MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex
25 Eccleston Place, Victoria, London SW1W 9NFhello@drawingsdirect.co.uk020 7864 7245WhatsApp

Free 2026 London Planning Report — Building regulations drawings in Southwark

Long terrace of Georgian town houses with white stucco ground floor and brown brick above, on Trinity Street in Southwark
Southwark · London

Building regulations drawings in Southwark

Southwark building regulations drawings are the construction set a building control surveyor tests against the regulations: floor, wall and roof sections, structure, drainage, the escape route and fire safety for your extension, loft or conversion. DrawingsDirect's starting fixed fee for a full plans drawing package is £745.

Fixed fee from £545 drawings + £200 survey (£745 total) · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

From submission to start on site

Once the full plans application is in, the authority must notify its outcome within five weeks of receipt, or a longer period agreed in writing (Building Regulations 2010, regulation 14A(6)). Work cannot begin until at least two days have elapsed since the end of the day the notice of intention to start was given (regulation 16(1)(b)).

Read both on legislation.gov.uk. Our building control in London guide covers the inspections that follow.

What the package contains

Sections through the floors, walls and roof, structure, drainage runs, the escape route and a specification naming the materials. Planning drawings against building regulations drawings shows how the sets differ.

If you have not yet been through planning, see planning permission in Southwark. For layouts before construction detail, our Southwark floor plans page covers that stage.

Metal stud partitions and plasterboard sheets during a conversion
1930s house in North Acton stripped back for a major extension, roof timbers exposed, a mini excavator behind the fence and a blue-tarped skip

Southwark made 558 householder decisions over the four quarters 2025 Q3 to 2026 Q2, counting prior approvals, and 95% were granted.

Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2). www.gov.uk

Southwark's planning figures

Southwark made 558 householder decisions over the four quarters 2025 Q3 to 2026 Q2, counting prior approvals, and 95% were granted. Excluding prior approvals, 97% were decided within 8 weeks (our analysis of MHCLG planning application statistics, table PS2).

Of 72 householder appeals decided between 2021 and 2026, 31% were allowed (our analysis of the Planning Inspectorate Casework Database, release 2609). It is history, not a forecast.

The national register holds 56 conservation-area entries for Southwark (our analysis of the MHCLG Planning Data Platform conservation-area dataset, snapshot retrieved 14 Aug 2026). Check the council's conservation area map: a designation can change the planning route, while the Building Regulations still apply.

Our fee for the package

A building regulations full plans drawing package starts from £745. Building Control charges its own fee, and the pricing page lists the rest of ours.

DrawingsDirect sample Building Regulations sheet with construction notes and details
Sample drawing
Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
£745DrawingsDirect starting fixed fee for a building regulations full plans drawing package, from the published price listdrawingsdirect.co.uk
five weeksBuilding Regulations 2010 reg 14A(6): the authority must notify the outcome of a full plans application within five weeks of receipt, or a longer agreed period (source wording: "within five weeks beginning with the date the application is received")www.legislation.gov.uk
two daysBuilding Regulations 2010 reg 16(1)(b): work must not start until at least two days have elapsed since the end of the day the notice of intention to start was given (source wording: "at least two days have elapsed")www.legislation.gov.uk
558Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
95%Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
97%Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
72Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
31%Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
56Our analysis of MHCLG Planning Data Platform conservation-area and article-4-direction datasets (bulk snapshot retrieved 14 Aug 2026)www.planning.data.gov.uk
FAQ

Questions people ask

Does a Southwark loft conversion need Building Regulations approval?
Yes. A loft conversion changes structure, stairs and the escape route, so it needs approval whether or not it needs planning permission.
Can work start before the plans are approved?
The regulations allow a start once the notice of intention to start has been given and two days have passed (regulation 16(1)(b)). Building ahead of approval means any change Building Control asks for falls on work already done.
Do I need structural calculations as well?
If the job moves load, yes. They are a separate piece within the package.

Photographs: Fernweh (CC BY-SA 2.0); David Hawgood (CC BY-SA 2.0); David Hawgood (CC BY-SA 2.0).