
Measured Building Survey in Greenford UB6
Fixed-fee, MCIAT-chartered measured building survey for Greenford (UB6) homeowners — London Borough of Ealing validation and local constraints handled from the start.
Greenford (UB6) is classic outer-west-London Metro-land: broad avenues of interwar semis with deep gardens, ideal for rear and wraparound kitchen extensions, loft conversions with rear dormers, and garage-to-room conversions. Most householder projects here fall squarely within permitted development or a straightforward Ealing Council householder application.
The one sensitivity is the Canalside conservation area on the neighbourhood's north-west flank near the Grand Union, where materials and rear massing get closer scrutiny. We prepare drawings that hold the interwar building line and gap-to-boundary rhythm Ealing's officers expect, and flag any canal-edge or former-industrial plot early so ground and drainage issues are designed out.


Planning in Greenford (UB6): what to know before you apply
No published householder Article 4 direction in Greenford, so most extensions and lofts run under permitted development or a standard Ealing householder application. Properties bordering the Canalside conservation area lose some permitted-development rights, and rear/side extension depths are assessed against the neighbouring semis' building line.
Typical Greenford housing stock
Greenford is dominated by 1920s-30s bay-fronted semis and short terraces laid out along wide suburban avenues, many with generous rear gardens and original hipped roofs. Nearer the Grand Union Canal and the old Rockware/Lyon works, plots give way to former industrial land and later flat-roofed infill.
Streets we regularly draw for in Greenford
Oldfield Lane North · The Fairway · Costons Avenue · Rockware Avenue
What UB6 is actually built of
Measured from 299 classified residential buildings in UB6, not from a description of the area.
Greenford UB6 housing mix
Residential building form across the UB6 postcode district, from 299 classified buildings.
| Attached on more than one side | 44% |
|---|---|
| Attached on one side | 54% |
| Detached | 2% |
| Median building footprint | 62 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.52 |
| Buildings classified | 299 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Measured Building Survey for Greenford (UB6) homes: the package and the process
A measured survey is the foundation every later drawing is checked against. We record the building as found — floor plans, elevations, sections, levels and, where needed, the position of structure and services — to a stated tolerance, so nothing downstream rests on an assumption about what is there.
The deliverable is chosen for what happens next. A conversion or extension design wants a layered CAD file that a designer can build on; a party wall or dilapidations matter wants dimensioned PDFs that stand on their own as a record. We agree that before the survey, because it changes what we capture.
Survey effort follows the building, not the floor area. A regular detached house measures quickly; a terrace with a rear outrigger, split levels, and a century of alterations takes longer because the survey has to record what was actually built rather than what the plan form implies.
Why does a planning or building regulations application need a measured survey?
A planning or building regulations application needs to show the existing building accurately alongside the proposed changes, so the council or Building Control can judge the impact of the work against what is actually there. Existing plans, elevations and sections drawn from an accurate measured survey give the borough confidence that the proposal has been designed against real dimensions, and give your builder a reliable set of drawings to price and build from — an application based on inaccurate or assumed dimensions risks queries, delays, or a design that does not translate cleanly on site.
What does a measured building survey capture?
The survey records everything needed to produce accurate existing drawings: internal room dimensions and floor-to-ceiling heights on every level, the position, width and height of every door and window, wall thicknesses, staircase dimensions and headroom, roof shape and pitch, chimney breasts and structural features, and the external footprint and boundary relationship of the property. Where relevant to the project, we also record ground levels, existing drainage runs and neighbouring boundary conditions.
This is captured with a laser distance meter rather than a tape measure, which keeps the survey accurate to within a few millimetres across a whole property and removes the cumulative measuring error that can creep into a hand-measured survey of a larger or more complex building.
Can I reuse an old survey or estate agent floor plan instead?
Generally, no — estate agent floor plans are produced for marketing purposes and are not dimensionally accurate enough to design an extension or loft conversion against, and a previous owner's drawings may not reflect alterations made since, or may simply be inaccurate to begin with. A fresh measured survey is a modest cost relative to the overall project and is the single best way to avoid a redesign once a builder is on site and finds the real dimensions differ from the drawings.
| Output drawing | Relies on the measured survey for |
|---|---|
| Floor plans | Accurate room dimensions and layout for sale, letting or lease use |
| Planning drawings | Existing plans, elevations and sections to compare against the proposal |
| Building regulations drawings | Accurate existing structure to design technical compliance against |
| Structural calculations | True spans, floor-to-ceiling heights and existing structural elements |

Measured Building Survey in Greenford UB6 — FAQs
How much does a measured building survey cost?+
How long does a measured survey take?+
Is a measured survey the same as a floor plan?+
Do I need a measured survey if I am only doing internal work?+
Can the survey be used for more than one purpose?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Greenford planning assessment
Tell us your Greenford (UB6) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.