MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportRear Extension Drawings in Merton

Rear extension opening onto a suburban garden, typical of a Merton Raynes Park or Wimbledon family-home project
Merton · London

Rear Extension Drawings in Merton

Fixed-fee, MCIAT-chartered rear extension drawings for Merton homeowners — London Borough of Merton validation and local constraints handled from the start.

Free Merton planning assessment

Tell us your Merton address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Merton runs from the sought-after Victorian villas and terraces of Wimbledon Village and South Wimbledon and the planned John Innes estate at Merton Park down through the interwar semis of Raynes Park and Morden to the historic Cricket Green at Mitcham and the streets of Colliers Wood. Loft conversions and rear extensions are the borough's signature projects, with strong conservation control around Wimbledon and Merton Park tightening design where it applies.

The character shifts across the borough. Conservation areas at Wimbledon Village, Wimbledon Common, the John Innes estate at Merton Park, Mitcham Cricket Green, Colliers Wood and Wimbledon West Side control materials, rooflines and front elevations, and the John Innes estate's distinctive Arts-and-Crafts character is protected especially closely, with permitted development often restricted there. Article 4 directions remove permitted development for HMO conversions in designated wards, and toward Raynes Park and Morden the council expects extensions to respect the consistent interwar building lines. Those interwar semis, however, frequently retain permitted development rights for rear extensions and lofts.

We prepare Merton planning drawings that respect the character of the specific area — the Arts-and-Crafts detailing of Merton Park, the villa streets of Wimbledon, and the suburban lines of Raynes Park and Morden — checking permitted development eligibility and any Article 4 or conservation constraint first. It is the same council-accepted drawing set an architect would produce, usually at around 30% less, with a fixed fee agreed up front, a roughly seven-day drawing turnaround and free redraws until the London Borough of Merton approves. Most householder applications are decided within the statutory eight-week period once validated, so we draw to the council's validation checklist from the outset.

Rear extension opening onto a suburban garden, typical of a Merton Raynes Park or Wimbledon family-home project
Isometric illustration of a Merton home extension design
Proposed floor plan
Merton

Planning in Merton: what to know before you apply

Merton applies Article 4 directions to HMO conversions in designated wards and controls design within conservation areas such as Wimbledon Village, Wimbledon Common and the John Innes estate at Merton Park. For the borough's interwar semis around Raynes Park and Morden, rear extensions and lofts frequently qualify as permitted development — we confirm before drawing.

Typical Merton housing stock

Victorian and Edwardian villas and terraces around Wimbledon and South Wimbledon, the planned Arts-and-Crafts John Innes estate at Merton Park, and interwar semi-detached suburbia through Raynes Park, Morden and Mitcham.

Areas we regularly draw for in Merton

Wimbledon · Mitcham · Morden · Raynes Park · Colliers Wood · Merton Park · South Wimbledon · Wimbledon Village

What the numbers say about Merton planning decisions

These are London Borough of Merton’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

Permitted development in Merton

Larger householder extensions put to London Borough of Merton under the prior-approval route, and lawful-development certificates decided, over eight quarters.

Prior approval not requiredWent ahead without a full application321
Prior approval granted40
Prior approval refused179
Granted where a decision was neededFrom 219 determinations18%
Building upwards, prior approval refused0
Certificates of lawful development decided156

Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

What removes permitted development in Merton

Live entries on the national planning registers for London Borough of Merton. Article 4 directions withdraw permitted development rights, so a project inside one needs a full application rather than prior approval. Revoked and expired entries are excluded.

Conservation areasPermitted development is already narrower inside one28

Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.

Rear Extension Drawings for Merton homes: the package and the process

Depth is the number the application turns on, and it has to be measured from the original rear wall of the house rather than from whatever is there now. The drawings carry that dimension, the eaves and ridge heights, the position of any rooflight, and the boundary distances on both sides.

Where the scheme goes beyond the standard allowance and relies on the larger home extension route, the drawings serve a second purpose: they are what the council sends to the neighbours during the consultation. A clear, dimensioned proposed elevation answers the objection about overshadowing before it is made.

Depth is limited by the plot as much as by the rules. A long garden behind a terrace can take the full allowance, while a short one runs out before the rules do — and on a semi or detached house the same depth reads very differently from the boundary.

Do I need planning permission for a rear extension in London?

Many single-storey rear extensions qualify as permitted development, meaning no planning application is needed, provided depth, height and materials stay within set limits. That changes if your property sits in a conservation area or is subject to an Article 4 direction, both of which can remove permitted development rights across a street or borough — in that case a full householder planning application is required regardless of size.

Even where an extension qualifies, most homeowners obtain a Lawful Development Certificate to confirm that status in writing before building — useful for mortgage lenders, buyers and Building Control. We check your property against your borough's constraints before recommending a route.

How deep can a single-storey rear extension go?

