Enfield validation checklist and building regulations drawings
A validation checklist is the list of documents Enfield needs before it registers a planning application, and it is separate from building regulations drawings. We prepare the building regulations drawings from £745, and the authority has five weeks from receipt to notify its outcome on a full plans application.
Fixed fee from £545 drawings + £200 survey (£745 total) · all prices
Prefer to talk it through?
Two submissions, two checklists
Planning validation asks whether the application is complete: plans, forms, fee and any documents the council's local list requires. Building Regulations ask whether the work will comply once built. Passing the first says nothing about the second.
Check Enfield's own current validation list on its website before you submit a planning application, as councils revise them. For the planning stage, our planning permission service covers the drawings. This page is about what comes after: the construction set Building Control reads.
What Building Control needs from a full plans package
Expect sections through the floor, wall and roof, beam and foundation positions, drainage, the escape route and a specification. Our building regulations approval guide explains what triggers approval, and planning drawings against building regulations drawings shows what changes between the two sets.
Structural calculations are a separate piece. Our structural drawings service covers the beams and openings that the construction set refers to.


Of 267 householder appeals decided between 2021 and 2026, 40% were allowed (our analysis of the Planning Inspectorate Casework Database, release 2609); that is a past record, not a forecast.
Clocks that start once you submit
The authority must notify the outcome of a full plans application within five weeks of receipt, or a longer period agreed in writing (Building Regulations 2010, regulation 14A(6)). A separate rule governs the start: once the notice of intention to start is given, at least two days must pass, counted from the end of that day, before work begins (regulation 16(1)(b)).
Both are in the regulations on legislation.gov.uk.
Enfield in the figures
On the planning side, 83% of Enfield's 934 householder decisions between 2025 Q3 and 2026 Q2 were grants, prior approvals included, and 92% of the decisions that were not prior approvals came within 8 weeks (our analysis of MHCLG planning application statistics, table PS2).
Of 267 householder appeals decided between 2021 and 2026, 40% were allowed (our analysis of the Planning Inspectorate Casework Database, release 2609); that is a past record, not a forecast. The national register lists 24 conservation-area entries for Enfield (our analysis of the MHCLG Planning Data Platform conservation-area dataset, snapshot retrieved 14 Aug 2026), so check the council's conservation area map for your address.

What the construction set costs
A building regulations full plans drawing package starts from £745. Building Control charges separately; our pricing page lists the rest.
Sources
Every figure on this page, where it comes from and a link to the original.
| Figure | Source | Link |
|---|---|---|
| £745 | DrawingsDirect starting fixed fee for a building regulations full plans drawing package, from the published price list | drawingsdirect.co.uk |
| five weeks | Building Regulations 2010 reg 14A(6): the authority must notify the outcome of a full plans application within five weeks of receipt, or a longer agreed period (source wording: "within five weeks beginning with the date the application is received") | www.legislation.gov.uk |
| two days | Building Regulations 2010 reg 16(1)(b): work must not start until at least two days have elapsed since the end of the day the notice of intention to start was given (source wording: "at least two days have elapsed") | www.legislation.gov.uk |
| 934 | Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2) | www.gov.uk |
| 83% | Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2) | www.gov.uk |
| 92% | Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2) | www.gov.uk |
| 267 | Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609)) | www.gov.uk |
| 40% | Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609)) | www.gov.uk |
| 24 | Our analysis of MHCLG Planning Data Platform conservation-area and article-4-direction datasets (bulk snapshot retrieved 14 Aug 2026) | www.planning.data.gov.uk |
Questions people ask
Is the validation checklist the same as the building regulations checklist?
Does an Enfield extension need both?
Where do I find the current local list?
Photographs: David Howard (CC BY-SA 2.0); David Hawgood (CC BY-SA 2.0).