
New Build Drawings in Hackney Wick E9
Fixed-fee, MCIAT-chartered new build drawings for Hackney Wick (E9) homeowners — London Borough of Hackney validation and local constraints handled from the start.
Hackney Wick sits between the River Lea and the Olympic Park, a former industrial and warehouse quarter now full of live-work conversions, studios and new-build regeneration. The projects here are warehouse-to-residential and live-work conversions, roof-level additions and internal reconfiguration, with distinctive brick industrial fabric shaping what can be altered and how.
The Hackney Wick and Fish Island conservation areas protect that character, and canal-side flood risk adds a further layer to scheme design. We prepare Hackney Wick drawings to the London Borough of Hackney's conservation, flood-risk and change-of-use standards, coordinating planning and building-regulation detail so conversions and roof schemes are approved without repeated redraws.


Planning in Hackney Wick (E9): what to know before you apply
No published householder Article 4 direction governs Hackney Wick, but the Hackney Wick and Fish Island conservation areas, flood-risk designation and change-of-use policy mean most warehouse-conversion, live-work and roof-addition schemes need full planning permission with heritage, flood and amenity justification.
Typical Hackney Wick housing stock
Hackney Wick by the River Lea and the Olympic Park is a former industrial and warehouse zone now defined by live-work conversions, artist studios and dense new-build regeneration. The work here is warehouse-to-residential and live-work conversion, roof-level additions and internal reconfiguration, rather than the traditional garden extension found in the surrounding terraced suburbs.
Streets we regularly draw for in Hackney Wick
Wick Lane · Berkshire Road · Christie Road · Annis Road
What E9 is actually built of
Measured from 397 classified residential buildings in E9, not from a description of the area.
Hackney Wick E9 housing mix
Residential building form across the E9 postcode district, from 397 classified buildings.
| Attached on more than one side | 75% |
|---|---|
| Attached on one side | 20% |
| Detached | 5% |
| Median building footprint | 54 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 2.76 |
| Buildings classified | 397 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
New Build Drawings for Hackney Wick (E9) homes: the package and the process
A new dwelling is a full application rather than a householder one, and the drawing set reflects that: site layout with levels and boundaries, floor plans and elevations for the new building, sections showing how it sits in the ground, and street-scene elevations placing it against what is already there.
Two packages follow the approval — the planning set and the construction set — and they have to stay in step. Foundation design, drainage strategy, thermal performance and fire strategy are drawn for Building Control against the same geometry that was granted permission, so the built house matches the approved one.
An infill plot is designed against its neighbours. Plot width, the building line either side, and the ridge heights next door set what the new house can be — and on a tight urban site those constraints usually shape the design more than the brief does.
Is my plot suitable for a new build in London?
A feasibility assessment looks at plot size and shape, access, existing boundary conditions, relevant planning policy for the borough, and the likely impact of a new dwelling on neighbouring properties before any design work begins. Infill plots — a gap between existing buildings on a street — and backland plots — a garden or yard site behind existing houses, reached by a shared access — each raise different issues: infill schemes are usually judged on how well they match the scale, spacing and character of the street, while backland schemes are judged heavily on overlooking, garden loss for neighbours, and whether the access arrangement is acceptable. A feasibility study gives an honest view of whether a scheme is likely to succeed before you commit to full drawings.
What does pre-application advice add to a new build project?
Pre-application advice is a formal, paid process most London boroughs offer, where planning officers give written feedback on a proposed scheme before a full application is submitted. For a new build — where the principle of development itself is often the main issue, not just the design details — this feedback can be invaluable: it surfaces concerns around density, massing, daylight and sunlight or heritage context early enough to be addressed in the drawings, rather than discovered for the first time as a refusal reason months into a full application. We prepare and submit pre-application enquiries as part of the new build service where it is likely to strengthen the eventual planning application.
How do daylight, sunlight and overlooking affect a new build design?
London boroughs assess new dwellings against their effect on the daylight and sunlight reaching neighbouring homes and gardens, commonly using the 45-degree rule as an initial check on a proposal's massing and position relative to neighbouring windows, alongside more detailed daylight and sunlight assessment on sensitive sites. Overlooking and loss of privacy from new windows, upper floors or roof terraces are assessed similarly, and often shape decisions on window placement, floor-to-floor heights and the overall footprint and massing of the new building. Designing with these constraints from the earliest sketch stage, rather than adjusting for them after a refusal, is one of the main advantages of instructing feasibility and pre-application work before a full planning set.
| Stage | What it establishes | Typical fee guide |
|---|---|---|
| Feasibility | Whether the plot can support a new dwelling and the likely constraints | Quoted individually, from within the £2,500 new build fee |
| Pre-application advice | Written borough feedback on the scheme before a full application | Quoted individually alongside the planning fee |
| Full planning drawings | The complete drawing set submitted for planning permission | From £2,500 |
| Building regs and structural | Construction-ready drawings and calculations for building | From £2,200–£3,850, quoted once planning is settled |

New Build Drawings in Hackney Wick E9 — FAQs
How much do new build drawings cost in London?+
Can any garden or backland plot be built on in London?+
Do I need pre-application advice before a full new build application?+
Do you handle building regulations and structural drawings for a new build, or only planning?+
How long does a new build project take from feasibility to planning permission?+
Do I need planning permission for an extension in Hackney?+
My Hackney property is a converted flat — can I still extend?+
What does Hackney's borough-wide HMO Article 4 direction cover?+
How long does Hackney Council take to decide?+
How much do planning drawings cost in Hackney?+
Get your free Hackney Wick planning assessment
Tell us your Hackney Wick (E9) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.