MCIAT chartered drawings · Fixed fees across all 33 London boroughs and Essex
25 Eccleston Place, Victoria, London SW1W 9NFhello@drawingsdirect.co.uk020 7864 7245WhatsApp

Free 2026 London Planning Report — New build drawings in Bexley

Suburban high street around a war memorial and a mature tree
Bexley · London

New build drawings in Bexley

A new home in Bexley, whether concrete-framed, brick or timber, needs planning drawings that Bexley Council can read and decide. We prepare the full set from £1,450. Of the 1,258 planning decisions the council made in the latest four quarters, 1,126 were grants.

Fixed fee from £1,250 drawings + £200 survey (£1,450 total) · all prices

Check your property — free

60 seconds now. A fixed, no-obligation quote back within one working day — and we’ll tell you if you don’t even need planning.

No obligation · No spam · Reply within 1 working day

Prefer to talk it through?

Bexley's decisions, read plainly

In the four quarters to 2026 Q2 Bexley made 1,258 planning decisions of every kind, and 1,126 of them were grants (our analysis of MHCLG planning application statistics, table PS2). That count covers everything from small alterations to new dwellings, so it describes the council's general stance, not the odds for any one site.

Refusals that go to appeal are a separate record. Bexley has had 363 planning appeals decided since 2021, and 30% were allowed (our analysis of the Planning Inspectorate Casework Database). The planning appeal glossary entry explains how that route works.

What a new house application is made of

Think of the set as answers to the questions a case officer will ask: where is it (location and block plans), what is it (floor plans, elevations, sections), how does it fit the street (a street scene and design statement) and how will it be built. The materials are your choice, and concrete frames and blockwork are as drawable as brick. Our new build drawings page lists the full set, and the Bexley planning drawings page covers the wider planning package.

Long terrace of brick cottages leading to a church tower
Flat-fronted stock brick terrace with brightly painted front doors

The national register holds 31 conservation-area entries still in force for Bexley (our analysis of the MHCLG Planning Data Platform conservation-area dataset); whether your plot is in one is shown on Bexley Council's conservation area map.

Our analysis of MHCLG Planning Data Platform conservation-area and article-4-direction datasets (bulk snapshot retrieved 14 Aug 2026). www.planning.data.gov.uk

How long the council has

An application that is not major development must be decided within 8 weeks of receipt, and major development within 13 weeks (Development Management Procedure Order, article 34). A longer period can be agreed in writing.

Heritage and the statement it triggers

The national register holds 31 conservation-area entries still in force for Bexley (our analysis of the MHCLG Planning Data Platform conservation-area dataset); whether your plot is in one is shown on Bexley Council's conservation area map. In one, development of one or more dwellings needs a design and access statement, according to the government's guidance on making an application. The conservation area glossary entry covers the other constraints.

DrawingsDirect sample planning sheet with proposed plans and elevations at 1:100 and a site plan at 1:500
Sample drawing

Fees side by side

Bexley charges £610 per dwellinghouse for a full application for fewer than ten dwellinghouses, in force from 1 April 2026. Our new build drawings start from £1,450; the pricing page shows how that sits beside our other fixed fees.

Data

Sources

Every figure on this page, where it comes from and a link to the original.

FigureSourceLink
1,126Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
1,258Our analysis of MHCLG planning application statistics, table PS2 (district open data table) (released 24 Sep 2026, quarters to 2026 Q2)www.gov.uk
363Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
30%Our analysis of Planning Inspectorate Casework Database (released 1 Oct 2026 (Casework Database 2609))www.gov.uk
31Our analysis of MHCLG Planning Data Platform conservation-area and article-4-direction datasets (bulk snapshot retrieved 14 Aug 2026)www.planning.data.gov.uk
£610Statutory fee from 1 April 2026, SI 2012/2920 Sch 1 Pt 2 category 1(3)(a): full application for the erection of fewer than 10 dwellinghouses, per dwellinghouseassets.publishing.service.gov.uk
8 weeksDMPO 2015 art 34(2)(b): decision period for an application that is not major development (source wording: 8 weeks beginning with the day immediately following receipt)www.legislation.gov.uk
13 weeksDMPO 2015 art 34(2)(a): decision period for major development (source wording: 13 weeks beginning with the day immediately following receipt)www.legislation.gov.uk
one or more dwellingsPlanning practice guidance, Making an application, paragraph 030 (ID 14-030-20140306): design and access statement required in a conservation area or World Heritage Site for development of one or more dwellingswww.gov.uk
£1,450DrawingsDirect starting fixed fee for new build drawings, from the published price listdrawingsdirect.co.uk
FAQ

Questions people ask

Can you draw a concrete-framed house in Bexley?
Yes. The planning drawings show the form and appearance of the building. The structural frame is detailed later with an engineer.
How many planning decisions did Bexley grant?
1,126 of 1,258 in the four quarters to 2026 Q2, across all application types.
What does a new house cost to apply for?
The council fee is £610 per dwellinghouse for fewer than ten dwellinghouses. Our drawings start from £1,450.