MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in Greenwich

Aerial view of London rooftops and gardens across a borough like Greenwich, from historic terraces to suburban homes
Greenwich · London

Planning Permission in Greenwich

Fixed-fee, MCIAT-chartered planning permission for Greenwich homeowners — Royal Borough of Greenwich validation and local constraints handled from the start.

Free Greenwich planning assessment

Tell us your Greenwich address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Greenwich stretches from the Georgian streets of West Greenwich and the Georgian-fringed heath at Blackheath — set against the Maritime Greenwich World Heritage Site — out to the Edwardian villas of Westcombe Park and the interwar and post-war suburbs of Eltham and Kidbrooke. The northern, historic core carries strong conservation and protected-view control, while the outer suburbs and newer riverside development along the Thames offer more generous plots for extensions and lofts. The right route depends heavily on where in the borough you are.

The character shifts street by street. Conservation areas at West Greenwich, Ashburnham Triangle, Blackheath, Westcombe Park, Eltham Park and Woolwich each carry design control over materials, rooflines and front elevations, and the sloping sites around Blackheath and the Greenwich hills shape what an extension can be. Protected views toward the Royal Observatory and across the river, together with Article 4 directions on HMO conversions in parts of the borough, mean the constraints on a heritage-led scheme in the historic core differ sharply from a straightforward suburban addition toward Eltham or Charlton.

We prepare Greenwich planning drawings tuned to the specific area — heritage-led applications around West Greenwich and Blackheath, and simpler extension and loft schemes toward Eltham and Kidbrooke — confirming the World Heritage Site setting and conservation designations for your address first. It is the same council-accepted drawing set an architect would prepare, usually at around 30% less, with a fixed fee agreed up front, a roughly seven-day drawing turnaround and free redraws until the Royal Borough of Greenwich approves. Most householder applications are decided within the statutory eight-week period once validated, so we draw to the council's validation checklist from the start.

Aerial view of London rooftops and gardens across a borough like Greenwich, from historic terraces to suburban homes
Isometric illustration of a Greenwich home extension design
Proposed floor plan
Greenwich

Planning in Greenwich: what to know before you apply

A distinctive Greenwich consideration is the Maritime Greenwich World Heritage Site and its buffer zone, where the council protects townscape and long views toward the Royal Observatory — proposals nearby are assessed against that setting. Conservation-area control in West Greenwich, Blackheath and Westcombe Park, and Article 4 directions on HMO conversions in parts of the borough, also apply. We confirm what affects your address before drawing.

Typical Greenwich housing stock

Georgian and early-Victorian terraces around West Greenwich and Blackheath, Edwardian villas in Westcombe Park, interwar and post-war housing toward Eltham and Kidbrooke, and newer riverside development along the Thames.

Areas we regularly draw for in Greenwich

Greenwich · Blackheath · Westcombe Park · Charlton · Woolwich · Eltham · Kidbrooke

What the numbers say about Greenwich planning decisions

These are Royal Borough of Greenwich’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

Householder decisions in Greenwich

Every householder application Royal Borough of Greenwich decided over the four quarters to 2026 Q1.

Householder applications decided647
Granted502
Refused145
GrantedEngland average 90%78%
Of which prior approvalsPrior approvals are granted far more often than full applications, so this share moves the rate above21%
Decided within 8 weeksExcludes prior approvals. England average 93%94%

Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

Permitted development in Greenwich

Larger householder extensions put to Royal Borough of Greenwich under the prior-approval route, and lawful-development certificates decided, over eight quarters.

Prior approval not requiredWent ahead without a full application0
Prior approval granted154
Prior approval refused126
Granted where a decision was neededFrom 280 determinations55%
Building upwards, prior approval refused0
Certificates of lawful development decided839

Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

Designated areas in Greenwich

Conservation areas Royal Borough of Greenwich has published to the national register, and when it designated them. Where a borough has supplied no Article 4 data the row is omitted rather than shown as zero.

Conservation areas on the register14

Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.

If Royal Borough of Greenwich refuses: appeal outcomes

Planning appeals against Royal Borough of Greenwich determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.

Appeals determined635
Allowed237
Dismissed398
Householder appeals allowedFrom 344 householder appeals. England average 36%46%

Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.

Planning Permission for Greenwich homes: the package and the process

A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.

Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.

Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

How long does planning permission take, and what does it cost?

Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
Sheet from a planning permission package prepared for a Greenwich property, drawn to Royal Borough of Greenwich validation standards
A sheet from the planning permission package we submit to Royal Borough of Greenwich.
FAQ

Planning Permission in Greenwich — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for an extension in Greenwich?+
It depends on the area. The interwar and post-war suburbs toward Eltham and Kidbrooke often retain permitted development rights for rear extensions and lofts, while the historic core around West Greenwich and Blackheath sits within conservation areas where those rights are removed. We check your address against the designations first and can confirm permitted development with a Lawful Development Certificate.
How does the Maritime Greenwich World Heritage Site affect my project?+
Proposals within the World Heritage Site or its buffer zone are assessed against the setting of Maritime Greenwich, where the council protects townscape and long views toward the Royal Observatory. It doesn't rule out an extension, but roof-level and prominent works near the site need careful, context-led design. We confirm whether the setting applies to your address before drawing.
Can I extend a home in Blackheath or Westcombe Park?+
Yes, but these conservation areas carry strong design control over materials, rooflines and front elevations, and sloping sites around Blackheath and the Greenwich hills shape what works. We design context-led drawings that respond to the area's Georgian and Edwardian character and the topography, which is what carries applications to consent here.
How long does the Royal Borough of Greenwich take to decide?+
Greenwich determines most householder applications within the statutory eight-week period once validated; World Heritage Site, conservation and protected-view cases can involve additional consultation. We prepare submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Greenwich?+
We agree a fixed fee before starting, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Greenwich approves. A suburban Eltham extension and a West Greenwich heritage application differ in the evidence required, so we quote once we understand your address and project rather than by the hour.
Free Fixed Quote

Get your free Greenwich planning assessment

Tell us your Greenwich address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.