MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportNew Build Drawings in Isle of Dogs E14

Flat reconfiguration and conversion drawings on the Isle of Dogs E14, Tower Hamlets Council Docklands
Isle of Dogs · E14 · Tower Hamlets

New Build Drawings in Isle of Dogs E14

Fixed-fee, MCIAT-chartered new build drawings for Isle of Dogs (E14) homeowners — London Borough of Tower Hamlets validation and local constraints handled from the start.

Free Isle of Dogs planning assessment

Tell us your Isle of Dogs (E14) address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

The Isle of Dogs in E14 is defined by Canary Wharf's towers and modern new-build flats, with surviving dock-side terraces at Coldharbour and Chapel House, so most schemes are flat reconfigurations, change-of-use and layout improvements rather than extensions.

The high-density townscape and dockland conservation pockets require careful daylight, overlooking and character judgement, so we prepare drawings to Tower Hamlets Council's standard for reconfiguration and change-of-use applications.

Flat reconfiguration and conversion drawings on the Isle of Dogs E14, Tower Hamlets Council Docklands
Isometric illustration of a Isle of Dogs E14 home new build drawings design
Proposed floor plan
Isle of Dogs E14

Planning in Isle of Dogs (E14): what to know before you apply

No published householder Article 4 direction governs these streets, but the Coldharbour and Chapel House conservation areas protect the historic dock terraces, and the dense flatted context means overlooking and amenity are the key planning tests.

Typical Isle of Dogs housing stock

The Isle of Dogs is dominated by Canary Wharf towers and modern new-build flats, with pockets of period and dock-worker terraces at Coldharbour and Chapel House. Most work is internal reconfiguration and change-of-use within the flatted stock rather than external extension.

Streets we regularly draw for in Isle of Dogs

East Ferry Road · Millharbour · Glengall Grove · Stewart Street

What E14 is actually built of

Measured from 390 classified residential buildings in E14, not from a description of the area.

Isle of Dogs E14 housing mix

Residential building form across the E14 postcode district, from 390 classified buildings.

Attached on more than one side69%
Attached on one side24%
Detached8%
Median building footprint50 m²
Addresses per buildingAbove about 2 means flats and maisonettes dominate4.62
Buildings classified390

Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.

New Build Drawings for Isle of Dogs (E14) homes: the package and the process

A new dwelling is a full application rather than a householder one, and the drawing set reflects that: site layout with levels and boundaries, floor plans and elevations for the new building, sections showing how it sits in the ground, and street-scene elevations placing it against what is already there.

Two packages follow the approval — the planning set and the construction set — and they have to stay in step. Foundation design, drainage strategy, thermal performance and fire strategy are drawn for Building Control against the same geometry that was granted permission, so the built house matches the approved one.

An infill plot is designed against its neighbours. Plot width, the building line either side, and the ridge heights next door set what the new house can be — and on a tight urban site those constraints usually shape the design more than the brief does.

Is my plot suitable for a new build in London?

A feasibility assessment looks at plot size and shape, access, existing boundary conditions, relevant planning policy for the borough, and the likely impact of a new dwelling on neighbouring properties before any design work begins. Infill plots — a gap between existing buildings on a street — and backland plots — a garden or yard site behind existing houses, reached by a shared access — each raise different issues: infill schemes are usually judged on how well they match the scale, spacing and character of the street, while backland schemes are judged heavily on overlooking, garden loss for neighbours, and whether the access arrangement is acceptable. A feasibility study gives an honest view of whether a scheme is likely to succeed before you commit to full drawings.

What does pre-application advice add to a new build project?

Pre-application advice is a formal, paid process most London boroughs offer, where planning officers give written feedback on a proposed scheme before a full application is submitted. For a new build — where the principle of development itself is often the main issue, not just the design details — this feedback can be invaluable: it surfaces concerns around density, massing, daylight and sunlight or heritage context early enough to be addressed in the drawings, rather than discovered for the first time as a refusal reason months into a full application. We prepare and submit pre-application enquiries as part of the new build service where it is likely to strengthen the eventual planning application.

