MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportNew Build Drawings in Hackney

Victorian terrace converted into flats of the kind common across Hackney's Stoke Newington and Clapton streets
Hackney · London

New Build Drawings in Hackney

Fixed-fee, MCIAT-chartered new build drawings for Hackney homeowners — London Borough of Hackney validation and local constraints handled from the start.

Free Hackney planning assessment

Tell us your Hackney address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Hackney runs from the Georgian and Victorian terraces of De Beauvoir and Stoke Newington through dense flat-conversion streets to the warehouse quarters of Shoreditch and Hackney Wick, so the right route for an extension or loft depends heavily on both the building type and its conservation designation. A rear extension in Clapton is a very different application from a roof alteration in the De Beauvoir conservation area, and the borough's tight urban plots with shallow rear gardens shape what is realistically achievable on the terraced streets.

Conservation control is unusually far-reaching here: a very high proportion of streets fall within designated areas such as De Beauvoir, Clapton Square, London Fields, Stoke Newington Church Street, Mapledene and Broadway Market, where permitted development for many external works is removed. On top of that, the London Borough of Hackney operates a borough-wide Article 4 direction removing permitted development for change of use to an HMO, and further directions strip rights across many conservation areas. Because so many homes across Hackney Central, Dalston and Hoxton are converted flats, ownership, lease and shared-structure considerations often matter as much as the planning route itself.

We prepare Hackney planning drawings to the council's validation and design standards, screening the conservation-area status and any flat-conversion ownership context for your exact address before recommending a route to consent. You get a fixed fee agreed up front, the same council-accepted drawings an architect would produce for usually around 30% less, a roughly seven-day drawing turnaround and free redraws until Hackney approves. Most householder applications are determined within the statutory eight weeks once validated, so a validation-first submission is the surest way to avoid the drawing queries that cause delay.

Victorian terrace converted into flats of the kind common across Hackney's Stoke Newington and Clapton streets
Isometric illustration of a Hackney home extension design
Proposed floor plan
Hackney

Planning in Hackney: what to know before you apply

Hackney operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and its numerous conservation areas — De Beauvoir, Clapton Square and London Fields among them — remove permitted development for many external works. Because so many properties are converted flats, ownership and shared-structure considerations often matter as much as the planning route. We confirm both before drawing.

Typical Hackney housing stock

Victorian and Georgian terraces across Stoke Newington, Clapton and De Beauvoir, dense purpose-built and converted flats, and former warehouse and light-industrial buildings converted to housing around Shoreditch, Hoxton and Hackney Wick.

Areas we regularly draw for in Hackney

Hackney Central · Stoke Newington · Clapton · Dalston · Shoreditch · Hoxton · De Beauvoir Town · Hackney Wick

What the numbers say about Hackney planning decisions

These are London Borough of Hackney’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

All development decided in Hackney

Every planning application London Borough of Hackney decided over the four quarters to 2026 Q1, not only householder work — a new dwelling is decided in this wider pool.

Applications decided1,323
Granted1,082
Refused241
GrantedAcross all development types, so it is not comparable with the householder rate82%
Householder applications within itThe rest is the pool a new dwelling is decided in421

Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

If London Borough of Hackney refuses: appeal outcomes

Planning appeals against London Borough of Hackney determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.

Appeals determined595
Allowed249
Dismissed346
Householder appeals allowedFrom 213 householder appeals. England average 36%49%

Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.

New Build Drawings for Hackney homes: the package and the process

A new dwelling is a full application rather than a householder one, and the drawing set reflects that: site layout with levels and boundaries, floor plans and elevations for the new building, sections showing how it sits in the ground, and street-scene elevations placing it against what is already there.

Two packages follow the approval — the planning set and the construction set — and they have to stay in step. Foundation design, drainage strategy, thermal performance and fire strategy are drawn for Building Control against the same geometry that was granted permission, so the built house matches the approved one.

An infill plot is designed against its neighbours. Plot width, the building line either side, and the ridge heights next door set what the new house can be — and on a tight urban site those constraints usually shape the design more than the brief does.

Is my plot suitable for a new build in London?

A feasibility assessment looks at plot size and shape, access, existing boundary conditions, relevant planning policy for the borough, and the likely impact of a new dwelling on neighbouring properties before any design work begins. Infill plots — a gap between existing buildings on a street — and backland plots — a garden or yard site behind existing houses, reached by a shared access — each raise different issues: infill schemes are usually judged on how well they match the scale, spacing and character of the street, while backland schemes are judged heavily on overlooking, garden loss for neighbours, and whether the access arrangement is acceptable. A feasibility study gives an honest view of whether a scheme is likely to succeed before you commit to full drawings.

