borough's townscape and its restrictive basement and conservation policies, confirming the exact designations and listing status for your address before any design begins. You get a fixed fee agreed up front, the same council-accepted drawings an architect would produce for usually around 30% less, a roughly seven-day drawing turnaround and free redraws until the council approves. Most householder applications are determined within the statutory eight weeks once validated, though listed-building and basement cases attract more consultation, so a validation-first approach matters.

Stucco-fronted townhouses in Notting Hill, characteristic of the Royal Borough of Kensington and Chelsea
Isometric illustration of a Kensington & Chelsea home extension design
Proposed floor plan
Kensington & Chelsea

Planning in Kensington & Chelsea: what to know before you apply

In Kensington & Chelsea, permitted development can rarely be assumed: near-comprehensive conservation-area coverage and a high density of listed buildings mean a full planning application — and often listed-building consent — is usually required even for modest works. The borough's basements policy generally limits new basements to a single storey and controls their extent. We confirm every constraint up front.

Typical Kensington & Chelsea housing stock

Grand stucco-fronted Victorian townhouses, garden-square terraces, red-brick mansion blocks and cobbled mews houses — a very high proportion of which are listed or sit within conservation areas.

Areas we regularly draw for in Kensington & Chelsea

Kensington · Chelsea · Notting Hill · Holland Park · Earl's Court · South Kensington · World's End

What the numbers say about Kensington & Chelsea planning decisions

These are Royal Borough of Kensington and Chelsea’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

Householder decisions in Kensington & Chelsea

Every householder application Royal Borough of Kensington and Chelsea decided over the four quarters to 2026 Q1.

Householder applications decided574
Granted541
Refused33
GrantedEngland average 90%94%
Of which prior approvalsPrior approvals are granted far more often than full applications, so this share moves the rate above41%
Decided within 8 weeksExcludes prior approvals. England average 93%97%

Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

Permitted development in Kensington & Chelsea

Larger householder extensions put to Royal Borough of Kensington and Chelsea under the prior-approval route, and lawful-development certificates decided, over eight quarters.

Prior approval not requiredWent ahead without a full application0
Prior approval granted0
Prior approval refused0
Building upwards, prior approval refused0
Certificates of lawful development decided80

Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

Designated areas in Kensington & Chelsea

Conservation areas Royal Borough of Kensington and Chelsea has published to the national register, and when it designated them. Where a borough has supplied no Article 4 data the row is omitted rather than shown as zero.

Conservation areas on the register41
First designatedOf the 41 whose designation date the register records1,968
Most recent designation2,019
Article 4 directions in force84

Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.

If Royal Borough of Kensington and Chelsea refuses: appeal outcomes

Planning appeals against Royal Borough of Kensington and Chelsea determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.

Appeals determined407
Allowed178
Dismissed229
Householder appeals allowedFrom 188 householder appeals. England average 36%43%

Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.

Planning Permission for Kensington & Chelsea homes: the package and the process

A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.

Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.

Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

How long does planning permission take, and what does it cost?

Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
Sheet from a planning permission package prepared for a Kensington & Chelsea property, drawn to Royal Borough of Kensington and Chelsea validation standards
A sheet from the planning permission package we submit to Royal Borough of Kensington and Chelsea.
FAQ

Planning Permission in Kensington & Chelsea — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for works in Kensington & Chelsea?+
Almost always. Near-comprehensive conservation-area coverage and a high density of listed buildings mean a full planning application — and often listed-building consent — is usually required even for modest works. Permitted development can rarely be assumed here. We confirm the exact designations and listing status for your address before any design begins.
Can I build a basement in Kensington & Chelsea?+
Within limits. The borough's basements policy is nationally known for restricting new basements — generally to a single storey — and controlling excavation extent, alongside a basement impact assessment. A basement can still be viable, but it must be designed to the policy from the outset. We confirm what your site allows and evidence the scheme accordingly.
My home is listed — what consent do I need?+
Listed-building consent is usually required alongside or instead of planning permission, and internal as well as external changes can be controlled. Given the borough's extensive listed-building coverage across Kensington, Chelsea and the mews, we screen listing status first and prepare the heritage-led drawings and justification the council expects.
How long does the Royal Borough take to decide?+
The council determines most householder applications within the statutory eight-week period once validated, though listed-building, basement and conservation cases frequently attract additional consultation. We prepare submissions to the borough's exacting validation and design standards to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Kensington & Chelsea?+
We agree a fixed fee before starting, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until the council approves. Heritage-led and listed-building schemes require more evidence than a standard extension, so we quote once we understand your address and scheme rather than by the hour.
Free Fixed Quote

Get your free Kensington & Chelsea planning assessment

Tell us your Kensington & Chelsea address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.