How do daylight, sunlight and overlooking affect a new build design?

London boroughs assess new dwellings against their effect on the daylight and sunlight reaching neighbouring homes and gardens, commonly using the 45-degree rule as an initial check on a proposal's massing and position relative to neighbouring windows, alongside more detailed daylight and sunlight assessment on sensitive sites. Overlooking and loss of privacy from new windows, upper floors or roof terraces are assessed similarly, and often shape decisions on window placement, floor-to-floor heights and the overall footprint and massing of the new building. Designing with these constraints from the earliest sketch stage, rather than adjusting for them after a refusal, is one of the main advantages of instructing feasibility and pre-application work before a full planning set.

New build project stages
StageWhat it establishesTypical fee guide
FeasibilityWhether the plot can support a new dwelling and the likely constraintsQuoted individually, from within the £2,500 new build fee
Pre-application adviceWritten borough feedback on the scheme before a full applicationQuoted individually alongside the planning fee
Full planning drawingsThe complete drawing set submitted for planning permissionFrom £2,500
Building regs and structuralConstruction-ready drawings and calculations for buildingFrom £2,200–£3,850, quoted once planning is settled
Sheet from a new build drawings package drawn for a Isle of Dogs property in E14, showing the existing and proposed arrangement at scale
A sheet from the new build drawings package we submit to London Borough of Tower Hamlets for Isle of Dogs (E14) properties.
FAQ

New Build Drawings in Isle of Dogs E14 — FAQs

How much do new build drawings cost in London?+
New build drawings start from £2,500 for feasibility and a full planning drawing set on a straightforward infill or backland plot, with building regulations and structural drawings quoted separately once the planning design is agreed.
Can any garden or backland plot be built on in London?+
Not necessarily — backland and garden plots are assessed on access, overlooking, loss of garden amenity for neighbours and borough policy, and a feasibility assessment gives an honest early view of whether a scheme is likely to be supported.
Do I need pre-application advice before a full new build application?+
It is not mandatory, but for a new dwelling — where the principle of development is often the main issue — pre-application advice can surface concerns early enough to address them in the design, reducing the risk of refusal.
Do you handle building regulations and structural drawings for a new build, or only planning?+
Both — the full new build service covers planning, building regulations and structural drawings from one in-house team, so the design stays consistent from feasibility through to construction-ready drawings.
How long does a new build project take from feasibility to planning permission?+
This varies with site complexity and whether pre-application advice is sought, but a full planning application is determined within the statutory period the borough applies to the application type, once submitted via the Planning Portal.
Do I need planning permission for an extension in Tower Hamlets?+
Frequently, yes. A high proportion of the borough sits within a conservation area — Spitalfields, Wapping Pierhead and Tredegar Square among them — where permitted development is removed. On unlisted homes outside a conservation area a rear extension may still qualify. We check your address against the designations first and can confirm permitted development with a Lawful Development Certificate where it qualifies.
My Tower Hamlets property is listed — what consent do I need?+
Listed-building consent is usually required alongside or instead of planning permission, and internal as well as external changes can be controlled. The Georgian terraces around Spitalfields carry a high density of listed buildings. We screen listing status for your address first and prepare the heritage-led drawings and justification the council expects.
Can you handle a warehouse or riverside conversion in Wapping or Limehouse?+
Yes. The Wapping and Limehouse riverside carries its own townscape, conservation and flood-zone context, and conversions there are assessed against design control near the Thames. We prepare drawings that respond to that setting and evidence the flood-risk considerations, confirming the constraints for your specific building before design begins.
How long does Tower Hamlets Council take to decide?+
Tower Hamlets determines most householder applications within the statutory eight-week period once validated; listed-building, conservation and riverside cases can involve additional consultation. We prepare submissions to the council's validation and design standards to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Tower Hamlets?+
We agree a fixed fee before we start, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until the council approves. A conservation-area extension, a listed-building scheme and a riverside conversion differ in the evidence required, so we quote once we have seen your address and project rather than by the hour.
Free Fixed Quote

Get your free Isle of Dogs planning assessment

Tell us your Isle of Dogs (E14) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.