
House Extension Drawings in Camden
Fixed-fee, MCIAT-chartered house extension drawings for Camden homeowners — London Borough of Camden validation and local constraints handled from the start.
Camden is one of London's most heritage-dense and design-scrutinised boroughs: much of its housing sits within conservation areas such as Hampstead, Belsize, Primrose Hill, Fitzroy Square, Bloomsbury and Dartmouth Park, or is listed outright, and the council applies detailed control to rear extensions, dormers, materials and — above all — basements. The stock ranges from Georgian and early-Victorian townhouses and stucco-fronted terraces to Hampstead's Arts-and-Crafts housing, mansion blocks and the Victorian terraces of Kentish Town and Gospel Oak. In Hampstead, Belsize Park and Primrose Hill especially, applications reward drawings that respond precisely to the local townscape rather than a standard template.
Because near-borough-wide conservation coverage sits alongside a high density of listed buildings in Hampstead, Bloomsbury and Fitzrovia, permitted development cannot be assumed for roof alterations, front elevations or many rear works — a full householder application, and often listed-building consent, is usually needed. Camden also operates one of the most rigorous basement policies in London: any basement or lower-ground extension generally requires a Basement Impact Assessment addressing structural stability, drainage and groundwater. We take a validation-first approach, screening the conservation-area, listing and basement position for your exact address before a line is drawn, and coordinating the Basement Impact Assessment where a below-ground scheme is involved.
We prepare Camden planning and listed-building submissions to the council's validation and design standards across Camden Town, Kentish Town, West Hampstead and the wider borough, producing the same council-accepted drawings an architect would — usually at around 30% less. The fee is agreed up front and fixed, drawings typically turn around in about seven days, and we redraw free until Camden approves. Most householder applications are determined within the statutory eight-week period once validated, though basement, conservation and listed-building cases can attract additional consultation, so a complete, correctly scaled submission is the best defence against delay.


Planning in Camden: what to know before you apply
Camden operates one of the most rigorous basement policies in London: schemes involving a basement or lower-ground extension generally require a Basement Impact Assessment addressing structural stability, drainage and groundwater. Add near-borough-wide conservation coverage and a high proportion of listed buildings, and permitted development cannot be assumed — we confirm the exact constraints before drawing.
Typical Camden housing stock
Georgian and early-Victorian townhouses, Hampstead's historic and Arts-and-Crafts housing, stucco-fronted terraces and mansion blocks, and Victorian terraces across Kentish Town and Gospel Oak.
Areas we regularly draw for in Camden
Hampstead · Camden Town · Kentish Town · Belsize Park · Primrose Hill · Bloomsbury · Gospel Oak · West Hampstead
What the numbers say about Camden planning decisions
These are London Borough of Camden’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.
Permitted development in Camden
Larger householder extensions put to London Borough of Camden under the prior-approval route, and lawful-development certificates decided, over eight quarters.
| Prior approval not requiredWent ahead without a full application | 1 |
|---|---|
| Prior approval granted | 6 |
| Prior approval refused | 1 |
| Building upwards, prior approval refused | 0 |
| Certificates of lawful development decided | 247 |
Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.
What removes permitted development in Camden
Live entries on the national planning registers for London Borough of Camden. Article 4 directions withdraw permitted development rights, so a project inside one needs a full application rather than prior approval. Revoked and expired entries are excluded.
| Article 4 directions in force | 21 |
|---|---|
| Areas they coverOne direction can cover many separate areas | 21 |
| Conservation areasPermitted development is already narrower inside one | 40 |
Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.
House Extension Drawings for Camden homes: the package and the process
Extension drawings are read for their dimensions. The proposed plan needs depth measured from the original rear wall — not from a previous extension — eaves and ridge heights taken from existing ground level, and the distance to each boundary marked. A site plan showing how much garden remains is what an officer reaches for when the amenity question comes up.
We draw the existing building accurately first, because everything else is measured from it. Where the original footprint has already been added to, that history goes on the drawing: it decides which allowances are still available and it is the first thing an officer checks against the council's own records.
The plot decides the extension type long before taste does. A mid-terrace has depth to work with and an alley if it is lucky; a semi has one clear flank; a detached house can go wide. Reading the building form first is what stops a design being drawn that the plot cannot take.
Which extension types do you draw?
Every London extension is shaped by the plot, the neighbours and the borough's design guidance. We draw them all.
Rear extension
A single-storey rear extension is often permitted development within depth limits — ideal for an open-plan kitchen-diner.
Side-return
Fills the alley beside a Victorian terrace, widening the ground floor without losing garden.
Wraparound
Combines a rear and side-return extension for a transformative ground floor, usually needing planning permission.
Double-storey
Adds space above and below, subject to tighter scale and neighbour-impact scrutiny.
Basement
Creates space downward where footprint is limited, with structural and party-wall care.
Do I need planning permission for a house extension in London?
Single-storey rear extensions within permitted development limits (up to 6m for terraced/semi-detached homes under the larger-home scheme, subject to neighbour consultation) may not need a full application. Wraparounds, double-storeys and anything in a conservation area usually do. We assess your plot and recommend the right route before drawing. The current depth, height and eaves limits are set out in full in the guide to planning permission for a rear extension, and where you would rather one practice ran the design, the application and the building-regulations stage together, Architectural Drawings covers that full scope.
How do you maximise the footprint the council will approve?
We know each borough's depth, height and daylight standards, so we design to the edge of what will be approved rather than guessing — and we check the 45-degree neighbour daylight rule and any rear building line before submission. Where a plot is tight we test a permitted-development scheme against a slightly larger householder application and show you the trade-off in space, cost and timescale, so the drawn scheme is the one that actually maximises value rather than just floor area.
| Extension | Typical route | Package | Fee from |
|---|---|---|---|
| Single-storey rear | Permitted development / householder | Planning + building regs | £1,100 |
| Side-return | Householder planning | Planning + building regs + structural | £1,600 |
| Wraparound | Householder planning | Full package + structural | £2,200 |
| Double-storey | Householder planning | Full package + structural | £2,400 |

House Extension Drawings across Camden
House Extension Drawings in Camden — FAQs
How far can I extend without planning permission in London?+
Do extension drawings include structural calculations?+
How long do extension drawings take?+
Will my rear extension need a party wall agreement?+
Can I extend a house in a conservation area?+
Do I need planning permission for a rear extension in Camden?+
What is a Basement Impact Assessment and will I need one in Camden?+
Can I make changes to a listed building in Camden?+
How long does Camden take to decide an application?+
How much do planning drawings cost in Camden?+
Get your free Camden planning assessment
Tell us your Camden address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.