MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex
25 Eccleston Place, Victoria, London SW1W 9NFhello@drawingsdirect.co.uk020 7864 7245WhatsApp

Free 2026 London Planning Report — New build drawings in Palmers Green

Edwardian gabled houses on a residential street with spring blossom
Palmers Green · N13 · Enfield

New build drawings in Palmers Green

Looking for new homes in Palmers Green? We do not sell property: we draw new houses for owners who are building one, and Enfield Council decides the application. Our planning drawings start from £1,450, with heights, distances and window positions set out clearly, because a daylight objection tends to turn on them.

Fixed fee from £1,250 drawings + £200 survey (£1,450 total) · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

Why daylight objections come up

A new house next to existing homes changes what neighbours see from their windows. When someone objects on daylight grounds, the case officer looks at the sections and elevations to judge the effect. Clear, dimensioned sections therefore do real work in an application. A formal daylight assessment, if requested, is a surveyor's report, and a private right of light is a separate legal question; neither is something we calculate.

Our planning drawings page explains what the standard set shows, and the measured building survey page explains how neighbouring heights and levels are recorded.

Enfield by the numbers

Enfield decided 1,919 planning applications in the four quarters to 2026 Q2 (our analysis of MHCLG planning application statistics, table PS2).

Appeals give a longer view: 33% of the 624 planning appeals decided since 2021 were allowed (our analysis of the Planning Inspectorate Casework Database). The planning appeal glossary entry sets out when an appeal is worth considering.

Flat-fronted stock brick terrace with brightly painted front doors
Long terrace of brick cottages leading to a church tower

Enfield decided 1,919 planning applications in the four quarters to 2026 Q2 (our analysis of MHCLG planning application statistics, table PS2).

Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2). www.gov.uk

Conservation areas and the extra statement

Enfield accounts for 24 live entries in the national planning data platform's conservation-area records (our analysis of the MHCLG Planning Data Platform conservation-area dataset); whether your Palmers Green plot is inside one is shown on Enfield's conservation area map. A design and access statement is required for development of one or more dwellings in one, according to government guidance. Our planning permission page covers the rest of the application.

Time and cost

The council has 8 weeks for an application that is not major development and 13 weeks for major development (article 34). Its fee is £610 per dwellinghouse for a full application for fewer than ten dwellinghouses. Our drawings start from £1,450; compare them with other fixed fees on the pricing page.

DrawingsDirect sample planning sheet with proposed plans and elevations at 1:100 and a site plan at 1:500
Sample drawing
Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
1,919Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
624Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
33%Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
24Our analysis of MHCLG Planning Data Platform conservation-area and article-4-direction datasets (bulk snapshot retrieved 14 Aug 2026)www.planning.data.gov.uk
£610Statutory fee from 1 April 2026, SI 2012/2920 Sch 1 Pt 2 category 1(3)(a): full application for the erection of fewer than 10 dwellinghouses, per dwellinghouseassets.publishing.service.gov.uk
8 weeksDMPO 2015 art 34(2)(b): decision period for an application that is not major development (source wording: 8 weeks beginning with the day immediately following receipt)www.legislation.gov.uk
13 weeksDMPO 2015 art 34(2)(a): decision period for major development (source wording: 13 weeks beginning with the day immediately following receipt)www.legislation.gov.uk
one or more dwellingsPlanning practice guidance, Making an application, paragraph 030 (ID 14-030-20140306): design and access statement required in a conservation area or World Heritage Site for development of one or more dwellingswww.gov.uk
£1,450DrawingsDirect starting fixed fee for new build drawings, from the published price listdrawingsdirect.co.uk
FAQ

Questions people ask

Can neighbours' daylight objections stop a new house in Palmers Green?
They are weighed by the case officer alongside other issues. They do not automatically decide the case.
Do you produce daylight assessments?
No. A surveyor does that. Our measured drawings give them what they need.
How many planning decisions did Enfield make?
1,919 in the four quarters to 2026 Q2, across all application types.