Free 2026 London Planning Report — Planning permission in Hackney: what it costs and how the council decides

Victorian terrace on Southborough Road in Hackney with white window surrounds and tall chimney stacks, bare street trees and a white van
Hackney · London

Planning permission in Hackney: what it costs and how the council decides

Hackney Council charges £548 for a householder planning application, and our fixed fee for the survey, drawings, design statement and submission starts at £745. In its latest four quarters of government statistics Hackney decided 415 householder applications and granted 85% of them.

Fixed fee from £545 drawings + £200 survey (£745 total) · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

What do the council and DrawingsDirect each charge for a Hackney house application?

The council's fee for a householder application, the category for the enlargement, improvement or alteration of a single dwellinghouse, is £548 under the current national fee schedule.

Our fixed fee is separate and starts at £745. It covers the measured survey of your home, the existing and proposed drawings, the design statement and the submission itself. We confirm it from your address and brief before any survey is booked.

How often and how fast does Hackney decide householder applications?

Over the latest four quarters of MHCLG statistics, Hackney decided 415 householder applications, prior approvals included, and granted 85% of them. Householder cases were fewer than half of the 1,287 planning decisions the borough made in the same period.

Leaving prior approvals out, 90% of Hackney's householder decisions came within 8 weeks. That is the period the Development Management Procedure Order sets for an application that is not major development. These are past decisions across the whole borough, not a forecast: your application is judged on its own address and its own drawings.

Edwardian gabled houses on a residential street with spring blossom
Flat-fronted stock brick terrace with brightly painted front doors

Before any drawing begins we check the address against the 37 conservation-area entries and 71 article 4 direction entries above, then we confirm the fee, arrange the survey and prepare the application for submission to the council.

Our analysis of MHCLG Planning Data Platform conservation-area and article-4-direction datasets (bulk snapshot retrieved 14 Aug 2026). www.planning.data.gov.uk

Why does a Hackney address need checking before anything is drawn?

The national Planning Data Platform lists 37 live conservation-area entries and 71 live article 4 direction entries for Hackney. We say entries because that dataset can hold several records for a single direction.

An article 4 direction removes certain permitted development rights, so work that needs no application on one street can need one on the next. National planning practice guidance also says a Design and Access Statement is required for major development, for some development in conservation areas and World Heritage Sites, and for listed building consent applications. Our fixed fee includes a design statement, so it is part of the work whichever Hackney street you live on.

What does Hackney's appeal record say about refusals?

The Planning Inspectorate's casework database records 216 Hackney householder-development appeals decided as allowed or dismissed, and 49% of them were allowed. Across every type of appeal in the borough the figure is 42%.

An appeal comes after a refusal and takes its own time and cost, so we would rather answer a case officer's likely objections in the drawings and design statement at the start. Those percentages describe appeals the Inspectorate has already decided and say nothing about the outcome of yours.

DrawingsDirect sample sheet: existing and proposed side elevations at 1:100 for a two-storey side extension to an invented house
Sample drawing

How do you start a Hackney planning application with us?

Hackney Council planning sets out what the borough expects to see with an application, and the national requirements apply on top.

Send your address, what you want to build and a few photographs through the quote form. Before any drawing begins we check the address against the 37 conservation-area entries and 71 article 4 direction entries above, then we confirm the fee, arrange the survey and prepare the application for submission to the council.

Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
£745DrawingsDirect starting fixed fee for householder planning drawings (survey, drawings, design statement, submission), with no VAT to add, from the published price listdrawingsdirect.co.uk
£548Fees for planning applications in England from 1 April 2026 (MHCLG, SI 2012/2920 as annually indexed), category 6(1): householder application for the enlargement, improvement or alteration of a single dwellinghouse (source wording: £548)assets.publishing.service.gov.uk
Design and Access StatementPlanning practice guidance, Making an application, paragraph 030: a Design and Access Statement is required for major development, some development in conservation areas and World Heritage Sites, and listed building consent applicationswww.gov.uk
415Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
85%Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
90%Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
216Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
49%Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
37Our analysis of MHCLG Planning Data Platform conservation-area and article-4-direction datasets (bulk snapshot retrieved 14 Aug 2026)www.planning.data.gov.uk
1,287Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
42%Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
71Our analysis of MHCLG Planning Data Platform conservation-area and article-4-direction datasets (bulk snapshot retrieved 14 Aug 2026)www.planning.data.gov.uk
8 weeksDMPO 2015 art 34(2)(b): decision period for an application that is not major development (source wording: "8 weeks beginning with the day immediately following that on which the application is received")www.legislation.gov.uk