MCIAT chartered drawings · Fixed fees across all 33 London boroughs

Free 2026 London Planning ReportHouse Extension Drawings in Westminster

Red-brick mansion block and stucco terraces of the kind that dominate Westminster's Pimlico and Marylebone
Westminster · London

House Extension Drawings in Westminster

Fixed-fee, MCIAT-chartered house extension drawings for Westminster homeowners — Westminster City Council validation and local constraints handled from the start.

Free Westminster planning assessment

Tell us your Westminster address and project. A fixed quote and free planning appraisal land within one working day.

No obligation · No spam · Reply within 1 working day

Westminster is among the most heritage-dense authorities in the country: the great majority of its housing sits within a conservation area — Belgravia, Mayfair, Pimlico, Bayswater, Maida Vale and St John's Wood among them — listed buildings are commonplace, and much of the residential stock is mansion-block or garden-square terrace where external alterations are tightly controlled. The character runs from stucco-fronted Georgian and Victorian townhouses and garden-square terraces to red-brick and Portland-stone mansion blocks across the West End and Marylebone. Permitted development rarely applies, and applications turn on careful, context-led drawings and, frequently, listed-building consent.

Because so much of the city lies within a conservation area and a high proportion of buildings are listed, a full planning application — and often listed-building consent — is usually required even for modest works in Belgravia, Mayfair, Pimlico or Bayswater. The City Plan basement policy requires a basement impact assessment and limits the scale of any below-ground extension, and mansion-block and estate-management leases frequently require the freeholder's consent alongside planning, since either the council or the freeholder can block an otherwise sound proposal. We take a validation-first approach, resolving the conservation, listing, basement and lease position for your exact address before a line is drawn.

We prepare Westminster planning and listed-building submissions to the council's exacting validation and design standards, producing the same council-accepted drawings an architect would — usually at around 30% less. The fee is fixed and agreed up front, drawings typically turn around in about seven days, and we redraw free until the council approves. Most householder applications are determined within the statutory eight-week period once validated, though listed-building, basement and conservation cases frequently attract additional consultation, so a complete, correctly scaled submission that answers the heritage questions early is the best way to keep the application moving.

Red-brick mansion block and stucco terraces of the kind that dominate Westminster's Pimlico and Marylebone
Isometric illustration of a Westminster home extension design
Proposed floor plan
Westminster

Planning in Westminster: what to know before you apply

Because the great majority of Westminster falls within a conservation area — and a high proportion of buildings are listed — a full planning application, and often listed-building consent, is usually required even for modest works. The City Plan basement policy requires a basement impact assessment and limits scale, and mansion-block leases frequently require the freeholder's consent alongside planning. We resolve these before drawing.

Typical Westminster housing stock

Stucco-fronted Georgian and Victorian townhouses, garden-square terraces, red-brick and Portland-stone mansion blocks, and a very high concentration of listed buildings across the West End and the garden squares.

Areas we regularly draw for in Westminster

Belgravia · Mayfair · Pimlico · Marylebone · Bayswater · Maida Vale · St John's Wood · Westminster

What the numbers say about Westminster planning decisions

These are Westminster City Council’s own reported figures, published by government rather than estimated by us. They are what we design against — a borough that refuses one householder application in five needs a different drawing package from one that refuses one in twenty.

Permitted development in Westminster

Larger householder extensions put to Westminster City Council under the prior-approval route, and lawful-development certificates decided, over eight quarters.

Prior approval not requiredWent ahead without a full application0
Prior approval granted0
Prior approval refused0
Building upwards, prior approval refused0
Certificates of lawful development decided376

Source: Ministry of Housing, Communities and Local Government (PS1 district planning application statistics). Open Government Licence v3.0 Extracted 2026-08-16.

What removes permitted development in Westminster

Live entries on the national planning registers for Westminster City Council. Article 4 directions withdraw permitted development rights, so a project inside one needs a full application rather than prior approval. Revoked and expired entries are excluded.

Article 4 directions in force10
Areas they coverOne direction can cover many separate areas10
Conservation areasPermitted development is already narrower inside one56

Source: MHCLG Planning Data Platform. Open Government Licence v3.0 Extracted 2026-08-16.

House Extension Drawings for Westminster homes: the package and the process

Extension drawings are read for their dimensions. The proposed plan needs depth measured from the original rear wall — not from a previous extension — eaves and ridge heights taken from existing ground level, and the distance to each boundary marked. A site plan showing how much garden remains is what an officer reaches for when the amenity question comes up.

We draw the existing building accurately first, because everything else is measured from it. Where the original footprint has already been added to, that history goes on the drawing: it decides which allowances are still available and it is the first thing an officer checks against the council's own records.

