MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportNew Build Drawings in Kensington & Chelsea

Stucco-fronted townhouses in Notting Hill, characteristic of the Royal Borough of Kensington and Chelsea
Kensington & Chelsea · London

New Build Drawings in Kensington & Chelsea

Fixed-fee, MCIAT-chartered new build drawings for Kensington & Chelsea homeowners — Royal Borough of Kensington and Chelsea validation and local constraints handled from the start.

Free Kensington & Chelsea planning assessment

Tell us your Kensington & Chelsea address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

The Royal Borough of Kensington and Chelsea is one of the most design-controlled authorities in the country: a very high proportion of its grand stucco-fronted townhouses, garden-square terraces, red-brick mansion blocks and cobbled mews houses are listed or sit within conservation areas. Designations such as Kensington, Chelsea, Ladbroke (Notting Hill), Holland Park, Brompton and Earl's Court Square carry detailed material and elevation control, so applications succeed on the strength of precise, heritage-led drawings rather than standard templates.

Permitted development can rarely be assumed here. Near-comprehensive conservation-area coverage across Kensington, Chelsea, Notting Hill and South Kensington and a high density of listed buildings mean a full planning application, and often listed-building consent for internal as well as external changes, is usually required even for modest works. The borough's basements policy is nationally known for restricting new basements, generally to a single storey, and controlling excavation extent alongside a basement impact assessment. A basement or extension can still be viable, but every scheme in Holland Park, Earl's Court or World's End must be designed to policy from the outset.

We prepare Kensington & Chelsea planning and listed-building submissions that respond to the borough's townscape and its restrictive basement and conservation policies, confirming the exact designations and listing status for your address before any design begins. You get a fixed fee agreed up front, the same council-accepted drawings an architect would produce for usually around 30% less, a roughly seven-day drawing turnaround and free redraws until the council approves. Most householder applications are determined within the statutory eight weeks once validated, though listed-building and basement cases attract more consultation, so a validation-first approach matters.

Stucco-fronted townhouses in Notting Hill, characteristic of the Royal Borough of Kensington and Chelsea
Isometric illustration of a Kensington & Chelsea home extension design
Proposed floor plan
Kensington & Chelsea

Planning in Kensington & Chelsea: what to know before you apply

In Kensington & Chelsea, permitted development can rarely be assumed: near-comprehensive conservation-area coverage and a high density of listed buildings mean a full planning application — and often listed-building consent — is usually required even for modest works. The borough's basements policy generally limits new basements to a single storey and controls their extent. We confirm every constraint up front.

Typical Kensington & Chelsea housing stock

Grand stucco-fronted Victorian townhouses, garden-square terraces, red-brick mansion blocks and cobbled mews houses — a very high proportion of which are listed or sit within conservation areas.

Areas we regularly draw for in Kensington & Chelsea

Kensington · Chelsea · Notting Hill · Holland Park · Earl's Court · South Kensington · World's End

What the numbers say about Kensington & Chelsea planning decisions

These are Royal Borough of Kensington and Chelsea’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

All development decided in Kensington & Chelsea

Every planning application Royal Borough of Kensington and Chelsea decided over the four quarters to 2026 Q1, not only householder work — a new dwelling is decided in this wider pool.

Applications decided1,960
Granted1,819
Refused141
GrantedAcross all development types, so it is not comparable with the householder rate93%
Householder applications within itThe rest is the pool a new dwelling is decided in574

Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

If Royal Borough of Kensington and Chelsea refuses: appeal outcomes

Planning appeals against Royal Borough of Kensington and Chelsea determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.

Appeals determined407
Allowed178
Dismissed229
Householder appeals allowedFrom 188 householder appeals. England average 36%43%

Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.

New Build Drawings for Kensington & Chelsea homes: the package and the process

A new dwelling is a full application rather than a householder one, and the drawing set reflects that: site layout with levels and boundaries, floor plans and elevations for the new building, sections showing how it sits in the ground, and street-scene elevations placing it against what is already there.

Two packages follow the approval — the planning set and the construction set — and they have to stay in step. Foundation design, drainage strategy, thermal performance and fire strategy are drawn for Building Control against the same geometry that was granted permission, so the built house matches the approved one.

An infill plot is designed against its neighbours. Plot width, the building line either side, and the ridge heights next door set what the new house can be — and on a tight urban site those constraints usually shape the design more than the brief does.

Is my plot suitable for a new build in London?

A feasibility assessment looks at plot size and shape, access, existing boundary conditions, relevant planning policy for the borough, and the likely impact of a new dwelling on neighbouring properties before any design work begins. Infill plots — a gap between existing buildings on a street — and backland plots — a garden or yard site behind existing houses, reached by a shared access — each raise different issues: infill schemes are usually judged on how well they match the scale, spacing and character of the street, while backland schemes are judged heavily on overlooking, garden loss for neighbours, and whether the access arrangement is acceptable. A feasibility study gives an honest view of whether a scheme is likely to succeed before you commit to full drawings.

