
Planning Permission in West Kensington W14
Fixed-fee, MCIAT-chartered planning permission for West Kensington (W14) homeowners — London Borough of Hammersmith & Fulham validation and local constraints handled from the start.
West Kensington (W14) is defined by its red-brick Victorian mansion flats — the Gunter family developed much of the district as planned mansion-block and terrace streets, and a large share of the housing is now flats rather than whole houses. That tenure shapes every project: rear, roof and party-wall work here typically touches more than one household.
The Gunter Estate, Barons Court and Sinclair Road conservation areas cover much of the district and protect that planned red-brick character. We establish the conservation boundary, the tenure and the block's shared elements before recommending a route, and draw to the borough's guidance.


Planning in West Kensington (W14): what to know before you apply
W14 sits across the Gunter Estate, Barons Court and Sinclair Road conservation areas, which protect the planned red-brick mansion-flat streets and remove permitted development rights on many of them — and because so much of the stock is flatted, extensions and loft work are assessed against shared roofs, rear elevations and party walls as well as conservation character. London Borough of Hammersmith and Fulham does not publish an Article 4 schedule to the national open-data register, so an empty entry there is not evidence of absence — we confirm the current directions with the council before advising.
Typical West Kensington housing stock
Red-brick late-Victorian mansion flats and tall terraced houses laid out by the Gunter estate, many now subdivided into flats, with further mansion blocks toward Barons Court.
Streets we regularly draw for in West Kensington
Gunterstone Road · Comeragh Road · Gledstanes Road · Sinclair Road · North End Road
What W14 is actually built of
Measured from 412 classified residential buildings in W14, not from a description of the area.
West Kensington W14 housing mix
Residential building form across the W14 postcode district, from 412 classified buildings.
| Attached on more than one side | 78% |
|---|---|
| Attached on one side | 19% |
| Detached | 3% |
| Median building footprint | 74 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 3.83 |
| Buildings classified | 412 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Planning Permission for West Kensington (W14) homes: the package and the process
A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.
Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.
Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
How long does planning permission take, and what does it cost?
Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |

Planning Permission in West Kensington W14 — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for a side-return extension in Hammersmith & Fulham?+
Will I need a Basement Impact Assessment for a basement in Hammersmith & Fulham?+
What is special about the Peterborough Estate 'Lion houses'?+
How long does Hammersmith & Fulham take to decide?+
How much do planning drawings cost in Hammersmith & Fulham?+
Get your free West Kensington planning assessment
Tell us your West Kensington (W14) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.