
Planning Drawings in Greenwich
Fixed-fee, MCIAT-chartered planning drawings for Greenwich homeowners — Royal Borough of Greenwich validation and local constraints handled from the start.
Greenwich stretches from the Georgian streets of West Greenwich and the Georgian-fringed heath at Blackheath — set against the Maritime Greenwich World Heritage Site — out to the Edwardian villas of Westcombe Park and the interwar and post-war suburbs of Eltham and Kidbrooke. The northern, historic core carries strong conservation and protected-view control, while the outer suburbs and newer riverside development along the Thames offer more generous plots for extensions and lofts. The right route depends heavily on where in the borough you are.
The character shifts street by street. Conservation areas at West Greenwich, Ashburnham Triangle, Blackheath, Westcombe Park, Eltham Park and Woolwich each carry design control over materials, rooflines and front elevations, and the sloping sites around Blackheath and the Greenwich hills shape what an extension can be. Protected views toward the Royal Observatory and across the river, together with Article 4 directions on HMO conversions in parts of the borough, mean the constraints on a heritage-led scheme in the historic core differ sharply from a straightforward suburban addition toward Eltham or Charlton.
We prepare Greenwich planning drawings tuned to the specific area — heritage-led applications around West Greenwich and Blackheath, and simpler extension and loft schemes toward Eltham and Kidbrooke — confirming the World Heritage Site setting and conservation designations for your address first. It is the same council-accepted drawing set an architect would prepare, usually at around 30% less, with a fixed fee agreed up front, a roughly seven-day drawing turnaround and free redraws until the Royal Borough of Greenwich approves. Most householder applications are decided within the statutory eight-week period once validated, so we draw to the council's validation checklist from the start.


Planning in Greenwich: what to know before you apply
A distinctive Greenwich consideration is the Maritime Greenwich World Heritage Site and its buffer zone, where the council protects townscape and long views toward the Royal Observatory — proposals nearby are assessed against that setting. Conservation-area control in West Greenwich, Blackheath and Westcombe Park, and Article 4 directions on HMO conversions in parts of the borough, also apply. We confirm what affects your address before drawing.
Typical Greenwich housing stock
Georgian and early-Victorian terraces around West Greenwich and Blackheath, Edwardian villas in Westcombe Park, interwar and post-war housing toward Eltham and Kidbrooke, and newer riverside development along the Thames.
Areas we regularly draw for in Greenwich
Greenwich · Blackheath · Westcombe Park · Charlton · Woolwich · Eltham · Kidbrooke
What the numbers say about Greenwich planning decisions
These are Royal Borough of Greenwich’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.
Householder decisions in Greenwich
Every householder application Royal Borough of Greenwich decided over the four quarters to 2026 Q1.
| Householder applications decided | 647 |
|---|---|
| Granted | 502 |
| Refused | 145 |
| GrantedEngland average 90% | 78% |
| Of which prior approvalsPrior approvals are granted far more often than full applications, so this share moves the rate above | 21% |
| Decided within 8 weeksExcludes prior approvals. England average 93% | 94% |
Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.
Permitted development in Greenwich
Larger householder extensions put to Royal Borough of Greenwich under the prior-approval route, and lawful-development certificates decided, over eight quarters.
| Prior approval not requiredWent ahead without a full application | 0 |
|---|---|
| Prior approval granted | 154 |
| Prior approval refused | 126 |
| Granted where a decision was neededFrom 280 determinations | 55% |
| Building upwards, prior approval refused | 0 |
| Certificates of lawful development decided | 839 |
Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.
Designated areas in Greenwich
Conservation areas Royal Borough of Greenwich has published to the national register, and when it designated them. Where a borough has supplied no Article 4 data the row is omitted rather than shown as zero.
| Conservation areas on the register | 14 |
|---|
Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.
If Royal Borough of Greenwich refuses: appeal outcomes
Planning appeals against Royal Borough of Greenwich determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.
| Appeals determined | 635 |
|---|---|
| Allowed | 237 |
| Dismissed | 398 |
| Householder appeals allowedFrom 344 householder appeals. England average 36% | 46% |
Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.
Planning Drawings for Greenwich homes: the package and the process
A planning set is judged as a set, not as individual sheets. Every existing drawing needs its proposed counterpart at the same scale and orientation so the officer can read the change at a glance, each sheet needs its own number, title, scale bar and north point, and the whole package needs to survive being printed at A3 without a dimension becoming illegible.
We draw to the conventions validation teams expect: plans and elevations at 1:100 or 1:50, a location plan at 1:1250 with the site edged red, a block plan at 1:500, and sections cut where the change in level or roof form actually happens rather than where they are easiest to draw.
The drawing list itself changes with the building. A detached house needs four elevations; a mid-terrace needs two plus a section through the party walls to show what is not visible from outside. Getting that list right at the start is what stops a validation officer asking for a sheet three weeks in.
What is included in a planning drawing set?
A council will only validate an application that contains the right drawings at the right scale. Our standard planning set covers everything a London validation team expects.
- Site location plan (1:1250) and block plan (1:500)
- Existing floor plans, elevations and sections
- Proposed floor plans, elevations and sections
- Roof plans where relevant, with heights and materials annotated
- A design and access or heritage statement where the borough requires one
How are planning drawings different from building regulations drawings?
Planning drawings show what the building will look like and how it sits in its context. Building regulations drawings show how it will be built safely — structure, insulation, fire escape and drainage. Most projects need both; our Complete package covers the two together with structural calculations coordinated in-house.
How quickly can you produce planning drawings in London?
After a laser survey, a standard householder set is typically ready within 7 days. We review every drawing against your borough's validation checklist before it reaches a planner's desk, which is why our first-time approval rate sits around 96%.
| Drawing | Typical scale | What it shows |
|---|---|---|
| Site location plan | 1:1250 | The property in its street context, site edged red |
| Block plan | 1:500 | The building's footprint and position in the plot |
| Floor plans (existing & proposed) | 1:100 / 1:50 | Room layout, walls, openings and the proposed changes |
| Elevations (existing & proposed) | 1:100 / 1:50 | Each face of the building and how it changes |
| Sections | 1:100 / 1:50 | A cut through showing heights, levels and roof form |

Planning Drawings in Greenwich — FAQs
What scale should London planning drawings be?+
Do I need an architect to produce planning drawings?+
How many revisions are included in the fee?+
Can you draw from my existing plans?+
Do planning drawings guarantee approval?+
Do I need planning permission for an extension in Greenwich?+
How does the Maritime Greenwich World Heritage Site affect my project?+
Can I extend a home in Blackheath or Westcombe Park?+
How long does the Royal Borough of Greenwich take to decide?+
How much do planning drawings cost in Greenwich?+
Get your free Greenwich planning assessment
Tell us your Greenwich address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.