
Planning Drawings in New Malden KT3
Fixed-fee, MCIAT-chartered planning drawings for New Malden (KT3) homeowners — Royal Borough of Kingston upon Thames validation and local constraints handled from the start.
New Malden (KT3) grew as a Victorian railway suburb after New Malden Station opened in 1846, and today the tree-named streets of The Groves conservation area preserve that late-Victorian semi-detached character.
KT3 also holds the Presburg Road conservation area, a compact estate of 'Queen Anne' and Renaissance-style houses laid out in the 1880s where alterations are judged against the original frontage detailing.


Planning in New Malden (KT3): what to know before you apply
Houses inside New Malden's The Groves and Presburg Road conservation areas are assessed against a consistent late-Victorian character, so extensions need to respect the semi-detached rhythm and original detailing. No householder Article 4 direction is confirmed for KT3 and Kingston publishes none to the national register, so verify rights on the council's Article 4 map.
Typical New Malden housing stock
Late-Victorian semi-detached and terraced houses built after New Malden Station opened in 1846, from the tree-named streets of The Groves to the 'Queen Anne' and Renaissance-style villas of the Presburg Road estate laid out by the London and Suburban Land Company in the 1880s.
Streets we regularly draw for in New Malden
Lime Grove · Chestnut Grove · Presburg Road · Westbury Road
What KT3 is actually built of
Measured from 366 classified residential buildings in KT3, not from a description of the area.
New Malden KT3 housing mix
Residential building form across the KT3 postcode district, from 366 classified buildings.
| Attached on more than one side | 33% |
|---|---|
| Attached on one side | 52% |
| Detached | 15% |
| Median building footprint | 73 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.26 |
| Buildings classified | 366 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Planning Drawings for New Malden (KT3) homes: the package and the process
A planning set is judged as a set, not as individual sheets. Every existing drawing needs its proposed counterpart at the same scale and orientation so the officer can read the change at a glance, each sheet needs its own number, title, scale bar and north point, and the whole package needs to survive being printed at A3 without a dimension becoming illegible.
We draw to the conventions validation teams expect: plans and elevations at 1:100 or 1:50, a location plan at 1:1250 with the site edged red, a block plan at 1:500, and sections cut where the change in level or roof form actually happens rather than where they are easiest to draw.
The drawing list itself changes with the building. A detached house needs four elevations; a mid-terrace needs two plus a section through the party walls to show what is not visible from outside. Getting that list right at the start is what stops a validation officer asking for a sheet three weeks in.
What is included in a planning drawing set?
A council will only validate an application that contains the right drawings at the right scale. Our standard planning set covers everything a London validation team expects.
- Site location plan (1:1250) and block plan (1:500)
- Existing floor plans, elevations and sections
- Proposed floor plans, elevations and sections
- Roof plans where relevant, with heights and materials annotated
- A design and access or heritage statement where the borough requires one
How are planning drawings different from building regulations drawings?
Planning drawings show what the building will look like and how it sits in its context. Building regulations drawings show how it will be built safely — structure, insulation, fire escape and drainage. Most projects need both; our Complete package covers the two together with structural calculations coordinated in-house.
How quickly can you produce planning drawings in London?
After a laser survey, a standard householder set is typically ready within 7 days. We review every drawing against your borough's validation checklist before it reaches a planner's desk, which is why our first-time approval rate sits around 96%.
| Drawing | Typical scale | What it shows |
|---|---|---|
| Site location plan | 1:1250 | The property in its street context, site edged red |
| Block plan | 1:500 | The building's footprint and position in the plot |
| Floor plans (existing & proposed) | 1:100 / 1:50 | Room layout, walls, openings and the proposed changes |
| Elevations (existing & proposed) | 1:100 / 1:50 | Each face of the building and how it changes |
| Sections | 1:100 / 1:50 | A cut through showing heights, levels and roof form |

Planning Drawings in New Malden KT3 — FAQs
What scale should London planning drawings be?+
Do I need an architect to produce planning drawings?+
How many revisions are included in the fee?+
Can you draw from my existing plans?+
Do planning drawings guarantee approval?+
Do I need planning permission for an extension in Kingston?+
My Kingston home is near the river — does flood risk affect my plans?+
Can I build a larger extension on a Coombe plot?+
How long does the Royal Borough of Kingston take to decide?+
How much do planning drawings cost in Kingston?+
Get your free New Malden planning assessment
Tell us your New Malden (KT3) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.