MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in Lewisham

Single-storey rear extension onto a London garden, a common Lewisham terraced-house project in Brockley or Hither Green
Lewisham · London

Planning Permission in Lewisham

Fixed-fee, MCIAT-chartered planning permission for Lewisham homeowners — London Borough of Lewisham validation and local constraints handled from the start.

Free Lewisham planning assessment

Tell us your Lewisham address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Lewisham is terraced South-East London: the Victorian and Edwardian streets of Brockley, Forest Hill and Hither Green make side-return extensions and hip-to-gable loft conversions the borough's signature projects, giving way to the Georgian-fringed heath at Blackheath, the historic Deptford High Street and the post-war estates around Catford and central Lewisham. The right route depends heavily on the street — a rear extension in Hither Green is a very different application from a roof alteration in the Brockley conservation area.

Design control shapes much of the borough. Conservation areas at Blackheath, Brockley, Telegraph Hill, Deptford High Street, Ladywell and Lee Manor govern materials, rooflines and front elevations, while the dense terraced streets bring side-return and rear-depth control and party-wall sensitivity between neighbours. Sloping sites and long views across the Honor Oak and Forest Hill ridges further shape extension design, and a borough-wide Article 4 direction removes permitted development for change of use to an HMO (C3 to C4) anywhere in the borough — though it leaves standard family extensions and lofts unaffected.

We prepare Lewisham planning drawings to the council's householder and validation standards, checking permitted development eligibility for terraces and semis first and designing to conservation-area expectations where Blackheath, Brockley or Telegraph Hill applies. It is the same council-accepted drawing set an architect would produce, usually at around 30% less, with a fixed fee agreed up front, a roughly seven-day drawing turnaround and free redraws until the London Borough of Lewisham approves. Most householder applications are decided within the statutory eight-week period once validated, so we draw to the validation checklist from the outset to avoid the queries that cause most delay.

Single-storey rear extension onto a London garden, a common Lewisham terraced-house project in Brockley or Hither Green
Isometric illustration of a Lewisham home extension design
Proposed floor plan
Lewisham

Planning in Lewisham: what to know before you apply

Lewisham operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and controls design within its conservation areas — Blackheath, Brockley and Telegraph Hill in particular. For the borough's abundant terraces, side-returns and hip-to-gable lofts frequently qualify as permitted development; we confirm the designation for your street before drawing.

Typical Lewisham housing stock

Victorian and Edwardian terraces across Brockley, Forest Hill and Hither Green, Georgian and early-Victorian housing around Blackheath and Deptford, and post-war estate housing through Catford and central Lewisham.

Areas we regularly draw for in Lewisham

Lewisham · Deptford · Brockley · Forest Hill · Catford · Sydenham · Hither Green · Blackheath

What the numbers say about Lewisham planning decisions

These are London Borough of Lewisham’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

Householder decisions in Lewisham

Every householder application London Borough of Lewisham decided over the four quarters to 2026 Q1.

Householder applications decided637
Granted576
Refused61
GrantedEngland average 90%90%
Of which prior approvalsPrior approvals are granted far more often than full applications, so this share moves the rate above27%
Decided within 8 weeksExcludes prior approvals. England average 93%95%

Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

Permitted development in Lewisham

Larger householder extensions put to London Borough of Lewisham under the prior-approval route, and lawful-development certificates decided, over eight quarters.

Prior approval not requiredWent ahead without a full application103
Prior approval granted4
Prior approval refused71
Granted where a decision was neededFrom 75 determinations5%
Building upwards, prior approval refused1
Certificates of lawful development decided752

Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

Designated areas in Lewisham

Conservation areas London Borough of Lewisham has published to the national register, and when it designated them. Where a borough has supplied no Article 4 data the row is omitted rather than shown as zero.

Conservation areas on the register30
Article 4 directions in force57

Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.

If London Borough of Lewisham refuses: appeal outcomes

Planning appeals against London Borough of Lewisham determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.

Appeals determined427
Allowed115
Dismissed312
Householder appeals allowedFrom 164 householder appeals. England average 36%30%

Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.

Planning Permission for Lewisham homes: the package and the process

A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.

Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.

Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

How long does planning permission take, and what does it cost?

Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
Sheet from a planning permission package prepared for a Lewisham property, drawn to London Borough of Lewisham validation standards
A sheet from the planning permission package we submit to London Borough of Lewisham.
FAQ

Planning Permission in Lewisham — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for a side-return extension in Lewisham?+
On the Victorian and Edwardian terraces of Brockley, Forest Hill and Hither Green a single-storey side-return or rear extension can fall within permitted development, so a full application isn't always needed. Conservation areas such as Blackheath, Brockley and Telegraph Hill restrict this. We check your street's designation first and can confirm permitted development with a Lawful Development Certificate where it qualifies.
What does Lewisham's borough-wide HMO Article 4 direction affect?+
Lewisham applies a borough-wide Article 4 direction removing permitted development rights for change of use to an HMO (C3 to C4), so a conversion to a house in multiple occupation needs a full application anywhere in the borough. It doesn't affect a standard family extension or loft, but we confirm whether it applies to your intended use before advising on a route.
Can I convert the loft on my Lewisham terrace?+
Usually, yes. The terraces of Brockley, Forest Hill and Hither Green suit hip-to-gable and dormer loft conversions, which frequently qualify as permitted development within the volume limits. Outside the conservation areas this is often the quickest route. We confirm eligibility against those limits and any designation, then produce the planning and building-regulations drawings.
How long does Lewisham Council take to decide?+
Lewisham determines most householder applications within the statutory eight-week period once validated; conservation cases can attract additional consultation. The dense terraced streets are party-wall-sensitive, so the commonest delay is a drawing query — we prepare submissions to the council's validation checklist to keep them moving.
How much do planning drawings cost in Lewisham?+
We agree a fixed fee before starting, usually around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Lewisham approves. A side-return, a loft and a conservation-area scheme differ in complexity, so we quote once we understand your street and project rather than charging by the hour.
Free Fixed Quote

Get your free Lewisham planning assessment

Tell us your Lewisham address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.