
Planning Permission in Kensington & Chelsea
Fixed-fee, MCIAT-chartered planning permission for Kensington & Chelsea homeowners — Royal Borough of Kensington and Chelsea validation and local constraints handled from the start.
The Royal Borough of Kensington and Chelsea is one of the most design-controlled authorities in the country: a very high proportion of its grand stucco-fronted townhouses, garden-square terraces, red-brick mansion blocks and cobbled mews houses are listed or sit within conservation areas. Designations such as Kensington, Chelsea, Ladbroke (Notting Hill), Holland Park, Brompton and Earl's Court Square carry detailed material and elevation control, so applications succeed on the strength of precise, heritage-led drawings rather than standard templates.
Permitted development can rarely be assumed here. Near-comprehensive conservation-area coverage across Kensington, Chelsea, Notting Hill and South Kensington and a high density of listed buildings mean a full planning application, and often listed-building consent for internal as well as external changes, is usually required even for modest works. The borough's basements policy is nationally known for restricting new basements, generally to a single storey, and controlling excavation extent alongside a basement impact assessment. A basement or extension can still be viable, but every scheme in Holland Park, Earl's Court or World's End must be designed to policy from the outset.
We prepare Kensington & Chelsea planning and listed-building submissions that respond to the borough's townscape and its restrictive basement and conservation policies, confirming the exact designations and listing status for your address before any design begins. You get a fixed fee agreed up front, the same council-accepted drawings an architect would produce for usually around 30% less, a roughly seven-day drawing turnaround and free redraws until the council approves. Most householder applications are determined within the statutory eight weeks once validated, though listed-building and basement cases attract more consultation, so a validation-first approach matters.


Planning in Kensington & Chelsea: what to know before you apply
In Kensington & Chelsea, permitted development can rarely be assumed: near-comprehensive conservation-area coverage and a high density of listed buildings mean a full planning application — and often listed-building consent — is usually required even for modest works. The borough's basements policy generally limits new basements to a single storey and controls their extent. We confirm every constraint up front.
Typical Kensington & Chelsea housing stock
Grand stucco-fronted Victorian townhouses, garden-square terraces, red-brick mansion blocks and cobbled mews houses — a very high proportion of which are listed or sit within conservation areas.
Areas we regularly draw for in Kensington & Chelsea
Kensington · Chelsea · Notting Hill · Holland Park · Earl's Court · South Kensington · World's End
What the numbers say about Kensington & Chelsea planning decisions
These are Royal Borough of Kensington and Chelsea’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.
Householder decisions in Kensington & Chelsea
Every householder application Royal Borough of Kensington and Chelsea decided over the four quarters to 2026 Q1.
| Householder applications decided | 574 |
|---|---|
| Granted | 541 |
| Refused | 33 |
| GrantedEngland average 90% | 94% |
| Of which prior approvalsPrior approvals are granted far more often than full applications, so this share moves the rate above | 41% |
| Decided within 8 weeksExcludes prior approvals. England average 93% | 97% |
Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.
Permitted development in Kensington & Chelsea
Larger householder extensions put to Royal Borough of Kensington and Chelsea under the prior-approval route, and lawful-development certificates decided, over eight quarters.
| Prior approval not requiredWent ahead without a full application | 0 |
|---|---|
| Prior approval granted | 0 |
| Prior approval refused | 0 |
| Building upwards, prior approval refused | 0 |
| Certificates of lawful development decided | 80 |
Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.
Designated areas in Kensington & Chelsea
Conservation areas Royal Borough of Kensington and Chelsea has published to the national register, and when it designated them. Where a borough has supplied no Article 4 data the row is omitted rather than shown as zero.
| Conservation areas on the register | 41 |
|---|---|
| First designatedOf the 41 whose designation date the register records | 1,968 |
| Most recent designation | 2,019 |
| Article 4 directions in force | 84 |
Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.
If Royal Borough of Kensington and Chelsea refuses: appeal outcomes
Planning appeals against Royal Borough of Kensington and Chelsea determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.
| Appeals determined | 407 |
|---|---|
| Allowed | 178 |
| Dismissed | 229 |
| Householder appeals allowedFrom 188 householder appeals. England average 36% | 43% |
Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.
Planning Permission for Kensington & Chelsea homes: the package and the process
A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.
Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.
Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
How long does planning permission take, and what does it cost?
Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |

Planning Permission across Kensington & Chelsea
Planning Permission in Kensington & Chelsea — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for works in Kensington & Chelsea?+
Can I build a basement in Kensington & Chelsea?+
My home is listed — what consent do I need?+
How long does the Royal Borough take to decide?+
How much do planning drawings cost in Kensington & Chelsea?+
Get your free Kensington & Chelsea planning assessment
Tell us your Kensington & Chelsea address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.