
Measured Building Survey in Ealing
Fixed-fee, MCIAT-chartered measured building survey for Ealing homeowners — London Borough of Ealing validation and local constraints handled from the start.
Ealing pairs generous Edwardian and Victorian housing stock with some of West London's most protective conservation control, so the right route for an extension or loft depends heavily on where in the borough you are. The stock ranges from Edwardian and Victorian terraces through 1930s Metro-land semi-detached homes in Perivale, Greenford and Northolt to the Arts-and-Crafts houses of Bedford Park. A rear extension in Northolt is a very different application from a roofline change in Bedford Park, and treating them the same is how schemes stall.
The constraints matter early. The London Borough of Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and applies further control to front-garden hardstanding in parts of the borough. Its conservation areas — Bedford Park, Ealing Green, Pitshanger, Hanwell Village Green and St Stephen's — apply strict control over dormers, materials and front elevations, Bedford Park most tightly of all. Mature street trees carry Tree Preservation Orders, and aircraft-noise considerations apply toward the west of the borough, so the address determines the approach.
We prepare Ealing planning drawings to the council's validation standards, checking permitted development eligibility first and designing to Ealing's residential extension guidance so applications are validated without a query. On the Metro-land semis of Perivale and Greenford that usually means confirming a hip-to-gable or dormer loft as permitted development with a Lawful Development Certificate; in Bedford Park and the other conservation areas it means a full householder application designed to the area's character. The fee is fixed and agreed up front, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Ealing approves. Our validation-first approach and roughly seven-day drawing turnaround keep most applications inside the statutory eight-week determination.


Planning in Ealing: what to know before you apply
Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and its conservation areas — Bedford Park especially — apply strict control over dormers, materials and front elevations. We flag these before drawing.
Typical Ealing housing stock
Edwardian and Victorian terraces, 1930s Metro-land semi-detached homes, and the Arts-and-Crafts houses of Bedford Park.
Areas we regularly draw for in Ealing
Ealing Broadway · Acton · Hanwell · Greenford · Northolt · Perivale · Southall
What Ealing is actually built of
Building form decides the survey scope. Attached housing means party-wall lines and neighbouring returns have to be picked up accurately because they constrain everything after; a detached plot usually needs the boundary and levels instead. These are measured counts from Ordnance Survey building data, not a description of the borough.
Ealing building stock
Residential building form across 7 of Ealing's 7 postcode districts, from 2,357 classified buildings. Connectivity is topology: a semi extended into its garage reads as attached on more than one side.
| Attached on more than one side | 45% |
|---|---|
| Attached on one side | 49% |
| Detached | 6% |
| Buildings attached on more than one side | 1,065 |
| Detached buildings | 142 |
| Buildings classified | 2,357 |
| Postcode districts measured | 7 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Measured Building Survey for Ealing homes: the package and the process
A measured survey is the foundation every later drawing is checked against. We record the building as found — floor plans, elevations, sections, levels and, where needed, the position of structure and services — to a stated tolerance, so nothing downstream rests on an assumption about what is there.
The deliverable is chosen for what happens next. A conversion or extension design wants a layered CAD file that a designer can build on; a party wall or dilapidations matter wants dimensioned PDFs that stand on their own as a record. We agree that before the survey, because it changes what we capture.
Survey effort follows the building, not the floor area. A regular detached house measures quickly; a terrace with a rear outrigger, split levels, and a century of alterations takes longer because the survey has to record what was actually built rather than what the plan form implies.
Why does a planning or building regulations application need a measured survey?
A planning or building regulations application needs to show the existing building accurately alongside the proposed changes, so the council or Building Control can judge the impact of the work against what is actually there. Existing plans, elevations and sections drawn from an accurate measured survey give the borough confidence that the proposal has been designed against real dimensions, and give your builder a reliable set of drawings to price and build from — an application based on inaccurate or assumed dimensions risks queries, delays, or a design that does not translate cleanly on site.
What does a measured building survey capture?
The survey records everything needed to produce accurate existing drawings: internal room dimensions and floor-to-ceiling heights on every level, the position, width and height of every door and window, wall thicknesses, staircase dimensions and headroom, roof shape and pitch, chimney breasts and structural features, and the external footprint and boundary relationship of the property. Where relevant to the project, we also record ground levels, existing drainage runs and neighbouring boundary conditions.
This is captured with a laser distance meter rather than a tape measure, which keeps the survey accurate to within a few millimetres across a whole property and removes the cumulative measuring error that can creep into a hand-measured survey of a larger or more complex building.
Can I reuse an old survey or estate agent floor plan instead?
Generally, no — estate agent floor plans are produced for marketing purposes and are not dimensionally accurate enough to design an extension or loft conversion against, and a previous owner's drawings may not reflect alterations made since, or may simply be inaccurate to begin with. A fresh measured survey is a modest cost relative to the overall project and is the single best way to avoid a redesign once a builder is on site and finds the real dimensions differ from the drawings.
| Output drawing | Relies on the measured survey for |
|---|---|
| Floor plans | Accurate room dimensions and layout for sale, letting or lease use |
| Planning drawings | Existing plans, elevations and sections to compare against the proposal |
| Building regulations drawings | Accurate existing structure to design technical compliance against |
| Structural calculations | True spans, floor-to-ceiling heights and existing structural elements |

Measured Building Survey across Ealing
Measured Building Survey in Ealing — FAQs
How much does a measured building survey cost?+
How long does a measured survey take?+
Is a measured survey the same as a floor plan?+
Do I need a measured survey if I am only doing internal work?+
Can the survey be used for more than one purpose?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Ealing planning assessment
Tell us your Ealing address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.