
Planning Drawings in Ealing
Fixed-fee, MCIAT-chartered planning drawings for Ealing homeowners — London Borough of Ealing validation and local constraints handled from the start.
Ealing pairs generous Edwardian and Victorian housing stock with some of West London's most protective conservation control, so the right route for an extension or loft depends heavily on where in the borough you are. The stock ranges from Edwardian and Victorian terraces through 1930s Metro-land semi-detached homes in Perivale, Greenford and Northolt to the Arts-and-Crafts houses of Bedford Park. A rear extension in Northolt is a very different application from a roofline change in Bedford Park, and treating them the same is how schemes stall.
The constraints matter early. The London Borough of Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and applies further control to front-garden hardstanding in parts of the borough. Its conservation areas — Bedford Park, Ealing Green, Pitshanger, Hanwell Village Green and St Stephen's — apply strict control over dormers, materials and front elevations, Bedford Park most tightly of all. Mature street trees carry Tree Preservation Orders, and aircraft-noise considerations apply toward the west of the borough, so the address determines the approach.
We prepare Ealing planning drawings to the council's validation standards, checking permitted development eligibility first and designing to Ealing's residential extension guidance so applications are validated without a query. On the Metro-land semis of Perivale and Greenford that usually means confirming a hip-to-gable or dormer loft as permitted development with a Lawful Development Certificate; in Bedford Park and the other conservation areas it means a full householder application designed to the area's character. The fee is fixed and agreed up front, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Ealing approves. Our validation-first approach and roughly seven-day drawing turnaround keep most applications inside the statutory eight-week determination.


Planning in Ealing: what to know before you apply
Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and its conservation areas — Bedford Park especially — apply strict control over dormers, materials and front elevations. We flag these before drawing.
Typical Ealing housing stock
Edwardian and Victorian terraces, 1930s Metro-land semi-detached homes, and the Arts-and-Crafts houses of Bedford Park.
Areas we regularly draw for in Ealing
Ealing Broadway · Acton · Hanwell · Greenford · Northolt · Perivale · Southall
What the numbers say about Ealing planning decisions
These are London Borough of Ealing’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.
Householder decisions in Ealing
Every householder application London Borough of Ealing decided over the four quarters to 2026 Q1.
| Householder applications decided | 993 |
|---|---|
| Granted | 871 |
| Refused | 122 |
| GrantedEngland average 90% | 88% |
| Of which prior approvalsPrior approvals are granted far more often than full applications, so this share moves the rate above | 58% |
| Decided within 8 weeksExcludes prior approvals. England average 93% | 97% |
Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.
Permitted development in Ealing
Larger householder extensions put to London Borough of Ealing under the prior-approval route, and lawful-development certificates decided, over eight quarters.
| Prior approval not requiredWent ahead without a full application | 384 |
|---|---|
| Prior approval granted | 36 |
| Prior approval refused | 153 |
| Granted where a decision was neededFrom 189 determinations | 19% |
| Building upwards, prior approval refused | 1 |
| Certificates of lawful development decided | 1,383 |
Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.
Designated areas in Ealing
Conservation areas London Borough of Ealing has published to the national register, and when it designated them. Where a borough has supplied no Article 4 data the row is omitted rather than shown as zero.
| Conservation areas on the register | 31 |
|---|---|
| First designatedOf the 28 whose designation date the register records | 1,969 |
| Most recent designation | 2,007 |
Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.
If London Borough of Ealing refuses: appeal outcomes
Planning appeals against London Borough of Ealing determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.
| Appeals determined | 478 |
|---|---|
| Allowed | 146 |
| Dismissed | 332 |
| Householder appeals allowedFrom 204 householder appeals. England average 36% | 44% |
Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.
Planning Drawings for Ealing homes: the package and the process
A planning set is judged as a set, not as individual sheets. Every existing drawing needs its proposed counterpart at the same scale and orientation so the officer can read the change at a glance, each sheet needs its own number, title, scale bar and north point, and the whole package needs to survive being printed at A3 without a dimension becoming illegible.
We draw to the conventions validation teams expect: plans and elevations at 1:100 or 1:50, a location plan at 1:1250 with the site edged red, a block plan at 1:500, and sections cut where the change in level or roof form actually happens rather than where they are easiest to draw.
The drawing list itself changes with the building. A detached house needs four elevations; a mid-terrace needs two plus a section through the party walls to show what is not visible from outside. Getting that list right at the start is what stops a validation officer asking for a sheet three weeks in.
What is included in a planning drawing set?
A council will only validate an application that contains the right drawings at the right scale. Our standard planning set covers everything a London validation team expects.
- Site location plan (1:1250) and block plan (1:500)
- Existing floor plans, elevations and sections
- Proposed floor plans, elevations and sections
- Roof plans where relevant, with heights and materials annotated
- A design and access or heritage statement where the borough requires one
How are planning drawings different from building regulations drawings?
Planning drawings show what the building will look like and how it sits in its context. Building regulations drawings show how it will be built safely — structure, insulation, fire escape and drainage. Most projects need both; our Complete package covers the two together with structural calculations coordinated in-house.
How quickly can you produce planning drawings in London?
After a laser survey, a standard householder set is typically ready within 7 days. We review every drawing against your borough's validation checklist before it reaches a planner's desk, which is why our first-time approval rate sits around 96%.
| Drawing | Typical scale | What it shows |
|---|---|---|
| Site location plan | 1:1250 | The property in its street context, site edged red |
| Block plan | 1:500 | The building's footprint and position in the plot |
| Floor plans (existing & proposed) | 1:100 / 1:50 | Room layout, walls, openings and the proposed changes |
| Elevations (existing & proposed) | 1:100 / 1:50 | Each face of the building and how it changes |
| Sections | 1:100 / 1:50 | A cut through showing heights, levels and roof form |

Planning Drawings across Ealing
Planning Drawings in Ealing — FAQs
What scale should London planning drawings be?+
Do I need an architect to produce planning drawings?+
How many revisions are included in the fee?+
Can you draw from my existing plans?+
Do planning drawings guarantee approval?+
Do I need planning permission for a rear extension in Ealing?+
What extra control applies in Bedford Park?+
How long does Ealing Council take to decide a householder application?+
Can you help with a loft conversion on a 1930s Ealing semi?+
How much do planning drawings cost in Ealing?+
Get your free Ealing planning assessment
Tell us your Ealing address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.