What does pre-application advice add to a new build project?

Pre-application advice is a formal, paid process most London boroughs offer, where planning officers give written feedback on a proposed scheme before a full application is submitted. For a new build — where the principle of development itself is often the main issue, not just the design details — this feedback can be invaluable: it surfaces concerns around density, massing, daylight and sunlight or heritage context early enough to be addressed in the drawings, rather than discovered for the first time as a refusal reason months into a full application. We prepare and submit pre-application enquiries as part of the new build service where it is likely to strengthen the eventual planning application.

How do daylight, sunlight and overlooking affect a new build design?

London boroughs assess new dwellings against their effect on the daylight and sunlight reaching neighbouring homes and gardens, commonly using the 45-degree rule as an initial check on a proposal's massing and position relative to neighbouring windows, alongside more detailed daylight and sunlight assessment on sensitive sites. Overlooking and loss of privacy from new windows, upper floors or roof terraces are assessed similarly, and often shape decisions on window placement, floor-to-floor heights and the overall footprint and massing of the new building. Designing with these constraints from the earliest sketch stage, rather than adjusting for them after a refusal, is one of the main advantages of instructing feasibility and pre-application work before a full planning set.

New build project stages
StageWhat it establishesTypical fee guide
FeasibilityWhether the plot can support a new dwelling and the likely constraintsQuoted individually, from within the £2,500 new build fee
Pre-application adviceWritten borough feedback on the scheme before a full applicationQuoted individually alongside the planning fee
Full planning drawingsThe complete drawing set submitted for planning permissionFrom £2,500
Building regs and structuralConstruction-ready drawings and calculations for buildingFrom £2,200–£3,850, quoted once planning is settled
Sheet from a new build drawings package prepared for a Hackney property, drawn to London Borough of Hackney validation standards
A sheet from the new build drawings package we submit to London Borough of Hackney.
FAQ

New Build Drawings in Hackney — FAQs

How much do new build drawings cost in London?+
New build drawings start from £2,500 for feasibility and a full planning drawing set on a straightforward infill or backland plot, with building regulations and structural drawings quoted separately once the planning design is agreed.
Can any garden or backland plot be built on in London?+
Not necessarily — backland and garden plots are assessed on access, overlooking, loss of garden amenity for neighbours and borough policy, and a feasibility assessment gives an honest early view of whether a scheme is likely to be supported.
Do I need pre-application advice before a full new build application?+
It is not mandatory, but for a new dwelling — where the principle of development is often the main issue — pre-application advice can surface concerns early enough to address them in the design, reducing the risk of refusal.
Do you handle building regulations and structural drawings for a new build, or only planning?+
Both — the full new build service covers planning, building regulations and structural drawings from one in-house team, so the design stays consistent from feasibility through to construction-ready drawings.
How long does a new build project take from feasibility to planning permission?+
This varies with site complexity and whether pre-application advice is sought, but a full planning application is determined within the statutory period the borough applies to the application type, once submitted via the Planning Portal.
Do I need planning permission for an extension in Hackney?+
It depends on the building and its designation. On unlisted homes outside a conservation area a rear extension may fall within permitted development, but Hackney has a very high proportion of streets within conservation areas — De Beauvoir, Clapton Square and London Fields among them — where those rights are removed. We check your address first and can confirm permitted development with a Lawful Development Certificate where it qualifies.
My Hackney property is a converted flat — can I still extend?+
Often, but the flat-conversion context is decisive. Ownership, lease and party-wall considerations shape whether a rear or roof extension is possible, and the freeholder's agreement is usually needed alongside planning. We confirm the ownership and shared-structure context before drawing so the scheme is realistic from the outset.
What does Hackney's borough-wide HMO Article 4 direction cover?+
Hackney operates a borough-wide Article 4 direction removing permitted development rights for change of use to an HMO (C3 to C4), so a conversion to a house in multiple occupation needs a full application anywhere in the borough. Directions across many conservation areas also remove permitted development for some householder alterations and office-to-residential change of use. We confirm what applies to your address.
How long does Hackney Council take to decide?+
Hackney determines most householder applications within the statutory eight-week period once validated; conservation cases can attract additional consultation. We prepare submissions to the council's validation and design standards to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Hackney?+
We agree a fixed fee before we start, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Hackney approves. A conservation-area extension and a flat-conversion scheme differ in the evidence required, so we quote once we understand your address and project rather than by the hour.
Free Fixed Quote

Get your free Hackney planning assessment

Tell us your Hackney address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.