The plot decides the extension type long before taste does. A mid-terrace has depth to work with and an alley if it is lucky; a semi has one clear flank; a detached house can go wide. Reading the building form first is what stops a design being drawn that the plot cannot take.

Which extension types do you draw?

Every London extension is shaped by the plot, the neighbours and the borough's design guidance. We draw them all.

Rear extension

A single-storey rear extension is often permitted development within depth limits — ideal for an open-plan kitchen-diner.

Side-return

Fills the alley beside a Victorian terrace, widening the ground floor without losing garden.

Wraparound

Combines a rear and side-return extension for a transformative ground floor, usually needing planning permission.

Double-storey

Adds space above and below, subject to tighter scale and neighbour-impact scrutiny.

Basement

Creates space downward where footprint is limited, with structural and party-wall care.

Do I need planning permission for a house extension in London?

Single-storey rear extensions within permitted development limits (up to 6m for terraced/semi-detached homes under the larger-home scheme, subject to neighbour consultation) may not need a full application. Wraparounds, double-storeys and anything in a conservation area usually do. We assess your plot and recommend the right route before drawing. The current depth, height and eaves limits are set out in full in the guide to planning permission for a rear extension, and where you would rather one practice ran the design, the application and the building-regulations stage together, Architectural Drawings covers that full scope.

How do you maximise the footprint the council will approve?

We know each borough's depth, height and daylight standards, so we design to the edge of what will be approved rather than guessing — and we check the 45-degree neighbour daylight rule and any rear building line before submission. Where a plot is tight we test a permitted-development scheme against a slightly larger householder application and show you the trade-off in space, cost and timescale, so the drawn scheme is the one that actually maximises value rather than just floor area.

Typical London extension drawing packages
ExtensionTypical routePackageFee from
Single-storey rearPermitted development / householderPlanning + building regs£1,100
Side-returnHouseholder planningPlanning + building regs + structural£1,600
WraparoundHouseholder planningFull package + structural£2,200
Double-storeyHouseholder planningFull package + structural£2,400
Sheet from a house extension drawings package prepared for a Westminster property, drawn to Westminster City Council validation standards
A sheet from the house extension drawings package we submit to Westminster City Council.
FAQ

House Extension Drawings in Westminster — FAQs

How far can I extend without planning permission in London?+
Under permitted development, single-storey rear extensions can reach 3m (terraced/semi) or 4m (detached), or up to 6–8m under the prior-approval larger-home scheme — but conservation areas and Article 4 directions can remove these rights. We check your property first.
Do extension drawings include structural calculations?+
Our full package includes structural drawings and calculations coordinated in-house, so your builder can price and build without waiting on an engineer.
How long do extension drawings take?+
Typically about 7 days from survey to a full drawing set delivered to your online portal.
Will my rear extension need a party wall agreement?+
If you build up to or on a shared boundary, excavate near a neighbour's foundations, or cut into a party wall for a steel, the Party Wall etc. Act 1996 usually applies. Our drawings show the works clearly so a party wall surveyor — or your neighbour — can see exactly what is proposed, which keeps that process quick.
Can I extend a house in a conservation area?+
Yes, but conservation areas and Article 4 directions commonly remove permitted development for rear and side extensions, so the work needs a full householder application designed to the council's heritage guidance. We confirm your property's designation before recommending a route.
Do I need planning permission for works in Westminster?+
Almost always. The great majority of Westminster falls within a conservation area and a high proportion of buildings are listed, so a full planning application — and often listed-building consent — is usually required even for modest works. Permitted development rarely applies. We screen conservation, listing and lease constraints for your address before recommending a route.
I live in a mansion block — what extra consent might I need?+
Much of Westminster's stock is mansion-block or garden-square terrace, and the lease frequently requires the freeholder's consent alongside planning for external alterations. We confirm the lease position early and design a scheme that satisfies both the freeholder and the council, since either can block an otherwise sound proposal.
Will I need a Basement Impact Assessment in Westminster?+
Usually, for below-ground works. The City Plan basement policy requires a basement impact assessment and limits scale. If you are considering a basement or lower-ground extension we flag the requirement early and coordinate the structural and drainage input so the application is complete when submitted.
How long does Westminster City Council take to decide?+
Westminster determines most householder applications within the statutory eight-week period once validated, though listed-building, basement and conservation cases frequently attract additional consultation. We prepare submissions to the council's exacting validation and design standards to avoid the drawing queries that cause most delays.
How much do planning drawings cost in Westminster?+
We agree a fixed fee before we start, typically around 30% below an architect's fee for the same council-accepted drawings, with free redraws until the council approves. Heritage-led, listed-building and basement schemes require more evidence than a standard extension, so we quote once we understand your address and scheme rather than by the hour.
Free Fixed Quote

Get your free Westminster planning assessment

Tell us your Westminster address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.