
House Extension Drawings in Wandsworth
Fixed-fee, MCIAT-chartered house extension drawings for Wandsworth homeowners — London Borough of Wandsworth validation and local constraints handled from the start.
Wandsworth is defined by its long Victorian and Edwardian terraced grids — the 'between the commons' streets — where the side-return and rear extension is the obvious route to more space. These are consistent house types repeated street after street, so the borough has clear views on rear depth, roof form and side-return design, and a technologist who knows the local pattern can draw to them from the start rather than discovering them through revisions.
Where you are in the borough shapes the route. Conservation areas such as Wandsworth Common, Tonsley, Nightingale Lane, Clapham Common and Battersea Park tighten control over rooflines, materials and side-return design, and the council applies Article 4 directions to basement development in parts of the borough, requiring a Basement Impact Assessment covering structural stability, drainage and groundwater. Near the riverside, Thames flood-zone considerations also come into play, while much of Battersea and the streets around the commons is Edwardian mansion blocks and converted flats where ownership, lease and party-wall context matters as much as the planning route.
We prepare Wandsworth planning drawings to the borough's residential extension and basement guidance, checking permitted development eligibility and any conservation-area or basement Article 4 constraint for your exact address before design begins, and drawing the engineer's structural calculations onto the set so these party-wall-sensitive terraces are handled cleanly. The fee is fixed and agreed up front — taken from our published price list — with free redraws until Wandsworth approves. We draw to the validation checklist and turn the drawings around in about seven days. The council's eight weeks begin the day after it receives a valid application, unless a longer period is agreed in writing.


Planning in Wandsworth: what to know before you apply
Wandsworth applies Article 4 directions to basement development in parts of the borough, requiring a basement impact assessment, and several conservation areas control roof and side-return design. Terraced side-returns recur across the borough, so we draw them to the council's residential extension guidance.
Typical Wandsworth housing stock
Long grids of Victorian and Edwardian terraces — the 'between the commons' streets — plus Edwardian mansion blocks and riverside conversions.
Areas we regularly draw for in Wandsworth
Clapham · Balham · Putney · Tooting · Battersea · Earlsfield · Southfields
What the numbers say about Wandsworth planning decisions
These are London Borough of Wandsworth’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.
Permitted development in Wandsworth
Larger householder extensions put to London Borough of Wandsworth under the prior-approval route, and lawful-development certificates decided, over eight quarters.
| Prior approval not requiredWent ahead without a full application | 56 |
|---|---|
| Prior approval granted | 31 |
| Prior approval refused | 25 |
| Granted where a decision was neededFrom 56 determinations | 55% |
| Building upwards, prior approval refused | 2 |
| Certificates of lawful development decided | 695 |
Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-10-18.
What removes permitted development in Wandsworth
Live entries on the national planning registers for London Borough of Wandsworth. Article 4 directions withdraw permitted development rights, so a project inside one needs a full application rather than prior approval. Revoked and expired entries are excluded.
| Conservation areasPermitted development is already narrower inside one | 47 |
|---|
Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-10-19.
House Extension Drawings for Wandsworth homes: the package and the process
Extension drawings are read for their dimensions. The proposed plan needs depth measured from the original rear wall — not from a previous extension — eaves and ridge heights taken from existing ground level, and the distance to each boundary marked. A site plan showing how much garden remains is what an officer reaches for when the amenity question comes up.
We draw the existing building accurately first, because everything else is measured from it. Where the original footprint has already been added to, that history goes on the drawing: it decides which allowances are still available and it is the first thing an officer checks against the council's own records.
The plot decides the extension type long before taste does. A mid-terrace has depth to work with and an alley if it is lucky; a semi has one clear flank; a detached house can go wide. Reading the building form first is what stops a design being drawn that the plot cannot take.
Which extension types do you draw?
Every London extension is shaped by the plot, the neighbours and the borough's design guidance. We draw them all.
Rear extension
A single-storey rear extension is often permitted development within depth limits — ideal for an open-plan kitchen-diner.
Side-return
Fills the alley beside a Victorian terrace, widening the ground floor without losing garden.
Wraparound
Combines a rear and side-return extension for a transformative ground floor, usually needing planning permission.
Double-storey
Adds space above and below, subject to tighter scale and neighbour-impact scrutiny.
Basement
Creates space downward where footprint is limited, with structural and party-wall care.
Do I need planning permission for a house extension in London?
Single-storey rear extensions within permitted development limits (up to 6m for terraced/semi-detached homes under the larger-home scheme, subject to neighbour consultation) may not need a full application. Wraparounds, double-storeys and anything in a conservation area usually do. We assess your plot and recommend the right route before drawing. The current depth, height and eaves limits are set out in full in the guide to planning permission for a rear extension.
How do you maximise the footprint the council will approve?
We know each borough's depth, height and daylight standards, so we design to the edge of what will be approved rather than guessing — and we check the 45-degree neighbour daylight rule and any rear building line before submission. Where a plot is tight we test a permitted-development scheme against a slightly larger householder application and show you the trade-off in space, cost and timescale, so the drawn scheme is the one that actually maximises value rather than just floor area.
| Extension | Typical route | Package | Fee from |
|---|---|---|---|
| Single-storey rear | Permitted development / householder | Survey + planning or PD drawings | £695 |
| Side-return | Householder planning | Planning + building regs + structural | £1,845 |
| Wraparound | Householder planning | Survey + householder planning drawings | £1,095 |
| Double-storey | Householder planning | Survey + householder planning drawings | £995 |

House Extension Drawings across Wandsworth
House Extension Drawings in Wandsworth — FAQs
How far can I extend without planning permission in London?+
Do extension drawings include structural calculations?+
How long do extension drawings take?+
Will my rear extension need a party wall agreement?+
Can I extend a house in a conservation area?+
Do I need planning permission for a side-return extension in Wandsworth?+
What does Wandsworth's basement Article 4 direction mean for me?+
How long will Wandsworth take to decide my application?+
Can you design an extension for a converted flat near the commons?+
How much do Wandsworth planning drawings cost?+
Get your free Wandsworth planning assessment
Tell us your Wandsworth address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.