MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportNew Build Drawings in Ealing

Single-storey rear extension opening onto a London garden, a common Ealing family-home project
Ealing · London

New Build Drawings in Ealing

Fixed-fee, MCIAT-chartered new build drawings for Ealing homeowners — London Borough of Ealing validation and local constraints handled from the start.

Free Ealing planning assessment

Tell us your Ealing address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Ealing pairs generous Edwardian and Victorian housing stock with some of West London's most protective conservation control, so the right route for an extension or loft depends heavily on where in the borough you are. The stock ranges from Edwardian and Victorian terraces through 1930s Metro-land semi-detached homes in Perivale, Greenford and Northolt to the Arts-and-Crafts houses of Bedford Park. A rear extension in Northolt is a very different application from a roofline change in Bedford Park, and treating them the same is how schemes stall.

The constraints matter early. The London Borough of Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and applies further control to front-garden hardstanding in parts of the borough. Its conservation areas — Bedford Park, Ealing Green, Pitshanger, Hanwell Village Green and St Stephen's — apply strict control over dormers, materials and front elevations, Bedford Park most tightly of all. Mature street trees carry Tree Preservation Orders, and aircraft-noise considerations apply toward the west of the borough, so the address determines the approach.

We prepare Ealing planning drawings to the council's validation standards, checking permitted development eligibility first and designing to Ealing's residential extension guidance so applications are validated without a query. On the Metro-land semis of Perivale and Greenford that usually means confirming a hip-to-gable or dormer loft as permitted development with a Lawful Development Certificate; in Bedford Park and the other conservation areas it means a full householder application designed to the area's character. The fee is fixed and agreed up front, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Ealing approves. Our validation-first approach and roughly seven-day drawing turnaround keep most applications inside the statutory eight-week determination.

Single-storey rear extension opening onto a London garden, a common Ealing family-home project
Isometric illustration of a Ealing home extension design
Proposed floor plan
Ealing

Planning in Ealing: what to know before you apply

Ealing operates a borough-wide Article 4 direction removing permitted development rights for HMO conversions, and its conservation areas — Bedford Park especially — apply strict control over dormers, materials and front elevations. We flag these before drawing.

Typical Ealing housing stock

Edwardian and Victorian terraces, 1930s Metro-land semi-detached homes, and the Arts-and-Crafts houses of Bedford Park.

Areas we regularly draw for in Ealing

Ealing Broadway · Acton · Hanwell · Greenford · Northolt · Perivale · Southall

What the numbers say about Ealing planning decisions

These are London Borough of Ealing’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

All development decided in Ealing

Every planning application London Borough of Ealing decided over the four quarters to 2026 Q1, not only householder work — a new dwelling is decided in this wider pool.

Applications decided1,973
Granted1,667
Refused306
GrantedAcross all development types, so it is not comparable with the householder rate84%
Householder applications within itThe rest is the pool a new dwelling is decided in993

Source: Ministry of Housing, Communities and Local Government (PS2 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

If London Borough of Ealing refuses: appeal outcomes

Planning appeals against London Borough of Ealing determined by the Planning Inspectorate, 2021–2026. Enforcement notices and withdrawn cases are excluded.

Appeals determined478
Allowed146
Dismissed332
Householder appeals allowedFrom 204 householder appeals. England average 36%44%

Source: Planning Inspectorate appeals casework. Open Government Licence v3.0 Extracted 2026-08-16.

New Build Drawings for Ealing homes: the package and the process

A new dwelling is a full application rather than a householder one, and the drawing set reflects that: site layout with levels and boundaries, floor plans and elevations for the new building, sections showing how it sits in the ground, and street-scene elevations placing it against what is already there.

Two packages follow the approval — the planning set and the construction set — and they have to stay in step. Foundation design, drainage strategy, thermal performance and fire strategy are drawn for Building Control against the same geometry that was granted permission, so the built house matches the approved one.

An infill plot is designed against its neighbours. Plot width, the building line either side, and the ridge heights next door set what the new house can be — and on a tight urban site those constraints usually shape the design more than the brief does.

Is my plot suitable for a new build in London?

A feasibility assessment looks at plot size and shape, access, existing boundary conditions, relevant planning policy for the borough, and the likely impact of a new dwelling on neighbouring properties before any design work begins. Infill plots — a gap between existing buildings on a street — and backland plots — a garden or yard site behind existing houses, reached by a shared access — each raise different issues: infill schemes are usually judged on how well they match the scale, spacing and character of the street, while backland schemes are judged heavily on overlooking, garden loss for neighbours, and whether the access arrangement is acceptable. A feasibility study gives an honest view of whether a scheme is likely to succeed before you commit to full drawings.

What does pre-application advice add to a new build project?

