MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex
25 Eccleston Place, Victoria, London SW1W 9NFhello@drawingsdirect.co.uk020 7864 7245WhatsApp

Free 2026 London Planning Report — Ealing Council planning guide: drawing to SPD 4 when there is no local validation list

Large Edwardian corner house in Ealing with a turret, white bay windows and new roof windows in a dark slate roof, a red post box beside it
Ealing Council Planning Guide

Ealing Council planning guide: drawing to SPD 4 when there is no local validation list

Most London councils publish a long local list of documents a householder must submit. Ealing's validation pages do not: they point to the national requirements, a design and access statement and the Community Infrastructure Levy form. What Ealing does publish is SPD 4 on residential extensions, kept as interim guidance, and that is where its depth, set-back and dormer rules sit. This guide turns SPD 4 into a drawing checklist and names the report for each trigger. Start with a planning constraints report for your address, £19.

Fixed fee from £19 · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

What Ealing's validation pages ask for

Ealing’s Applying for planning permission page lists supporting documents under three heads: the national requirements, design and access statements and the Community Infrastructure Levy. It adds that “your application will not be made valid until all the required documents are submitted”. We found no householder local list on the council’s planning pages, so treat the national requirements as the floor and ask the duty planner if a point is unclear.

The validation page says the council aims to validate within 5-10 working days. An invalid application gets a letter giving the reasons, and if the council hears nothing after 28 days it returns the application and charges a £45 administration fee. Our Ealing planning permission page covers drawings for applications in the borough.

Ealing Council Planning Guide

from £19

Every price is the full fixed fee you pay. No VAT is charged. Council application fees are paid to the council separately.

What you get

  • A plain reading of Ealing's validation pages and its SPD 4 on residential extensions
  • The depth, set-back and dormer rules in SPD 4, with the figures it gives
  • Where Ealing's development plan stands and what to check before you submit
  • Which reports your address triggers, each linked to its own fixed-fee page
  • A planning constraints report for your address from £19
  • Fixed fees shown before you ask, and no VAT charged
Drawing an extension for Ealing
  1. Check the address

    Conservation area, listing and Article 4 decide whether SPD 4's stricter rules and extra statements apply.

  2. Measure against SPD 4

    Rear depth, side set-backs and dormer positions are all given as distances you can check on the drawing.

  3. Annotate the set

    Label materials on elevations and room uses on plans, as SPD 4 asks.

  4. Add the triggered extras

    A heritage statement, tree survey or basement method statement is added only where your property needs it.

Where Ealing's development plan stands

Ealing’s New Local Plan page says the final draft was submitted to the government on 18 November 2024 and that an independent Inspector is examining it. As it stands, the page lists no adopted policies, so confirm on the day whether the plan has since been adopted before you quote it.

Until then the council’s own supplementary planning page says the Development Sites and Development Management documents adopted on 10 December 2013 replaced the older plan’s remaining saved policies. Some older guidance was kept alive as informal interim guidance, and the next section is the one that matters to a householder.

Suburban terraces and trees seen from above in evening light
Edwardian gabled houses on a residential street with spring blossom

SPD 4 says dormer windows will usually be acceptable on rear slopes and only very rarely on the front or side, and should sit at least 0.5m down from the ridge, at least 0.5m from the sides and at least 0.5m above the eaves.

Ealing SPD 4 Residential Extensions, 6.0 Roof Extensions: dormer windows should be located at least 0.5m down from the ridge, at least 0.5m from the edges of the roof and at least 0.5m above the eaves. www.ealing.gov.uk

SPD 4: the depth and set-back rules

The interim guidance list includes SPD 4, Residential extensions. The document itself still refers to the 2004 Plan for the Environment, so use it as a statement of how officers think rather than as current policy. It gives distances you can put straight onto a drawing.

For rear extensions, “a single-storey extension with a maximum depth of 3 metres and a maximum height of 3 metres will be acceptable” where the house has not been extended before and is aligned with its neighbour; a detached house, or one well separated from its neighbour, may go further. Two-storey rear extensions are called contentious and should be set back from shared boundaries.

For side extensions the front wall should be set back at least one metre at first floor and above, and in conservation areas at ground floor too. The extension should be set in at least one metre from the side boundary at first floor, to avoid a terracing effect. Two-storey side extensions are “not encouraged”, and the ridge should sit at least 0.5m below the main ridge. Our house extension drawings and rear extension drawings are set out to these figures.

Lofts and dormers

SPD 4 says dormer windows will usually be acceptable on rear slopes and only very rarely on the front or side, and should sit at least 0.5m down from the ridge, at least 0.5m from the sides and at least 0.5m above the eaves. It adds that mansard extensions that change the roof slope will not usually be acceptable, and that the ridge should not be raised for headroom.

In conservation areas it asks for traditional dormer designs in size, detailing and materials. Our dormer loft conversion drawings are set out to these distances from the start.

