MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportPlanning Permission in Lee SE12

Loft conversion drawings for a Victorian villa in Lee SE12, Lewisham
Lee · SE12 · Lewisham

Planning Permission in Lee SE12

Fixed-fee, MCIAT-chartered planning permission for Lee (SE12) homeowners — London Borough of Lewisham validation and local constraints handled from the start.

Free Lee planning assessment

Tell us your Lee (SE12) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Lee (SE12) is built around the Victorian villas and terraces of the Lee Manor Conservation Area, running from Old Road down to Lee station, and most of our projects here are rear extensions and loft conversions on that period stock.

Article 4 protection targets the French-mansard houses on Micheldever Road, so we check whether your street is inside the conservation area or covered by the direction before deciding between permitted development and a full householder application.

Loft conversion drawings for a Victorian villa in Lee SE12, Lewisham
Isometric illustration of a Lee SE12 home planning permission design
Proposed floor plan
Lee SE12

Planning in Lee (SE12): what to know before you apply

Outside the conservation area many lofts and rear extensions remain permitted development, but the Lee Manor designation and the Micheldever Road Article 4 direction can require a householder application. We confirm your address status and draw to Lewisham standards.

Typical Lee housing stock

Lee Manor keeps substantial Victorian villas and terraces between Old Road and Lee station, including the distinctive French-mansard houses on Micheldever Road, with later inter-war and post-war housing around Burnt Ash Road.

Streets we regularly draw for in Lee

Micheldever Road · Manor Lane · Old Road · Northbrook Road

What SE12 is actually built of

Measured from 251 classified residential buildings in SE12, not from a description of the area.

Lee SE12 housing mix

Residential building form across the SE12 postcode district, from 251 classified buildings.

Attached on more than one side42%
Attached on one side52%
Detached6%
Median building footprint62 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate1.4
Buildings classified251

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.

Planning Permission for Lee (SE12) homes: the package and the process

A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.

Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.

Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.

Do I need planning permission for an extension in London?

Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.

Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.

Permitted development vs a full planning application

Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.

Article 4 directions and conservation areas

If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.

How do you apply for planning permission through the London Planning Portal?

We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.

Phase 1 — existing and proposed site surveys

A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.

Phase 2 — technical drawing package

Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.

Phase 3 — liaison with the planning officer

We answer the council's queries, negotiate amendments, and redraw free until the decision lands.

How long does planning permission take, and what does it cost?

Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.

Typical fixed-fee planning drawing packages
PackageProduction windowCompliance layerTypical fee
Permitted Development pack7–10 working daysLawful Development Certificate submission£950–£1,450
Full Planning pack10–14 working daysCouncil liaison & design statement£1,600–£2,400
Planning + Building Regs pack14–21 working daysStructural calculations included£2,200–£3,850
Sheet from a planning permission package drawn for a Lee property in SE12, showing the existing and proposed arrangement at scale
A sheet from the planning permission package we submit to London Borough of Lewisham for Lee (SE12) properties.
FAQ

Planning Permission in Lee SE12 — FAQs

How long does it take to get planning permission from a London council?+
Householder applications carry a statutory 8-week determination period. We deliver your drawings within about 7 days of survey, so the council clock can start quickly. Lawful Development Certificates usually resolve faster.
What happens if the council refuses?+
Refusals are rare because every drawing is checked against your borough's local plan before submission. If it happens we advise on revisions or handle the appeal — many refusals recover at appeal.
Do you cover my borough?+
Yes — we submit across all 33 London boroughs every week. Each borough has its own page covering local conservation, Article 4 and validation quirks.
Is the fee really fixed?+
Yes. We quote a fixed fee before we start and it does not move, even when the council asks for revisions — those redraws are free.
Do I need planning permission for a side-return extension in Lewisham?+
On the Victorian and Edwardian terraces of Brockley, Forest Hill and Hither Green a single-storey side-return or rear extension can fall within permitted development, so a full application isn't always needed. Conservation areas such as Blackheath, Brockley and Telegraph Hill restrict this. We check your street's designation first and can confirm permitted development with a Lawful Development Certificate where it qualifies.
What does Lewisham's borough-wide HMO Article 4 direction affect?+
Lewisham applies a borough-wide Article 4 direction removing permitted development rights for change of use to an HMO (C3 to C4), so a conversion to a house in multiple occupation needs a full application anywhere in the borough. It doesn't affect a standard family extension or loft, but we confirm whether it applies to your intended use before advising on a route.
Can I convert the loft on my Lewisham terrace?+
Usually, yes. The terraces of Brockley, Forest Hill and Hither Green suit hip-to-gable and dormer loft conversions, which frequently qualify as permitted development within the volume limits. Outside the conservation areas this is often the quickest route. We confirm eligibility against those limits and any designation, then produce the planning and building-regulations drawings.
How long does Lewisham Council take to decide?+
Lewisham determines most householder applications within the statutory eight-week period once validated; conservation cases can attract additional consultation. The dense terraced streets are party-wall-sensitive, so the commonest delay is a drawing query — we prepare submissions to the council's validation checklist to keep them moving.
How much do planning drawings cost in Lewisham?+
We agree a fixed fee before starting, usually around 30% below an architect's fee for the same council-accepted drawings, with free redraws until Lewisham approves. A side-return, a loft and a conservation-area scheme differ in complexity, so we quote once we understand your street and project rather than charging by the hour.
Free Fixed Quote

Get your free Lee planning assessment

Tell us your Lee (SE12) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.