
Planning Permission in Hayes BR2
Fixed-fee, MCIAT-chartered planning permission for Hayes (BR2) homeowners — London Borough of Bromley validation and local constraints handled from the start.
Hayes (BR2) is a green, low-density corner of the borough with roomy interwar detached and semi-detached homes, plus older village-core properties near Hayes station. The space on these plots lends itself to large rear extensions, two-storey side additions, garden rooms and loft conversions, most handled through Bromley's standard householder route.
The historic Hayes Village conservation area and the surrounding commons give the neighbourhood its identity and bring tighter control on materials, roofscape and anything affecting the open green setting. We design extensions that keep the generous plot gaps and building line intact and check tree protection near the commons, so schemes meet Bromley Council's conservation and amenity standards.


Planning in Hayes (BR2): what to know before you apply
No published householder Article 4 direction in Hayes, so most work runs under permitted development or a standard Bromley householder application. Properties within the Hayes Village conservation area have reduced permitted-development rights, and plots near the commons face added scrutiny on trees, footprint and the protected green outlook.
Typical Hayes housing stock
Hayes (BR2) is a leafy outer south-east suburb of generous interwar detached and semi-detached houses on wide plots, with older Victorian and cottage-style properties clustered around the historic village. Large gardens backing onto or near Hayes and Keston Commons make substantial rear and two-storey side extensions common.
Streets we regularly draw for in Hayes
Pickhurst Rise · Warren Road · Hawes Lane · The Knoll
What BR2 is actually built of
Measured from 264 classified residential buildings in BR2, not from a description of the area.
Hayes BR2 housing mix
Residential building form across the BR2 postcode district, from 264 classified buildings.
| Attached on more than one side | 27% |
|---|---|
| Attached on one side | 48% |
| Detached | 25% |
| Median building footprint | 76 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.37 |
| Buildings classified | 264 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Planning Permission for Hayes (BR2) homes: the package and the process
A householder application is refused validation far more often than it is refused permission, and almost always for the same reasons: a location plan at the wrong scale, no red line around the application site, a missing ownership certificate, or elevations that do not show every face of the building affected. We prepare the full submission set — location plan, block plan, existing and proposed floor plans, elevations and sections — so the case officer receives a complete case on day one.
Once the application is live we stay on it. Officers routinely come back with questions about materials, boundary treatment or a dimension they cannot read off the drawings, and a fast, drawn answer is usually the difference between a decision inside the statutory period and a request to withdraw and resubmit.
Which route applies is decided by the building before it is decided by policy. A house that has never been extended usually has allowances left to use; a flat, a listed building or a home in a conservation area often has none, and the same drawing set then has to make a design case rather than a compliance one.
Do I need planning permission for an extension in London?
Many single-storey rear extensions, loft conversions and outbuildings fall under permitted development rights and do not need a full planning application — but London's dense housing stock, conservation areas and Article 4 directions frequently withdraw those rights. Before you pay for a full application, we check your property against the current permitted development thresholds and your borough's local constraints.
Where permitted development applies, we recommend a Lawful Development Certificate instead of full planning — it is faster, cheaper and gives you a legal document confirming the work was lawful. Where a full application is genuinely required, we prepare it properly the first time.
Permitted development vs a full planning application
Permitted development lets you build within defined volumetric limits without committee review. A full householder application is assessed against the borough's local plan for scale, daylight, neighbour impact and design. We advise which route your project qualifies for and why.
Article 4 directions and conservation areas
If your home sits in a conservation area or under an Article 4 direction, permitted development rights are often removed — meaning even modest changes need consent. Each borough page lists the local directions and conservation areas we routinely design around.
How do you apply for planning permission through the London Planning Portal?
We manage the full lifecycle of your submission — survey, drawings, supporting documents and officer liaison — so you never have to decode a validation checklist yourself.
Phase 1 — existing and proposed site surveys
A laser-measured survey captures your property exactly, so existing and proposed drawings match reality millimetre for millimetre.
Phase 2 — technical drawing package
Site location plan, block plan, floor plans, elevations and sections drawn to your borough's scale and formatting requirements, with a design and access statement where needed.
Phase 3 — liaison with the planning officer
We answer the council's queries, negotiate amendments, and redraw free until the decision lands.
How long does planning permission take, and what does it cost?
Drawings are typically ready within 7 days of survey. Your council then has a statutory 8 weeks to decide a householder application. Our drawing fees are fixed and quoted upfront — the table below shows typical packages.
| Package | Production window | Compliance layer | Typical fee |
|---|---|---|---|
| Permitted Development pack | 7–10 working days | Lawful Development Certificate submission | £950–£1,450 |
| Full Planning pack | 10–14 working days | Council liaison & design statement | £1,600–£2,400 |
| Planning + Building Regs pack | 14–21 working days | Structural calculations included | £2,200–£3,850 |

Planning Permission in Hayes BR2 — FAQs
How long does it take to get planning permission from a London council?+
What happens if the council refuses?+
Do you cover my borough?+
Is the fee really fixed?+
Do I need planning permission for an extension in Bromley?+
Can I build a bigger extension because Bromley plots are larger?+
How does green-belt designation affect my Bromley project?+
How long does Bromley Council take to decide?+
How much do planning drawings cost in Bromley?+
Get your free Hayes planning assessment
Tell us your Hayes (BR2) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.