
Planning permission in Bow, E3
Planning permission for a home in Bow E3 is decided by Tower Hamlets Council, which granted 93% of its householder decisions in the four quarters to 2026 Q2. A daylight assessment is not part of a standard householder application. We draw the plans from £745.
Fixed fee from £545 drawings + £200 survey (£745 total) · all prices
Prefer to talk it through?
Who decides, and how Tower Hamlets has been deciding
Bow sits in the London Borough of Tower Hamlets, so the figures below are the council's, not Bow's alone.
Tower Hamlets made 191 householder decisions in the four quarters to 2026 Q2, including prior approvals (our analysis of MHCLG planning application statistics, table PS2).
Of those householder decisions, 93% were grants (our analysis of MHCLG planning application statistics, table PS2), and 93% of the householder decisions that were not prior approvals were made within 8 weeks (our analysis of MHCLG planning application statistics, table PS2). The 8 weeks is the statutory period under article 34(2)(b) of the DMPO 2015.
Daylight, and streets around Tredegar
A householder application normally goes in with scaled plans and elevations, not with a daylight report. A council can ask for more if a proposal sits close to a neighbour's windows, and its local validation list says when. Read it before you submit.
If your street is near Tredegar Square or Tredegar Road, check the council's conservation area map first, because designation changes what you can build and what the officer will look for.
Daylight to a neighbour is a planning matter. A neighbour's separate legal right to light is not decided by the council. We draw the scheme; if a specialist daylight or rights-of-light study looks necessary, tell us when you enquire and we will say so in the quote.


The council's householder fee is £548 from 1 April 2026 (SI 2012/2920, Schedule 1 Part 2, category 6(1), as annually indexed).
Conservation areas and Article 4 directions in and around E3
Tower Hamlets appears 61 times on the national conservation-area register (our analysis of the MHCLG Planning Data Platform conservation-area dataset, snapshot of 14 Aug 2026).
Around the centre of the E3 postcode district we found 9 live Article 4 direction area entries (our analysis of the MHCLG Planning Data Platform article 4 direction area dataset, retrieved 15 Oct 2026). The register is incomplete, so treat that as a minimum. Our Article 4 direction glossary entry and the London Article 4 guide explain what such a direction takes away.
Appeals
Of 66 householder appeals decided on Tower Hamlets decisions between 2021 and 2026, 24% were allowed (our analysis of the Planning Inspectorate Casework Database, release 2609). The borough-wide picture is on our Tower Hamlets planning permission page.

Cost
The council's householder fee is £548 from 1 April 2026 (SI 2012/2920, Schedule 1 Part 2, category 6(1), as annually indexed). We charge from £745 for the planning drawings, and our pricing page shows the rest.
Sources
Every figure on this page, where it comes from and a link to the original.
| Figure | Source | Link |
|---|---|---|
| 191 | Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2) | www.gov.uk |
| 93% | Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2) | www.gov.uk |
| 93% | Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2) | www.gov.uk |
| 66 | Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609)) | www.gov.uk |
| 24% | Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609)) | www.gov.uk |
| 61 | Our analysis of MHCLG Planning Data Platform conservation-area and article-4-direction datasets (bulk snapshot retrieved 14 Aug 2026) | www.planning.data.gov.uk |
| 9 | Our analysis of MHCLG Planning Data Platform article-4-direction-area dataset (entity API, retrieved 15 Oct 2026) | www.planning.data.gov.uk |
| 8 weeks | DMPO 2015 art 34(2)(b): decision period for an application that is not major development (source wording: 8 weeks beginning with the day immediately following receipt) | www.legislation.gov.uk |
| £548 | Statutory fee from 1 April 2026, SI 2012/2920 Sch 1 Pt 2 category 6(1): householder application for alterations or extensions to a single dwellinghouse | assets.publishing.service.gov.uk |
| £745 | DrawingsDirect starting fixed fee for planning drawings, from the published price list | drawingsdirect.co.uk |
Questions people ask
Do I need a daylight assessment for a Bow extension?
Which council handles planning for E3?
Is my Bow street in a conservation area?
Photographs: Christopher Hilton (CC BY-SA 2.0).