DrawingsDirect sample planning sheet with proposed plans and elevations at 1:100 and a site plan at 1:500
Sample drawing

Conservation areas, trees and Article 4

SPD 4 says that where a home is in a conservation area or is listed, a supporting statement may be appropriate to explain the design, and that wrap-around extensions are discouraged and will usually be refused in conservation areas. It also warns that the council may have removed permitted development rights with an Article 4 direction. Our heritage statement covers the supporting document, and a planning constraints report shows whether your address is affected.

The council’s interim guidance list also keeps SPG 9, Trees and development guidelines, and the SPD 4 site layout plan should show trees on the site and next door. If a tree stands near your extension, a tree survey for planning settles the question before drawings.

Basements

SPD 4 treats a basement as any other extension, judged on the design of the original house and its effect on neighbours and the structure. It says you need Building Regulations approval for the excavation, and that if permission is granted Ealing will require a method statement on structural and construction matters. The guide also says proposals in conservation areas will be resisted where they harm character or appearance.

The interim guidance list names no separate basements document. A basement feasibility visit comes before drawings.

London high street lined with Victorian shopfront parades and flats above

Building control and party wall

Ealing’s building control forms and charges page says a full plans decision notice is issued within five weeks, extendable to two months if agreed. A building notice suits only small domestic work and cannot be used over or within 3.0m of a public sewer. Regularisation is only an option for unauthorised work carried out after 11 November 1985. Our building regulations reports guide sorts the routes.

A shared wall brings in the Party Wall etc. Act 1996, which runs alongside planning. Our party wall services guide explains the notices.

Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
5-10 working daysEaling Council, Validation page: (source wording: "We aim to validate your application within 5-10 working days.")www.ealing.gov.uk
28 daysEaling Council, Validation page: (source wording: "If we do not hear from you after 28 days, your application will be returned"), with a £45 administration feewww.ealing.gov.uk
£45Ealing Council, Validation page: administration fee charged when an unanswered invalid application is returned after 28 dayswww.ealing.gov.uk
18 November 2024Ealing Council, New Local Plan page: (source wording: "The final draft New Local Plan was submitted to the government on 18 November 2024.") and the plan is under examination by an independent Inspectorwww.ealing.gov.uk
10 December 2013Ealing Council, Supplementary planning guidance and documents page: the Development Sites and Development Management DPDs were adopted on 10 December 2013 and superseded the remaining saved policies of the earlier planwww.ealing.gov.uk
3 metresEaling SPD 4 Residential Extensions, 5.0 Rear Extensions: (source wording: "a single-storey extension with a maximum depth of 3 metres and a maximum height of 3 metres will be acceptable")www.ealing.gov.uk
one metreEaling SPD 4 Residential Extensions, 4.0 Side Extensions: (source wording: "Side extensions should be set in at least one metre from the side boundary at first floor level.")www.ealing.gov.uk
0.5mEaling SPD 4 Residential Extensions, 6.0 Roof Extensions: dormer windows should be located at least 0.5m down from the ridge, at least 0.5m from the edges of the roof and at least 0.5m above the eaveswww.ealing.gov.uk
five weeksEaling Council, building control application forms and charges page: (source wording: "A formal decision notice will be issued (approval, conditional approval or rejection) within five weeks")www.ealing.gov.uk
11 November 1985Ealing Council, building control application forms and charges page: (source wording: "Regularisation is only an option if the unauthorised works were carried out after 11 November 1985.")www.ealing.gov.uk
Reports

Every report on this page, with its fixed fee

ReportFixed feeWhat it is
Planning constraints report£19Conservation area, listing, Article 4 and flood zone checked for your address Written up on fixedfeeplans.co.uk.
Heritage statements£595A supporting statement SPD 4 suggests for conservation areas and listed buildings Written up on fixedfeeplans.co.uk.
Tree surveys for planning£445Where trees stand on or beside the site, which Ealing's site plan must show Written up on www.propertyarchitecture.co.uk.
Basement conversion feasibility£495 drawings + £200 survey (£695 total)A visit and report before a basement that needs Ealing's method statement
Building regulations reports£225Which building regulations report fits your project
Party wall services£45Notices under the Party Wall etc. Act 1996 for terraces and semis
FAQ

Questions people ask

Does Ealing have a local validation list for householders?
We found none on its planning pages. They point to the national requirements, a design and access statement where needed and the Community Infrastructure Levy form. SPD 4 sets out the drawings it prefers.
How deep can a rear extension be in Ealing?
SPD 4 says a single-storey rear extension with a maximum depth of 3 metres and a maximum height of 3 metres will generally be acceptable where the house is unextended and aligned with its neighbour. Detached houses may go further.
Can I build a side extension up to the boundary in Ealing?
SPD 4 asks for a gap of about one metre between a side extension and the side boundary at first floor, and for the first floor to be set back from the front. Conservation areas also need the ground floor set back.
Is Ealing's new Local Plan adopted?
The council's New Local Plan page says the final draft was submitted on 18 November 2024 and was being examined. It lists no adopted policies, so check the page on the day you rely on it.
Do I need building regulations as well as planning in Ealing?
Usually yes. SPD 4 itself says a basement needs Building Regulations approval, and loft and extension work generally does too. Ealing's building control takes full plans, building notice and regularisation applications.

Photographs: Michael Dibb (CC BY-SA 2.0).