Planning appeals: what they are and how a householder appeal works
A planning appeal asks the Planning Inspectorate to review a council's refusal of your application. For a householder refusal you have 12 weeks from the date on the decision letter, or 28 days if an enforcement notice was received first. In London, 40% of householder appeals decided since 2021 were allowed.
Prefer to talk it through?
The deadline starts on the date of the decision letter
The clock runs from the date printed on the decision letter, not from the day it reaches you. GOV.UK says a householder appeal can be made for up to 12 weeks from that date (appeal a householder planning decision).
There is one shorter route. If an enforcement notice was received before the application was refused, the deadline is 28 days from the date on the decision letter. Check the dates on every letter the council has sent before you plan around the longer period.
What the London appeal record shows
Our analysis of the Planning Inspectorate Casework Database (released 1 October 2026, Casework Database 2609) counts 7,337 householder appeals decided as allowed or dismissed across the 33 London councils, for decisions from 2021 to 2026. Of those, 40% were allowed.
Across every type of appeal in the same period, 33% were allowed: 5,842 of 17,877 decided. Householder cases are allowed more often than the all-types average, but 60% were still dismissed. These figures describe the past. They do not forecast what an inspector will decide on your house.
A London-wide figure is only a starting point. Our borough pages show each council's own record.


Our analysis of the Planning Inspectorate Casework Database (released 1 October 2026, Casework Database 2609) counts 7,337 householder appeals decided as allowed or dismissed across the 33 London councils, for decisions from 2021 to 2026.
Appeal, or redraw and reapply?
A householder appeal is decided on the drawings the council refused, so the plans cannot be improved part-way through. If the refusal reasons point to something you could change, such as the depth of an extension or the roof form, a revised application can be quicker. The council has 8 weeks from the day after receipt to decide a non-major application (DMPO 2015, article 34(2)(b)), unless you agree a longer period in writing.
An appeal suits a case where you think the council misread the policy or gave the harm too much weight, and the design is one you want to keep. Read the officer's report first. It shows what the refusal rested on, and whether the objection was to the design or to a missing document.
What an appeal file needs
You send the Inspectorate the application drawings, the decision notice, and a short statement that answers each reason for refusal in turn. A clear statement that quotes the policy and points to the plan sheet does more than a long one.
If the refusal followed a poor set of plans, the fix is often drawing quality rather than argument. Our planning drawings service prepares the plans, elevations and block plan, and our guide to the planning appeal process walks through the steps in order.

If the work is already built
An appeal is for a refused application. Work built without permission follows a different path, usually a retrospective application, which we cover in our guide to retrospective planning permission. Tell us what stage you are at and we will say which route fits.
Sources
Every figure on this page, where it comes from and a link to the original.
| Figure | Source | Link |
|---|---|---|
| 12 weeks | GOV.UK, Appeal a householder planning decision: you can appeal up to 12 weeks from the date on the decision letter (source wording: "you can appeal for up to 12 weeks from the date on the decision letter") | www.gov.uk |
| 28 days | GOV.UK, Appeal a householder planning decision: if an enforcement notice was received before the application was refused, the appeal deadline is 28 days (source wording: "you have 28 days from the date on your decision letter to appeal") | www.gov.uk |
| 7,337 | Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609)) | www.gov.uk |
| 40% | Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609)) | www.gov.uk |
| 33% | Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609)) | www.gov.uk |
| 8 weeks | DMPO 2015 art 34(2)(b): decision period for an application that is not major development (source wording: "8 weeks beginning with the day immediately following that on which the application is received") | www.legislation.gov.uk |