Free 2026 London Planning Report — Do I need building regulations approval in London?

Open-plan kitchen extension mid fit-out, with plastered walls and a bare screed floor
Guide

Do I need building regulations approval in London?

Yes for almost any extension, loft or structural change. A few small buildings are exempt: a detached building of 15m² or less with no sleeping accommodation, and, under set conditions, a detached single-storey one up to 30m². Our Building Regulations drawings start at £745.

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

Planning permission and building regulations are separate approvals

Planning permission decides whether a building may go where you propose it. Building regulations decide whether it is safe and efficient once built: structure, fire, drainage, ventilation, insulation and access. A scheme can be exempt from one and still need the other.

Our guide to planning drawings and Building Regulations drawings shows what each set contains.

The small detached buildings that are exempt

Schedule 2, Class 6 of the Building Regulations 2010 exempts a detached building with a floor area of 15m2 or less and no sleeping accommodation (Building Regulations 2010, Schedule 2).

The same class exempts a detached single-storey building of up to 30m2 with no sleeping accommodation, but only if it stands at least one metre from the boundary or is substantially non-combustible. A garden room used as a bedroom is not exempt, whatever its size.

Metal stud partitions and plasterboard sheets during a conversion
Rear extension under construction: blockwork walls and a steel beam opening up the back of a house

For a full plans application the authority must notify its decision within five weeks of receipt, or a longer period you agree in writing (Building Regulations 2010, regulation 14A(6)).

Building Regulations 2010 reg 14A(6): authority must notify the outcome of a full plans application within five weeks of receipt, or a longer period agreed in writing (source wording: five weeks). www.legislation.gov.uk

What about a garage?

A detached garage fits the 30m2 exemption when it meets the boundary-distance or non-combustible condition. An attached garage is outside the detached-building classes, and turning any garage into a living room brings the work under building regulations.

Our garage conversion drawings service covers that case.

Porches, conservatories and carports

Class 7 exempts a ground-level conservatory, porch, covered yard, covered way or carport open on at least two sides, where the floor area is no more than 30m2. Check the other conditions in the schedule against your design.

Most house extensions, lofts, basements and removed structural walls fall outside every exemption and need a building control body to check them.

DrawingsDirect sample planning sheet with proposed plans and elevations at 1:100 and a site plan at 1:500
Sample drawing

How long does a decision take?

For a full plans application the authority must notify its decision within five weeks of receipt, or a longer period you agree in writing (Building Regulations 2010, regulation 14A(6)). Complete drawings and a structural design help that period run smoothly.

Our fixed fee for Building Regulations drawings starts at £745. To choose between the council and a registered building control approver, read how building control in London works.

Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
15m2Building Regulations 2010 Sch 2 Class 6 para 3: exempt detached building with floor area not exceeding 15m2 and no sleeping accommodation (source wording: 15m2)www.legislation.gov.uk
30m2Building Regulations 2010 Sch 2 Class 6 para 1: exempt detached single-storey building not exceeding 30m2, no sleeping accommodation, at least one metre from the boundary or substantially non-combustible (source wording: 30m2)www.legislation.gov.uk
30m2Building Regulations 2010 Sch 2 Class 7: exempt ground-level conservatory, porch, covered yard or covered way, or carport open on two sides, with floor area not exceeding 30m2 (source wording: 30m2)www.legislation.gov.uk
five weeksBuilding Regulations 2010 reg 14A(6): authority must notify the outcome of a full plans application within five weeks of receipt, or a longer period agreed in writing (source wording: five weeks)www.legislation.gov.uk
£745DrawingsDirect starting fixed fee for building regulations drawings, from the published price listdrawingsdirect.co.uk
FAQ

Questions people ask

Do I need building regulations for a garage?
A detached garage up to 30m2 can be exempt if it is at least one metre from the boundary or substantially non-combustible. An attached garage, or any conversion to a habitable room, needs approval.
Can I build first and apply afterwards?
Plan to apply before you start. Regularisation exists for some cases, but it can mean opening up finished work for inspection.
Does a garden office need building regulations?
Often not, if it is detached, within the area limits and has no sleeping accommodation. Planning rules on outbuildings are separate.