
HMO Conversion Drawings in Earl's Court SW5
Fixed-fee, MCIAT-chartered hmo conversion drawings for Earl's Court (SW5) homeowners — Royal Borough of Kensington and Chelsea validation and local constraints handled from the start.
Earl's Court (SW5) is a district of grand stucco garden-square terraces — Earl's Court Square, Nevern Square and Philbeach Gardens — most of them converted into mansion and conversion flats. Projects here are typically flat reconfigurations, rear-closet and lower-ground alterations, and lightwell or modest basement works rather than whole-house extensions.
As the terraces fall within RBKC conservation areas and are largely in multiple occupation, we prepare drawings that respect the uniform stucco frontages and coordinate the leasehold and party-wall realities of flats, meeting the Royal Borough of Kensington and Chelsea's standard on external detail and subterranean control.


Planning in Earl's Court (SW5): what to know before you apply
There is no published householder Article 4 direction, but conservation-area status across SW5 withdraws most permitted-development rights and shapes what flat and rear alterations are acceptable. RBKC's subterranean development policy applies to lightwells and lower-ground excavation.
Typical Earl's Court housing stock
SW5 is characterised by tall stucco-fronted Victorian terraces set around Earl's Court Square, Nevern Square and Philbeach Gardens, the majority long since divided into mansion and conversion flats. Because whole houses are rare, work here is dominated by flat reconfigurations, rear-closet and lower-ground alterations, and lightwell or modest basement schemes.
Streets we regularly draw for in Earl's Court
Philbeach Gardens · Eardley Crescent · Nevern Square · Bina Gardens
What SW5 is actually built of
Measured from 214 classified residential buildings in SW5, not from a description of the area.
Earl's Court SW5 housing mix
Residential building form across the SW5 postcode district, from 214 classified buildings.
| Attached on more than one side | 85% |
|---|---|
| Attached on one side | 14% |
| Detached | 1% |
| Median building footprint | 100 m² |
| Addresses per buildingAbove about 2 means flats and maisonettes dominate | 6.17 |
| Buildings classified | 214 |
Source: Ordnance Survey National Geographic Database (derived statistics). Contains OS data © Crown copyright and database right 2026. Contains Royal Mail data © Royal Mail copyright and database right 2026. Extracted 2026-08-17.
HMO Conversion Drawings for Earl's Court (SW5) homes: the package and the process
An HMO scheme is drawn against a schedule. Every bedroom is dimensioned with its usable floor area stated, shared kitchen and bathroom provision is counted against the number of occupants, and the layout has to hold up against the space standards the licensing team applies.
The fire strategy is drawn, not described: protected escape route, fire doors and their ratings, alarm coverage by room, and compartmentation between floors. Licensing and building control assess the same drawing set from different angles, so it has to satisfy both without contradiction.
Room count is a function of the existing plan. A large semi or detached house with generous rooms can meet the space standards without subdivision, while a narrow terrace usually cannot reach the same occupancy without creating rooms that fall below the minimum floor area.
C4 small HMO or sui generis large HMO — which applies to your property?
The distinction matters because it decides which rules apply. A small HMO housing three to six unrelated sharers who share amenities is Class C4. A large HMO of seven or more occupants is sui generis and always needs planning permission, since sui generis uses sit outside the permitted development system entirely. The line also shifts with occupancy — a property let to six sharers today can tip into sui generis territory the moment a seventh tenancy is signed, which changes the planning position even though nothing about the building itself has changed. We assess your proposed occupancy and layout against both definitions before drawing, so the application matches how the property will actually be let.
Do I need planning permission for an HMO conversion in London?
Converting a family home (C3) into a small HMO (C4) is technically permitted development under national rules, but a large number of London boroughs have made an Article 4 direction that removes this right across all or part of the borough — meaning a full planning application is required even for a small, compliant HMO. Article 4 directions vary street by street in some boroughs, so two similar houses a few doors apart can sit on opposite sides of the line. Any large HMO (sui generis) needs planning permission everywhere, regardless of Article 4. We check your specific address against the relevant borough's Article 4 direction before recommending a route, since guessing wrong wastes both time and application fees.
Mandatory and additional HMO licensing — what's required?
Most HMOs need a licence from the council, separate from any planning permission. A licence application typically has to demonstrate that the property meets fire safety, amenity and space standards, that gas and electrical installations are safety-certified, and that the landlord or managing agent is a fit and proper person to hold it.
Mandatory licensing
Applies to any HMO of five or more occupants forming two or more households, regardless of the number of storeys — a national requirement in every London borough.
Additional licensing
Many boroughs extend licensing to smaller HMOs, typically three or four occupants, across all or part of their area. We check the current scheme for your borough before you apply, since schemes and boundaries change.
| Factor | C4 small HMO (3–6 sharers) | Sui generis large HMO (7+) |
|---|---|---|
| Use class | C4 | Sui generis |
| Planning permission | Often needed due to Article 4 directions in most boroughs | Always needed |
| Licensing | Mandatory if 5+ occupants; additional licensing in many boroughs | Mandatory |
| Typical drawing package | From £1,400 | Full planning + building regs, from £2,200 |

HMO Conversion Drawings in Earl's Court SW5 — FAQs
How much do HMO conversion drawings cost in London?+
Is HMO conversion permitted development in London?+
Do I need a licence as well as planning permission?+
Do I need an architect for an HMO conversion?+
How long do HMO conversion drawings take?+
Do I need planning permission for works in Kensington & Chelsea?+
Can I build a basement in Kensington & Chelsea?+
My home is listed — what consent do I need?+
How long does the Royal Borough take to decide?+
How much do planning drawings cost in Kensington & Chelsea?+
Get your free Earl's Court planning assessment
Tell us your Earl's Court (SW5) address and ambition — we'll confirm feasibility, local constraints and a fixed fee within one working day.