What does pre-application advice add to a new build project?

Pre-application advice is a formal, paid process most London boroughs offer, where planning officers give written feedback on a proposed scheme before a full application is submitted. For a new build — where the principle of development itself is often the main issue, not just the design details — this feedback can be invaluable: it surfaces concerns around density, massing, daylight and sunlight or heritage context early enough to be addressed in the drawings, rather than discovered for the first time as a refusal reason months into a full application. We prepare and submit pre-application enquiries as part of the new build service where it is likely to strengthen the eventual planning application.

How do daylight, sunlight and overlooking affect a new build design?

London boroughs assess new dwellings against their effect on the daylight and sunlight reaching neighbouring homes and gardens, commonly using the 45-degree rule as an initial check on a proposal's massing and position relative to neighbouring windows, alongside more detailed daylight and sunlight assessment on sensitive sites. Overlooking and loss of privacy from new windows, upper floors or roof terraces are assessed similarly, and often shape decisions on window placement, floor-to-floor heights and the overall footprint and massing of the new building. Designing with these constraints from the earliest sketch stage, rather than adjusting for them after a refusal, is one of the main advantages of instructing feasibility and pre-application work before a full planning set.

New build project stages
StageWhat it establishesTypical fee guide
FeasibilityWhether the plot can support a new dwelling and the likely constraintsQuoted individually, from within the £2,500 new build fee
Pre-application adviceWritten borough feedback on the scheme before a full applicationQuoted individually alongside the planning fee
Full planning drawingsThe complete drawing set submitted for planning permissionFrom £2,500
Building regs and structuralConstruction-ready drawings and calculations for buildingFrom £2,200–£3,850, quoted once planning is settled
Sheet from a new build drawings package prepared for a Kensington & Chelsea property, drawn to Royal Borough of Kensington and Chelsea validation standards
A sheet from the new build drawings package we submit to Royal Borough of Kensington and Chelsea.
FAQ

New Build Drawings in Kensington & Chelsea — FAQs

How much do new build drawings cost in London?+
New build drawings start from £2,500 for feasibility and a full planning drawing set on a straightforward infill or backland plot, with building regulations and structural drawings quoted separately once the planning design is agreed.
Can any garden or backland plot be built on in London?+
Not necessarily — backland and garden plots are assessed on access, overlooking, loss of garden amenity for neighbours and borough policy, and a feasibility assessment gives an honest early view of whether a scheme is likely to be supported.
Do I need pre-application advice before a full new build application?+
It is not mandatory, but for a new dwelling — where the principle of development is often the main issue — pre-application advice can surface concerns early enough to address them in the design, reducing the risk of refusal.
Do you handle building regulations and structural drawings for a new build, or only planning?+
Both — the full new build service covers planning, building regulations and structural drawings from one in-house team, so the design stays consistent from feasibility through to construction-ready drawings.
How long does a new build project take from feasibility to planning permission?+
This varies with site complexity and whether pre-application advice is sought, but a full planning application is determined within the statutory period the borough applies to the application type, once submitted via the Planning Portal.
Do I need planning permission for works in Kensington & Chelsea?+
Almost always. Near-comprehensive conservation-area coverage and a high density of listed buildings mean a full planning application — and often listed-building consent — is usually required even for modest works. Permitted development can rarely be assumed here. We confirm the exact designations and listing status for your address before any design begins.
Can I build a basement in Kensington & Chelsea?+
Within limits. The borough's basements policy is nationally known for restricting new basements — generally to a single storey — and controlling excavation extent, alongside a basement impact assessment. A basement can still be viable, but it must be designed to the policy from the outset. We confirm what your site allows and evidence the scheme accordingly.
My home is listed — what consent do I need?+
Listed-building consent is usually required alongside or instead of planning permission, and internal as well as external changes can be controlled. Given the borough's extensive listed-building coverage across Kensington, Chelsea and the mews, we screen listing status first and prepare the heritage-led drawings and justification the council expects.
How long does the Royal Borough take to decide?+
The council determines most householder applications within the statutory eight-week period once validated, though listed-building, basement and conservation cases frequently attract additional consultation. We prepare submissions to the borough's exacting validation and design standards to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Kensington & Chelsea?+
We agree a fixed fee before starting, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until the council approves. Heritage-led and listed-building schemes require more evidence than a standard extension, so we quote once we understand your address and scheme rather than by the hour.
Free Fixed Quote

Get your free Kensington & Chelsea planning assessment

Tell us your Kensington & Chelsea address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.