Depth is the main constraint on a rear extension, and it depends on your house type and whether you use standard permitted development or the larger home extension scheme.

Permitted development

Standard permitted development allows a single-storey rear extension up to 3 metres deep for terraced and semi-detached houses, or 4 metres for detached houses, generally with eaves height limited to match or stay close to the existing house.

Larger home extension scheme

The prior-approval scheme extends this to 6 metres for terraced and semi-detached houses and 8 metres for detached houses. Your council writes to affected neighbours; if none object within the notification period, approval follows without a full planning application. If an objection is raised, the council assesses the impact on neighbouring light and outlook itself, rather than automatically refusing, so a well-considered design still has a good chance of approval.

Designing the kitchen-diner: rooflights, bi-folds and daylight

Most rear extensions exist to create one open-plan kitchen, dining and living space, so the drawing work focuses on getting light and flow right within the depth you are allowed.

  • Structural opening sized for bi-fold or sliding doors across most of the rear elevation
  • Rooflights or a roof lantern positioned to light the centre of the room, away from the shadow line of the main house
  • Open-plan layout tested against the 45-degree rule, which protects daylight to your neighbours' windows and can limit how close a flank wall or roof comes to the boundary
  • Floor build-up and threshold detail coordinated so the new floor meets the existing one without a step
Rear extension routes at a glance
RouteWhen it appliesTypical fee
Permitted development (Lawful Development Certificate)Depth within 3m (terraced/semi) or 4m (detached), height and materials within PD limitsPD/LDC pack ~£950–£1,450
Larger home extension (prior approval)Depth up to 6m (terraced/semi) or 8m (detached), with neighbour notificationfrom £1,100
Full householder planning permissionExtension exceeds PD/larger-home limits, or the property is in a conservation area with an Article 4 directionFull Planning pack ~£1,600–£2,400
Planning + Building Regulations (structural)Combined planning and construction-ready pack with structural calculations for the opening and roofPlanning + Building Regs pack ~£2,200–£3,850
Sheet from a rear extension drawings package prepared for a Merton property, drawn to London Borough of Merton validation standards
A sheet from the rear extension drawings package we submit to London Borough of Merton.
FAQ

Rear Extension Drawings in Merton — FAQs

How much does a rear extension cost to design in London?+
Rear extension drawings start from £1,100, with the final fee set by the route your extension takes — permitted development, prior approval or full planning — and whether you need building regulations and structural calculations bundled in. The fee is fixed and agreed upfront.
Do I need an architect for a rear extension?+
No. DrawingsDirect is an MCIAT-chartered architectural technologist practice, producing the same council-accepted drawings as an architect for a fixed fee typically around 30% lower.
How long does it take to get rear extension drawings?+
Drawings are typically ready around 7 days from survey. Once submitted, councils have a statutory 8-week period to determine a standard householder planning application.
What is the 45-degree rule?+
It is a daylight test many London councils apply to check that a rear extension does not block too much light to a neighbour's nearest window, measured as a line drawn at 45 degrees from that window. We check it before submission, not after a refusal.
Will I need a Party Wall Agreement for a rear extension?+
Only if your foundations or new walls sit on or near the boundary with a neighbouring property. A straightforward rear extension set within your own plot often does not trigger the Party Wall etc. Act 1996, unlike a Side Return or Wraparound extension, which usually does.
Do I need planning permission for an extension in Merton?+
The interwar semis of Raynes Park and Morden often keep permitted development rights for rear extensions and lofts, so a full application isn't always needed. Conservation areas such as Wimbledon Village, Wimbledon Common and the John Innes estate at Merton Park restrict this. We check your street's designation first and can confirm permitted development with a Lawful Development Certificate.
What is special about building at the John Innes estate in Merton Park?+
The John Innes estate is a planned Arts-and-Crafts conservation area with a distinctive character the council protects closely — materials, proportions and rooflines are all controlled. Permitted development is often restricted there, so we design to the estate's character and prepare a full, context-led application, which is the reliable route to approval.
What do Merton's HMO Article 4 directions affect?+
In designated wards, an Article 4 direction removes permitted development for change of use to an HMO (C3 to C4), so a conversion to a house in multiple occupation needs a full application there. It doesn't affect a standard family extension, but if you are considering an HMO we confirm whether the direction covers your address and use before advising.
How long does Merton Council take to decide?+
Merton determines most householder applications within the statutory eight-week period once validated; Wimbledon and Merton Park conservation cases can involve additional consultation. We prepare submissions to the council's validation checklist to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Merton?+
We agree a fixed fee before starting, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Merton approves. A suburban Raynes Park extension and a Wimbledon Village or Merton Park application differ in the evidence required, so we quote once we understand your address and project rather than by the hour.
Free Fixed Quote

Get your free Merton planning assessment

Tell us your Merton address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.