
Planning Drawings in Gidea Park RM2
Fixed-fee, MCIAT-chartered planning drawings for Gidea Park (RM2) homeowners — London Borough of Havering validation and local constraints handled from the start.
Gidea Park (RM2) is one of Havering's most tightly protected neighbourhoods — a designated garden suburb of detached architect-designed houses where the Gidea Park Conservation Area carries a confirmed Article 4 direction. That direction removes the permitted development rights most homeowners rely on, so alterations here almost always need a formal application.
Because the estate's character rests on generous plots, deep gardens and consistent building lines, Havering scrutinises anything that disrupts that rhythm. We prepare drawings to the conservation-area appraisal and the Article 4 control levels so extensions, dormers and even window or boundary changes are presented in a form the borough will accept.


Planning in Gidea Park (RM2): what to know before you apply
Unlike most of Havering, Gidea Park has a confirmed Article 4 direction (Art4/4/2015) covering the whole conservation area, so permitted development rights are withdrawn under Control Level 1 or 2. Assume nearly all external householder work needs express planning consent and design that respects the garden-suburb layout.
Typical Gidea Park housing stock
Almost entirely detached houses on generous plots, many by named Arts-and-Crafts-era architects from the 1910-11 exhibition estates, set on wide tree-lined roads with deep front gardens and mature planting.
Streets we regularly draw for in Gidea Park
Reed Pond Walk · Meadway · Heath Drive · Balgores Lane
What RM2 is actually built of
Measured from 138 classified residential buildings in RM2, not from a description of the area.
Gidea Park RM2 housing mix
Residential building form across the RM2 postcode district, from 138 classified buildings.
| Attached on more than one side | 29% |
|---|---|
| Attached on one side | 52% |
| Detached | 19% |
| Median building footprint | 84 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 1.47 |
| Buildings classified | 138 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
Planning Drawings for Gidea Park (RM2) homes: the package and the process
A planning set is judged as a set, not as individual sheets. Every existing drawing needs its proposed counterpart at the same scale and orientation so the officer can read the change at a glance, each sheet needs its own number, title, scale bar and north point, and the whole package needs to survive being printed at A3 without a dimension becoming illegible.
We draw to the conventions validation teams expect: plans and elevations at 1:100 or 1:50, a location plan at 1:1250 with the site edged red, a block plan at 1:500, and sections cut where the change in level or roof form actually happens rather than where they are easiest to draw.
The drawing list itself changes with the building. A detached house needs four elevations; a mid-terrace needs two plus a section through the party walls to show what is not visible from outside. Getting that list right at the start is what stops a validation officer asking for a sheet three weeks in.
What is included in a planning drawing set?
A council will only validate an application that contains the right drawings at the right scale. Our standard planning set covers everything a London validation team expects.
- Site location plan (1:1250) and block plan (1:500)
- Existing floor plans, elevations and sections
- Proposed floor plans, elevations and sections
- Roof plans where relevant, with heights and materials annotated
- A design and access or heritage statement where the borough requires one
How are planning drawings different from building regulations drawings?
Planning drawings show what the building will look like and how it sits in its context. Building regulations drawings show how it will be built safely — structure, insulation, fire escape and drainage. Most projects need both; our Complete package covers the two together with structural calculations coordinated in-house.
How quickly can you produce planning drawings in London?
After a laser survey, a standard householder set is typically ready within 7 days. We review every drawing against your borough's validation checklist before it reaches a planner's desk, which is why our first-time approval rate sits around 96%.
| Drawing | Typical scale | What it shows |
|---|---|---|
| Site location plan | 1:1250 | The property in its street context, site edged red |
| Block plan | 1:500 | The building's footprint and position in the plot |
| Floor plans (existing & proposed) | 1:100 / 1:50 | Room layout, walls, openings and the proposed changes |
| Elevations (existing & proposed) | 1:100 / 1:50 | Each face of the building and how it changes |
| Sections | 1:100 / 1:50 | A cut through showing heights, levels and roof form |

Planning Drawings in Gidea Park RM2 — FAQs
What scale should London planning drawings be?+
Do I need an architect to produce planning drawings?+
How many revisions are included in the fee?+
Can you draw from my existing plans?+
Do planning drawings guarantee approval?+
Do I need planning permission for an extension in Havering?+
How does green-belt land affect my Havering project?+
Can I build a bigger extension because Havering plots are larger?+
How long does Havering Council take to decide?+
How much do planning drawings cost in Havering?+
Get your free Gidea Park planning assessment
Tell us your Gidea Park (RM2) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.