Pre-application advice is a formal, paid process most London boroughs offer, where planning officers give written feedback on a proposed scheme before a full application is submitted. For a new build — where the principle of development itself is often the main issue, not just the design details — this feedback can be invaluable: it surfaces concerns around density, massing, daylight and sunlight or heritage context early enough to be addressed in the drawings, rather than discovered for the first time as a refusal reason months into a full application. We prepare and submit pre-application enquiries as part of the new build service where it is likely to strengthen the eventual planning application.

How do daylight, sunlight and overlooking affect a new build design?

London boroughs assess new dwellings against their effect on the daylight and sunlight reaching neighbouring homes and gardens, commonly using the 45-degree rule as an initial check on a proposal's massing and position relative to neighbouring windows, alongside more detailed daylight and sunlight assessment on sensitive sites. Overlooking and loss of privacy from new windows, upper floors or roof terraces are assessed similarly, and often shape decisions on window placement, floor-to-floor heights and the overall footprint and massing of the new building. Designing with these constraints from the earliest sketch stage, rather than adjusting for them after a refusal, is one of the main advantages of instructing feasibility and pre-application work before a full planning set.

New build project stages
StageWhat it establishesTypical fee guide
FeasibilityWhether the plot can support a new dwelling and the likely constraintsQuoted individually, from within the £2,500 new build fee
Pre-application adviceWritten borough feedback on the scheme before a full applicationQuoted individually alongside the planning fee
Full planning drawingsThe complete drawing set submitted for planning permissionFrom £2,500
Building regs and structuralConstruction-ready drawings and calculations for buildingFrom £2,200–£3,850, quoted once planning is settled
Sheet from a new build drawings package prepared for a Ealing property, drawn to London Borough of Ealing validation standards
A sheet from the new build drawings package we submit to London Borough of Ealing.
FAQ

New Build Drawings in Ealing — FAQs

How much do new build drawings cost in London?+
New build drawings start from £2,500 for feasibility and a full planning drawing set on a straightforward infill or backland plot, with building regulations and structural drawings quoted separately once the planning design is agreed.
Can any garden or backland plot be built on in London?+
Not necessarily — backland and garden plots are assessed on access, overlooking, loss of garden amenity for neighbours and borough policy, and a feasibility assessment gives an honest early view of whether a scheme is likely to be supported.
Do I need pre-application advice before a full new build application?+
It is not mandatory, but for a new dwelling — where the principle of development is often the main issue — pre-application advice can surface concerns early enough to address them in the design, reducing the risk of refusal.
Do you handle building regulations and structural drawings for a new build, or only planning?+
Both — the full new build service covers planning, building regulations and structural drawings from one in-house team, so the design stays consistent from feasibility through to construction-ready drawings.
How long does a new build project take from feasibility to planning permission?+
This varies with site complexity and whether pre-application advice is sought, but a full planning application is determined within the statutory period the borough applies to the application type, once submitted via the Planning Portal.
Do I need planning permission for a rear extension in Ealing?+
Many Ealing semis and terraces keep permitted development rights for a single-storey rear extension, so a full application isn't always needed. But the borough-wide Article 4 direction on HMO conversions, and conservation areas such as Bedford Park and Pitshanger, remove or restrict those rights in places. We check your address against the designations first and, where it qualifies, confirm permitted development with a Lawful Development Certificate.
What extra control applies in Bedford Park?+
Bedford Park is one of West London's most tightly controlled conservation areas, with detailed control over materials, rooflines, windows and front elevations. A standard permitted-development dormer or cladding change usually won't apply; instead we design to the area's Arts-and-Crafts character and prepare a full householder application with the elevations and materials the council expects — the reliable route to approval there.
How long does Ealing Council take to decide a householder application?+
Ealing determines most householder applications within the statutory eight-week period once they are validated. The commonest cause of delay is a validation query over missing or inconsistent drawings, so we prepare Ealing submissions to the council's validation checklist — correctly scaled existing and proposed plans, elevations and a location plan — to avoid that back-and-forth.
Can you help with a loft conversion on a 1930s Ealing semi?+
Yes. Ealing's Metro-land semis in Perivale, Greenford and Northolt suit hip-to-gable and dormer loft conversions, which frequently qualify as permitted development on semi-detached homes within the volume limits. We confirm eligibility against those limits and any Article 4 or conservation constraint, then produce the planning and building-regulations drawings.
How much do planning drawings cost in Ealing?+
We work to a fixed fee agreed before we start, typically around 30% below an architect's charge for the same council-accepted drawings, with free redraws until Ealing grants approval. The exact figure depends on the project — a single-storey rear extension differs from a double-storey or a loft — so we quote once we understand your scheme rather than on an open-ended hourly basis.
Free Fixed Quote

Get your free Ealing planning assessment

Tell us your Ealing address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.